Gammon Engineers And Contractors Interview Questions, Process, and Tips

Updated 26 Dec 2024

Top Gammon Engineers And Contractors Interview Questions and Answers

View all 18 questions

Gammon Engineers And Contractors Interview Experiences

Popular Designations

21 interviews found

Deputy General Manager Interview Questions & Answers

user image C Radhakrishnan

posted on 26 Dec 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the diesel consumption for Dence Bituen material.
  • Ans. 

    The diesel consumption for Dense Bitumen material varies depending on factors such as temperature, mix design, and equipment used.

    • Diesel consumption for Dense Bitumen material is typically measured in liters per ton of material produced.

    • Factors such as temperature of the mix, mix design, and type of equipment used can affect the diesel consumption.

    • For example, a higher temperature mix may require more diesel to heat th...

  • Answered by AI
  • Q2. Brief your Past Experience
  • Ans. 

    I have over 10 years of experience in management roles, leading teams and implementing strategic initiatives.

    • Managed a team of 50+ employees in a retail setting, increasing sales by 20% within one year

    • Implemented new customer service protocols that resulted in a 15% increase in customer satisfaction

    • Led cross-functional projects to streamline operations and reduce costs by 10%

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Prepare your job knowledge.
2. A specific answer is required for the Question.
3. Your language should be apparent communication.
4. Avoid unwanted explanations when answering the question.

Deputy General Manager Interview Questions asked at other Companies

Q1. Share list of controls which are required to safe guard the organizations from perimeter to end points.
View answer (2)

Store Officer Interview Questions & Answers

user image Anonymous

posted on 30 Sep 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I was interviewed in Mar 2024.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Types of ledger
  • Ans. 

    Types of ledger include general ledger, subsidiary ledger, and control ledger.

    • General ledger contains all financial transactions of a business.

    • Subsidiary ledger provides detailed information on specific accounts.

    • Control ledger summarizes information from subsidiary ledgers.

    • Examples: Sales ledger, Purchase ledger, Cash ledger.

  • Answered by AI
  • Q2. Purchase ledger and transfer ledger
Round 3 - One-on-one 

(2 Questions)

  • Q1. Types of ledger
  • Ans. 

    Types of ledger include general ledger, subsidiary ledger, and control ledger.

    • General ledger contains all financial transactions of a business.

    • Subsidiary ledger provides detailed information on specific accounts.

    • Control ledger summarizes information from subsidiary ledgers.

    • Examples: Sales ledger, Purchase ledger, Cash ledger.

  • Answered by AI
  • Q2. What is mean Fifo and lifo
  • Ans. 

    FIFO and LIFO are inventory management methods. FIFO stands for First In, First Out, while LIFO stands for Last In, First Out.

    • FIFO means that the oldest inventory items are sold first, while LIFO means that the newest inventory items are sold first.

    • FIFO is commonly used in industries with perishable goods, such as food, while LIFO is more suitable for industries with non-perishable goods.

    • FIFO results in lower tax liabi...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Skills evaluated in this interview

Store Officer Interview Questions asked at other Companies

Q1. Maintaining stock Upload, Issue, Receipt of material in The System Define maximum & minimum stock level for all type materials. Generate nonmoving item list & highlight to concern H.O.D. Monitoring of all incoming material. Maintain... read more
View answer (1)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What is the process of earthing?
  • Ans. 

    Earthing is the process of connecting electrical equipment or installations to the earth to prevent electric shock and protect against electrical faults.

    • Earthing involves creating a connection between the electrical system and the earth.

    • It is done by burying a metal conductor, such as a copper rod, in the ground.

    • The metal conductor is connected to the electrical system using a wire or cable.

    • Earthing provides a path for...

  • Answered by AI
  • Q2. Which type of DGs used at your Site
  • Ans. 

    The type of DGs used at our site are diesel generators.

    • Diesel generators are commonly used as backup power sources in various industries.

    • They are reliable and can provide a continuous power supply during electrical outages.

    • DGs are often used in remote locations or areas with unreliable grid power.

    • They require regular maintenance and fuel supply to operate efficiently.

    • Examples of DGs used at our site include Cummins, Ca

  • Answered by AI
  • Q3. What is the difference between LT and HT line?
  • Ans. 

    LT line refers to Low Tension line while HT line refers to High Tension line.

    • LT line carries low voltage and is used for domestic and small-scale commercial purposes.

    • HT line carries high voltage and is used for industrial and large-scale commercial purposes.

    • LT line voltage is typically up to 440 volts, while HT line voltage is above 440 volts.

    • LT lines are usually overhead lines, while HT lines can be both overhead and ...

  • Answered by AI
  • Q4. Which type of Circuit Breakers you used at Site?
  • Ans. 

    We used different types of circuit breakers at the site depending on the specific requirements.

    • We used air circuit breakers (ACBs) for low voltage applications.

    • For medium voltage applications, we used vacuum circuit breakers (VCBs) or oil circuit breakers (OCBs).

    • In high voltage installations, we used sulfur hexafluoride (SF6) circuit breakers.

    • For specialized applications like generator protection, we used differential ...

  • Answered by AI
  • Q5. How big transformers you used at site
  • Ans. 

    The size of transformers used at the site varied depending on the specific requirements of the project.

    • Transformers used at the site were of different sizes based on the power demand of the electrical system.

    • For smaller projects, transformers with a capacity of around 100 kVA were used.

    • For medium-sized projects, transformers with a capacity ranging from 250 kVA to 500 kVA were used.

    • For larger projects, transformers wit...

  • Answered by AI
  • Q6. Which type of Batching Plant you used at Site
  • Ans. 

    We used a stationary type batching plant at the site.

    • We used a stationary type batching plant for our construction project.

    • The stationary batching plant had a higher production capacity compared to mobile plants.

    • It was equipped with multiple storage bins for different types of aggregates.

    • The plant had a conveyor belt system to transfer the aggregates to the mixer.

    • We used this type of batching plant because it provided

  • Answered by AI
  • Q7. At which project you are working

Interview Preparation Tips

Interview preparation tips for other job seekers - It dipends on the interviewer which type of questions he will ask.
But one thing important be confident while interview

Top Gammon Engineers And Contractors Junior Engineer Electrical Interview Questions and Answers

Q1. What is the difference between LT and HT line?
View answer (1)

Junior Engineer Electrical Interview Questions asked at other Companies

Q1. Transformer working principle, what oil use in Transformer, oil not add what happen.
View answer (1)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is Concrete mix design
  • Ans. 

    Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Involves selecting the right combination of materials like cement, aggregates, water, and admixtures

    • Proportions are determined based on desired strength, workability, durability, and other properties

    • Testing and adjusting the mix to meet specific project requirements

    • Examples ...

  • Answered by AI

Executive Quality Control Interview Questions asked at other Companies

Q1. How many weights are the in a balance calibration weight box.?
View answer (7)

Gammon Engineers And Contractors interview questions for popular designations

 Quantity Surveyor

 (2)

 Assistant General Manager

 (1)

 Assistant Manager

 (1)

 Assistant Manager Environment

 (1)

 Assistant Manager HR & Administration

 (1)

 Asst Store

 (1)

 Civil Site Engineer

 (1)

 Deputy General Manager

 (1)

Site Engineer Interview Questions & Answers

user image Rahul Mishra

posted on 6 Apr 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me M25 ratio
  • Ans. 

    M25 ratio refers to the mix ratio of concrete, commonly used in construction projects.

    • M25 ratio is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • This mix is commonly used for structural concrete works like columns, beams, and slabs.

    • The strength of concrete with M25 ratio is typically around 25 megapascals after 28 days of curing.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)

Get interview-ready with Top Gammon Engineers And Contractors Interview Questions

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. What is the HR life cycle
  • Ans. 

    HR life cycle refers to the stages of an employee's journey within an organization, from recruitment to exit.

    • The HR life cycle includes stages such as recruitment, onboarding, performance management, career development, and exit

    • Recruitment involves sourcing, screening, and selecting candidates for open positions

    • Onboarding includes orientation, training, and integration into the company culture

    • Performance management inv...

  • Answered by AI
  • Q2. Recruiting procedures

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and answer honestly and don’t panic be prepared

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (86)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Company management
  • Q2. Machine fitness
  • Q3. Eco friendly management
  • Q4. Road management
  • Q5. Electricals system
Round 2 - Group Discussion 

I love construction line but one thing please provide some extra pay

Interview Preparation Tips

Interview preparation tips for other job seekers - According to my suggestion I love construction line ❤️

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (63)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Why do you want work here
  • Q2. I have same kind of HR Admin experience in the post
Round 3 - HR 

(3 Questions)

  • Q1. I feel I am similar to this post I have same kind of HR Admin experience for the post
  • Q2. What are your shirt term goals
  • Q3. I would like to semy self in managerial roll

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good and great place to work.immense growth and career

Assistant Manager HR & Administration Interview Questions asked at other Companies

Q1. Waht challenges are facing while applying the HR strategy into business strategy.
View answer (2)

I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Diffrence between quantity survey and billing
  • Ans. 

    Quantity survey involves estimating and managing costs of construction projects, while billing is the process of invoicing clients for work done.

    • Quantity survey involves cost estimation, cost control, and contract administration.

    • Billing involves invoicing clients for work done, including labor, materials, and other expenses.

    • Quantity surveyors work closely with architects, engineers, and contractors to ensure projects a...

  • Answered by AI
  • Q2. Asking what type of work you did there

Interview Preparation Tips

Interview preparation tips for other job seekers - Before attending interview , to learn your field related things.

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Diffrence between quantity survey and billing
  • Ans. 

    Quantity survey involves estimating and managing costs of construction projects while billing is the process of invoicing clients for work done.

    • Quantity survey involves cost estimation, cost control, and cost management of construction projects.

    • Billing is the process of invoicing clients for work done on a project.

    • Quantity surveyors work closely with architects, engineers, and contractors to ensure that projects are co...

  • Answered by AI
  • Q2. Asking what type of work you did there

Interview Preparation Tips

Interview preparation tips for other job seekers - Before attending interview , to learn your field related things.

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

Gammon Engineers And Contractors Interview FAQs

How many rounds are there in Gammon Engineers And Contractors interview?
Gammon Engineers And Contractors interview process usually has 1-2 rounds. The most common rounds in the Gammon Engineers And Contractors interview process are Resume Shortlist, One-on-one Round and Technical.
How to prepare for Gammon Engineers And Contractors interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Gammon Engineers And Contractors. The most common topics and skills that interviewers at Gammon Engineers And Contractors expect are Contracts, Billing, Budgeting, Cash Flow Management and Contract Administration.
What are the top questions asked in Gammon Engineers And Contractors interview?

Some of the top questions asked at the Gammon Engineers And Contractors interview -

  1. How much weight full length of 12 mm tmt b...read more
  2. Which instruments used in tunnel excavati...read more
  3. What is the diesel consumption for Dence Bituen materi...read more

Tell us how to improve this page.

Gammon Engineers And Contractors Interview Process

based on 13 interviews

Interview experience

4.7
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Gammon Engineers And Contractors Reviews and Ratings

based on 280 reviews

4.0/5

Rating in categories

3.9

Skill development

3.9

Work-life balance

3.4

Salary

3.8

Job security

3.8

Company culture

3.3

Promotions

3.8

Work satisfaction

Explore 280 Reviews and Ratings
Assistant Manager
89 salaries
unlock blur

₹4.2 L/yr - ₹9.5 L/yr

Civil Engineer
43 salaries
unlock blur

₹2.4 L/yr - ₹5.8 L/yr

Deputy Manager
40 salaries
unlock blur

₹7 L/yr - ₹14 L/yr

Civil Site Engineer
21 salaries
unlock blur

₹1.6 L/yr - ₹5.5 L/yr

Plant Engineer
18 salaries
unlock blur

₹2.4 L/yr - ₹5 L/yr

Explore more salaries
Compare Gammon Engineers And Contractors with

Hindustan Construction Company

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Simplex Infrastructures

3.3
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview