Round 1 - Technical 

(1 Question)

  • Q1. What is Concrete mix design
  • Ans. 

    Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Involves selecting the right combination of materials like cement, aggregates, water, and admixtures

    • Proportions are determined based on desired strength, workability, durability, and other properties

    • Testing and adjusting the mix to meet specific project requirements

    • Examples ...

  • Answered by AI

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Quantity Surveying, Rate Analysis, Labour Rate, Reconciliation, BBS

Interview Preparation Tips

Interview preparation tips for other job seekers - I interview was good.
Good technical question I have faced.
Normal question was there and if anyone have general knowledge of Quantity survey, he can crack the interview.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. What are your exact responsibility in your organization?
  • Q2. What are your additional qualities?
  • Q3. AutoCAD, Excel, Friendly with all types of docs , Even the Contract Documents also
  • Ans. Maintain good relationship with Clients on the basis of my performance.
  • Answered by Atul anand
Round 2 - Technical 

(6 Questions)

  • Q1. What are work procedure in your organization in RA Bill preparation ?
  • Ans. 

    The work procedure in our organization for RA Bill preparation involves several steps.

    • Gathering all relevant project documents and information

    • Analyzing the project scope and specifications

    • Measuring and quantifying the work done on-site

    • Preparing detailed rate analysis for each item of work

    • Calculating the quantities and rates for each item

    • Preparing the bill of quantities (BOQ)

    • Cross-checking the BOQ with the project speci...

  • Answered by AI
  • Q2. Explain about the different types of bills you know about.
  • Ans. 

    Different types of bills in quantity surveying

    • Measurement bill: It includes the detailed measurements of various items of work.

    • Abstract bill: It provides a summary of all the measurements and quantities of work done.

    • Cost bill: It includes the cost of each item of work and the total cost of the project.

    • Final bill: It is the final settlement bill after completion of the project.

    • Interim bill: It is prepared at regular int...

  • Answered by AI
  • Q3. Tell me about the importance of contact documents in any type of bill prepation.
  • Ans. 

    Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.

    • Contact documents define the legal agreement between the parties involved in a construction project.

    • They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.

    • Contact documents provide clarity...

  • Answered by AI
  • Q4. How reconciliation performed?
  • Ans. 

    Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.

    • Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.

    • The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.

    • Reconciliation can be performed manually or using softw...

  • Answered by AI
  • Q5. What are the client instructions in your current project about document controlling?
  • Ans. As according to client, we have prepare and submit all the prepour and postpour docs with all test certificate if any even in mechanical or civil works before submission of Monthly RA bill.
  • Answered by Atul anand
  • Q6. Do you know AutoCAD & Excel well ?
  • Ans. 

    Yes, I am proficient in AutoCAD and Excel.

    • I have extensive experience using AutoCAD for creating and editing technical drawings.

    • I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.

    • I have successfully completed projects where I utilized both AutoCAD and Excel.

    • I am familiar with the various features and functions of both software.

    • I can efficiently generate quantity take-offs and cost es

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep updating yourself as according to Employer demands and market requirements and Always be honest to your interview that helps in your progress also.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Client Bill Related Question
Round 2 - One-on-one 

(1 Question)

  • Q1. Client Bill Related Question

I applied via Naukri.com and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Basic QS Billing related questions, mode of measurement etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Never give interview in this company if you have satisfied to your present job. They will offer lower salary & lower designation.
Very bad experience had with ncc. After clearing all rounds of interview HR asked "can you join in same salary?"
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Dec 2023.

Round 1 - Technical 

(5 Questions)

  • Q1. What is the standard deduction as per IS 1200?
  • Ans. 

    The standard deduction as per IS 1200 is a fixed amount that can be deducted from the measured quantities of certain items in a construction project.

    • The standard deduction is typically used for items like scaffolding, formwork, and centering in construction projects.

    • It is a fixed percentage of the measured quantity, usually ranging from 2% to 5% depending on the item and project.

    • The purpose of the standard deduction is...

  • Answered by AI
  • Q2. Steel reconciliation
  • Q3. Material properties
  • Ans. 

    Material properties refer to the characteristics and behavior of materials used in construction projects.

    • Material properties include density, strength, durability, thermal conductivity, and elasticity.

    • Understanding material properties is crucial for selecting the right materials for a project.

    • Examples of material properties affecting construction include water absorption in concrete and thermal expansion in metals.

  • Answered by AI
  • Q4. Price escalation
  • Q5. Rate Analysis, Budgeting, Client billing

I applied via Company Website and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Some basic questions of mathematics up to 10th class.

Round 3 - HR 

(3 Questions)

  • Q1. Current company role and responsibility
  • Q2. Why are you change your current company
  • Q3. What is your current salary and what's you accept to us

Interview Preparation Tips

Interview preparation tips for other job seekers - Please keep in mind iscode 1200 and cpwd specification volume1 and 2.

I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What is mode of measurement
  • Ans. 

    Mode of measurement refers to the standard method used to measure quantities in construction projects.

    • It is important to establish a clear mode of measurement to ensure consistency and accuracy in cost estimation.

    • Common modes of measurement include SMM7, CESMM, and NRM.

    • SMM7 (Standard Method of Measurement) is widely used in the UK for building works.

    • CESMM (Civil Engineering Standard Method of Measurement) is used for c...

  • Answered by AI
  • Q2. Deduction as per IS code for Connecte, Shuttering & Plaster
  • Ans. 

    Deduction as per IS code for Connecte, Shuttering & Plaster

    • As per IS code, deduction for connected items is 2.5% of the total quantity

    • For shuttering, deduction is 10% of the total surface area

    • For plaster, deduction is 20% of the total surface area

    • These deductions are made to account for wastage and overlapping

  • Answered by AI
  • Q3. Consumption for mortar 1:3 and 1:6 ratio
  • Ans. 

    The consumption for mortar 1:3 and 1:6 ratio depends on the area to be covered and thickness of the layer.

    • The consumption of mortar is calculated in terms of volume.

    • For 1:3 ratio, the mix proportion is 1 part cement and 3 parts sand.

    • For 1:6 ratio, the mix proportion is 1 part cement and 6 parts sand.

    • The thickness of the layer also affects the consumption of mortar.

    • The area to be covered is calculated by multiplying the...

  • Answered by AI
  • Q4. Reconciliation & wastage of materials

Interview Preparation Tips

Interview preparation tips for other job seekers - Soft skills reflect a lot about your personality. From how you carry yourself, to body language and intonation, everything is very important and is assessed in every interview.
Your skills and job understanding are both important for you to be a successful paramedic but your soft skills and performance in interview go a great way in helping you secure your dream job.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Sap IDM nolage
  • Q2. Personal interview

I applied via Approached by Company

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Hdpe pipe and supervisor
  • Ans. 

    HDPE pipe is a type of plastic pipe used for water supply and drainage systems. A supervisor oversees the installation and maintenance of the pipes.

    • HDPE pipes are lightweight and flexible, making them easy to install and transport.

    • They are resistant to corrosion and chemicals, making them ideal for use in harsh environments.

    • Supervisors ensure that the pipes are installed correctly and that any issues are addressed prom...

  • Answered by AI
  • Q2. History and political science
  • Q3. Science general knowledge
Round 3 - Group Discussion 

XXXXX

Interview Preparation Tips

Interview preparation tips for other job seekers - Suresh pal tikamgarh XXXXX

Gammon Engineers And Contractors Interview FAQs

How many rounds are there in Gammon Engineers And Contractors Executive Quality Control interview?
Gammon Engineers And Contractors interview process usually has 1 rounds. The most common rounds in the Gammon Engineers And Contractors interview process are Technical.

Tell us how to improve this page.

Gammon Engineers And Contractors Executive Quality Control Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Assistant Manager
89 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
40 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
21 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Plant Engineer
18 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Gammon Engineers And Contractors with

Hindustan Construction Company

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Simplex Infrastructures

3.3
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview