Upload Button Icon Add office photos

Filter interviews by

Clear (1)

KEPCO Plant Service & Engineering Assistant Manager Interview Questions and Answers

Updated 12 Aug 2021

KEPCO Plant Service & Engineering Assistant Manager Interview Experiences

2 interviews found

I applied via Naukri.com and was interviewed in Feb 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. All major BTG protection (Boiler/Turbine/Generator/Switchyard)
  • Ans. 

    BTG protection refers to the safety measures taken for Boiler, Turbine, Generator, and Switchyard.

    • BTG protection is crucial for ensuring the safe and efficient operation of power plants.

    • It involves various safety measures such as fire protection, overpressure protection, and electrical protection.

    • Examples of BTG protection systems include fire suppression systems, pressure relief valves, and protective relays.

    • Regular m...

  • Answered by AI
  • Q2. Mill starting SOP H2/CO2/AIR purging process Emergency Handled

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared anything can be asked, technically sound person can crack easily, if you have genuinely work during your tenure

I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Regarding Generator protection

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your core ready . like all the protection & Tripping of your system and troubleshooting also

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Jio
Q3. What are the different layers of OSI model?
asked in Axis Bank
Q4. How many joint holders we can process in an account in once ?
asked in Adani Group
Q5. What IS Codes do you follow for structural steel fabrication and ... read more

Interview questions from similar companies

I appeared for an interview before Oct 2016.

Interview Questionnaire 

2 Questions

  • Q1.  turbine erection alignment and comissioning procedure
  • Ans. 

    Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.

    • Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.

    • Commissioning procedure includes testing and verifying the functionality of the turbine.

    • Alignment is typically done using laser alignment tools to ensure precise po...

  • Answered by AI
  • Q2. Turbine erection sequence
  • Ans. 

    The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.

    • The foundation is prepared and the anchor bolts are installed.

    • The base frame is positioned and aligned with the anchor bolts.

    • The turbine tower sections are lifted and assembled on top of the base frame.

    • The nacelle, which houses the turbine's generator and other components, is installed on top of t...

  • Answered by AI

Interview Preparation Tips

Round: HR Interview
Experience: they are satisfy with my answers
Tips: explain exactly what you know

Round: Technical Interview
Experience: i explain what i know exactly

Skills: Thermal Power Plant Engineering

I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - For apptitude my approach was not to attempt all questions but ensure that whatever i am able to answer those are correct...hence i took my sweet time to answer each question.

Skills evaluated in this interview

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Question were related to my core profile which is production planning and control . SAP , excel was add on

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about your self and your answer . Be presentable .

I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Kirloskar management looks for learning attitude profile people so that they can groom them to their requirements.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Contribute & help others!
anonymous
You can choose to be anonymous

KEPCO Plant Service & Engineering Interview FAQs

How to prepare for KEPCO Plant Service & Engineering Assistant Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KEPCO Plant Service & Engineering. The most common topics and skills that interviewers at KEPCO Plant Service & Engineering expect are EHS, Industrial Safety, SAP, thermal power plant and Fire Safety.
What are the top questions asked in KEPCO Plant Service & Engineering Assistant Manager interview?

Some of the top questions asked at the KEPCO Plant Service & Engineering Assistant Manager interview -

  1. All major BTG protection (Boiler/Turbine/Generator/Switchya...read more
  2. Mill starting SOP H2/CO2/AIR purging process Emergency Hand...read more
  3. Regarding Generator protect...read more

Recently Viewed

INTERVIEWS

Millennium Management

No Interviews

INTERVIEWS

AQR Capital Management

No Interviews

INTERVIEWS

Millennium Management

No Interviews

INTERVIEWS

Builders FirstSource

No Interviews

INTERVIEWS

Builders FirstSource

No Interviews

JOBS

Lowe's

No Jobs

INTERVIEWS

Millennium Management

No Interviews

INTERVIEWS

AQR Capital Management

No Interviews

INTERVIEWS

Turner Construction

No Interviews

INTERVIEWS

Millennium Management

No Interviews

Tell us how to improve this page.

KEPCO Plant Service & Engineering Assistant Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
KEPCO Plant Service & Engineering Assistant Manager Salary
based on 72 salaries
₹6 L/yr - ₹11.5 L/yr
5% more than the average Assistant Manager Salary in India
View more details

KEPCO Plant Service & Engineering Assistant Manager Reviews and Ratings

based on 16 reviews

3.9/5

Rating in categories

3.2

Skill development

3.1

Work-life balance

3.9

Salary

3.0

Job security

2.9

Company culture

2.8

Promotions

3.1

Work satisfaction

Explore 16 Reviews and Ratings
Assistant Engineer
93 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Senior Engineer
90 salaries
unlock blur

₹4.5 L/yr - ₹9.6 L/yr

Assistant Manager
72 salaries
unlock blur

₹6 L/yr - ₹11.5 L/yr

Engineer
72 salaries
unlock blur

₹2.7 L/yr - ₹7.5 L/yr

Deputy Manager
35 salaries
unlock blur

₹8.5 L/yr - ₹15 L/yr

Explore more salaries
Compare KEPCO Plant Service & Engineering with

L&T Energy Hydrocarbon

3.8
Compare

Tata Projects

4.2
Compare

TechnipFMC

4.0
Compare

Toyo Engineering

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview