A Project Quantity Surveyor was asked 5d ago
Q. How do you determine rock quantities from cross-section drawings?
Ans. 

Extracting rock quantities from cross-section drawings involves measuring areas and applying volume calculations.

  • Identify the cross-section drawing and locate the rock layers.

  • Measure the area of the rock layer using appropriate scale.

  • Calculate the volume by multiplying the area by the length of the section.

  • Use software tools like AutoCAD for accurate measurements.

  • Example: If the area of a rock layer is 50 m² and t...

View all Project Quantity Surveyor interview questions
A job Trainee was asked 6mo ago
Q. What is your troubleshooting process?
Ans. 

My troubleshooting process involves identifying the issue, researching possible solutions, testing different approaches, and seeking help if needed.

  • Identify the problem by gathering information and observing the issue

  • Research possible solutions by using resources like manuals, online forums, and asking colleagues

  • Test different approaches to see which one resolves the issue

  • Seek help from experts or supervisors if u...

View all job Trainee interview questions
A Mechanic Diesel was asked 9mo ago
Q. What problems can cause an air dryer malfunction?
Ans. 

The problem for air dryer complaints can be caused by issues such as clogged filters, leaks, or malfunctioning components.

  • Clogged filters can restrict airflow and cause the air dryer to not function properly.

  • Leaks in the air system can lead to a decrease in air pressure and affect the performance of the air dryer.

  • Malfunctioning components such as valves or sensors can also result in air dryer complaints.

View all Mechanic Diesel interview questions
A Mechanic Diesel was asked 9mo ago
Q. What could cause the brakes to jam?
Ans. 

Brake jamming can be caused by issues such as worn brake pads, rusted brake calipers, or a malfunctioning brake system.

  • Worn brake pads can cause the brakes to stick and not release properly.

  • Rusted brake calipers can prevent the brakes from fully disengaging after being applied.

  • A malfunctioning brake system, such as a faulty master cylinder or brake booster, can also lead to brake jamming.

  • Regular maintenance and in...

View all Mechanic Diesel interview questions
A Mechanic Diesel was asked 9mo ago
Q. What problems can cause overheating?
Ans. 

Possible causes of overheating in a diesel engine

  • Low coolant levels

  • Faulty thermostat

  • Clogged radiator

  • Malfunctioning water pump

  • Leaking head gasket

  • Blocked exhaust system

  • Incorrect fuel mixture

View all Mechanic Diesel interview questions
A Civil Quantity Surveyor and Site Engineer was asked 10mo ago
Q. What is the main role of the Quantity Surveyor in Pre-Contract and Post-Contract Stages?
Ans. 

Quantity Surveyors play a crucial role in both pre-contract and post-contract stages by managing costs and ensuring projects stay within budget.

  • Pre-Contract Stage: preparing cost estimates, bills of quantities, tender documents, and negotiating with contractors.

  • Post-Contract Stage: managing costs, valuing work done, handling variations, and settling final accounts.

  • Quantity Surveyors also provide advice on contract...

View all Civil Quantity Surveyor and Site Engineer interview questions
A Civil Quantity Surveyor and Site Engineer was asked 10mo ago
Q. What is Value Engineering?
Ans. 

Value Engineering is a systematic and organized approach to providing necessary functions in a project at the lowest cost.

  • Value Engineering involves analyzing the functions of a project to determine the best way to achieve them at the lowest cost.

  • It focuses on improving the value of a project by optimizing its functions, quality, and cost.

  • Value Engineering often involves brainstorming sessions with a team of exper...

View all Civil Quantity Surveyor and Site Engineer interview questions
Are these interview questions helpful?
A Civil Quantity Surveyor and Site Engineer was asked 10mo ago
Q. What are the Standard Methods of measurement Used in the construction Industry?
Ans. 

Standard Methods of Measurement (SMM) are guidelines used in the construction industry to measure and quantify building works.

  • SMM7 (Standard Method of Measurement of Building Works 7th Edition) - widely used in the UK for measuring building works

  • CESMM (Civil Engineering Standard Method of Measurement) - used for civil engineering works

  • NRM (New Rules of Measurement) - developed by the Royal Institute of Chartered S...

View all Civil Quantity Surveyor and Site Engineer interview questions
A Civil Quantity Surveyor and Site Engineer was asked 10mo ago
Q. What is the NRM? What are the uses of NRM1, NRM2, and NRM3?
Ans. 

NRM stands for New Rules of Measurement. NRM1 covers the preparation of bills of quantities, NRM2 covers the measurement rules for capital building works, and NRM3 covers the measurement rules for building maintenance works.

  • NRM1 is used for the preparation of bills of quantities in construction projects.

  • NRM2 provides measurement rules for capital building works, ensuring consistency and accuracy in quantifying con...

View all Civil Quantity Surveyor and Site Engineer interview questions
A Civil Quantity Surveyor and Site Engineer was asked 10mo ago
Q. What types of software are used for quantity take-off and estimation in construction?
Ans. 

Software such as Bluebeam, Planswift, and CostX are commonly used for quantity stack-off and estimation in construction.

  • Bluebeam

  • Planswift

  • CostX

View all Civil Quantity Surveyor and Site Engineer interview questions

Archirodon Interview Experiences

17 interviews found

job Trainee Interview Questions & Answers

user image Anonymous

posted on 8 Jan 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Dec 2024. There were 7 interview rounds.

Round 1 - Aptitude Test 

Aptitude test explore a person's inclination tendancy or capacity to succeed in a specific situation they are usually made-up of a series of multiple choice question

Round 2 - Group Discussion 

Group discussion helps employer identify particular personality traits like leadership confidence impersonal and teamwork skills of potential employee

Round 3 - Case Study 

Case study interview isn't you average interview while most interview ask you to give example of how you use your skills on the job in a case study interview

Round 4 - Coding Test 

Coding interviews usually conpari se question on software and system desiodesiofor this candidates require analytical and logical thinking to solve problem and scenarios for the One side of virtual interview

Round 5 - Assignment 

A job interview is a task or project related to the position you're applying for .Many hiring Managers use these assignments in addition to traditional interview to learn more about you skills and ethics and evaluate how your abilities algin with the job requirements

Round 6 - HR 

(3 Questions)

  • Q1. The HR interview includes question such as gernal information about you previous job roles core skillsskills qualifications and salary expectations
  • Q2. What's you terubbleshotting process
  • Ans. 

    My troubleshooting process involves identifying the issue, researching possible solutions, testing different approaches, and seeking help if needed.

    • Identify the problem by gathering information and observing the issue

    • Research possible solutions by using resources like manuals, online forums, and asking colleagues

    • Test different approaches to see which one resolves the issue

    • Seek help from experts or supervisors if unable...

  • Answered by AI
  • Q3. Do you have any technical certification that Make you qualified for this job
Round 7 - Technical 

(2 Questions)

  • Q1. What technologies are you most proficient and how have you applied them in pas role ?
  • Q2. Can you explain a complex technical project that you managed and outcome ?

Interview Preparation Tips

Topics to prepare for Archirodon job Trainee interview:
  • Effective Communication
Interview preparation tips for other job seekers - Know what the job entile before you apply understand what skills and experience are required and how to develop thembe protective don't wait for apportunities to come to you go out and make them happen
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What are the Standard Methods of measurement Used in the construction Industry?
  • Ans. 

    Standard Methods of Measurement (SMM) are guidelines used in the construction industry to measure and quantify building works.

    • SMM7 (Standard Method of Measurement of Building Works 7th Edition) - widely used in the UK for measuring building works

    • CESMM (Civil Engineering Standard Method of Measurement) - used for civil engineering works

    • NRM (New Rules of Measurement) - developed by the Royal Institute of Chartered Survey...

  • Answered by AI
  • Q2. What types of software are used for quantity stack-off and estimation in construction?
  • Ans. 

    Software such as Bluebeam, Planswift, and CostX are commonly used for quantity stack-off and estimation in construction.

    • Bluebeam

    • Planswift

    • CostX

  • Answered by AI
  • Q3. What is the NRM? Use of NRM1, 2 and 3
  • Ans. 

    NRM stands for New Rules of Measurement. NRM1 covers the preparation of bills of quantities, NRM2 covers the measurement rules for capital building works, and NRM3 covers the measurement rules for building maintenance works.

    • NRM1 is used for the preparation of bills of quantities in construction projects.

    • NRM2 provides measurement rules for capital building works, ensuring consistency and accuracy in quantifying construc...

  • Answered by AI
  • Q4. What is the Value Engineering?
  • Ans. 

    Value Engineering is a systematic and organized approach to providing necessary functions in a project at the lowest cost.

    • Value Engineering involves analyzing the functions of a project to determine the best way to achieve them at the lowest cost.

    • It focuses on improving the value of a project by optimizing its functions, quality, and cost.

    • Value Engineering often involves brainstorming sessions with a team of experts to...

  • Answered by AI
  • Q5. What is the main Role of the Quantity Surveyor in Pre-Contact and Post-Contract Stages?
  • Ans. 

    Quantity Surveyors play a crucial role in both pre-contract and post-contract stages by managing costs and ensuring projects stay within budget.

    • Pre-Contract Stage: preparing cost estimates, bills of quantities, tender documents, and negotiating with contractors.

    • Post-Contract Stage: managing costs, valuing work done, handling variations, and settling final accounts.

    • Quantity Surveyors also provide advice on contractual m...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is the Salary Expectation based on your Qualifications and Experience?
  • Ans. 

    Salary expectation is based on qualifications, experience, industry standards, and location.

    • Consider industry standards for Civil Quantity Surveyors and Site Engineers

    • Take into account your level of experience and qualifications

    • Factor in the location of the job as cost of living varies

    • Research average salaries for similar positions in your area

    • Be prepared to negotiate based on benefits and perks offered

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What are the Arc welder
  • Ans. 

    Arc welders are devices used to join metal pieces together by creating an electric arc between the welding electrode and the workpiece.

    • Arc welders use electricity to generate heat, which melts the metal pieces being joined together.

    • The electric arc is created by passing a current through the welding electrode, which then melts and deposits metal onto the workpiece.

    • Arc welding is commonly used in construction, fabricati...

  • Answered by AI
  • Q2. What are the welding
  • Ans. 

    Welding defects are imperfections in the weld that can compromise its strength and integrity.

    • Common welding defects include porosity, lack of fusion, undercut, and cracks.

    • These defects can be caused by improper welding techniques, poor quality materials, or environmental factors.

    • Examples of welding defects include blowholes in the weld, incomplete penetration, and slag inclusions.

    • Inspecting welds regularly and followin...

  • Answered by AI
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

Importance of marketing

Round 2 - Aptitude Test 

Various aspects in accounting

Round 3 - Group Discussion 

Importance of work life

Round 4 - HR 

(2 Questions)

  • Q1. Introduce yourself
  • Q2. Why we should hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - Good and very good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Base plate size, thickness ,tube size, thickness o.d.,id. Weight/meter Ans 150 m.m, thickness 6m.m., tube size max. 6 merer, thickness 4.0 m.m., o.d 48.3 m.m. ,i.d. 40.3 m.m. , weight/ meter 4.4 k.g
  • Q2. Type of scaffold Ans. (1) mobile tower (2) indipendent tower (3) suspended tower (4) candilever (5) racker tower (6) basket (7) febricate and frame scaffold
  • Ans. 

    There are various types of scaffolds such as mobile tower, independent tower, suspended tower, cantilever, racker tower, basket, and fabricated and frame scaffold.

    • Mobile tower scaffold is a type of scaffold that can be easily moved from one place to another.

    • Independent tower scaffold is a free-standing scaffold that does not require support from the building or structure.

    • Suspended tower scaffold is a type of scaffold t...

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Gin wheel capacity Ans. 25 k.g.
  • Ans. 

    The gin wheel capacity is 25 kg.

    • The gin wheel is a pulley system used to lift and lower materials on a scaffold.

    • The capacity of the gin wheel refers to the maximum weight it can safely lift.

    • It is important to ensure that the weight of the load being lifted does not exceed the capacity of the gin wheel.

    • Exceeding the capacity can result in accidents and injuries.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good archirodon very nice company
And good management
Everything is very good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. I know DB dressing. Cable glanding paper working and i will do better then others
Round 3 - One-on-one 

(1 Question)

  • Q1. You can speak me any Question in house working.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jul 2024, where I was asked the following questions.

  • Q1. What about the Experience in same field?
  • Ans. 

    I have extensive experience in quantity surveying, managing costs and contracts for various construction projects.

    • Over 5 years of experience in quantity surveying for residential and commercial projects.

    • Successfully managed a $10 million commercial building project, ensuring budget adherence.

    • Conducted cost estimation and analysis for multiple projects, leading to a 15% reduction in overall costs.

    • Collaborated with archi...

  • Answered by AI
  • Q2. Do you have a Experience in marine work Quantity Surveying?
  • Ans. 

    Yes, I have experience in marine work Quantity Surveying, managing costs and contracts for various marine projects.

    • Worked on a coastal protection project, estimating costs for materials and labor.

    • Managed budget for a marina development, ensuring compliance with marine regulations.

    • Conducted risk assessments for underwater construction projects, analyzing potential cost impacts.

    • Collaborated with engineers and environment...

  • Answered by AI
  • Q3. How long You work with Cesmm -03 with Fidic Red Book?
  • Ans. 

    I have extensive experience working with CESMM-3 and FIDIC Red Book in various construction projects.

    • Over 5 years of experience using CESMM-3 for measurement and billing.

    • Familiar with FIDIC Red Book clauses for contract management.

    • Worked on projects where CESMM-3 was integrated with FIDIC for accurate cost estimation.

    • Example: Managed a civil engineering project where CESMM-3 helped streamline the measurement process.

  • Answered by AI
  • Q4. How you geting the Rock Quantities from the Cross Section Drawing
  • Ans. 

    Extracting rock quantities from cross-section drawings involves measuring areas and applying volume calculations.

    • Identify the cross-section drawing and locate the rock layers.

    • Measure the area of the rock layer using appropriate scale.

    • Calculate the volume by multiplying the area by the length of the section.

    • Use software tools like AutoCAD for accurate measurements.

    • Example: If the area of a rock layer is 50 m² and the le...

  • Answered by AI
  • Q5. What is the Breakwater
  • Ans. 

    A breakwater is a structure built to protect coastlines from wave action and erosion.

    • Breakwaters are typically constructed from rock, concrete, or other durable materials.

    • They can be either fixed or floating structures, depending on the design and location.

    • Examples include the Stone Harbor Breakwater in New Jersey and the San Francisco Breakwater.

    • Breakwaters help create calm water areas for harbors and marinas, facilit...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - "Continuously develop your skills to the highest level in your field, making yourself truly exceptional and impossible to replace.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What's problem for over heating
  • Ans. 

    Possible causes of overheating in a diesel engine

    • Low coolant levels

    • Faulty thermostat

    • Clogged radiator

    • Malfunctioning water pump

    • Leaking head gasket

    • Blocked exhaust system

    • Incorrect fuel mixture

  • Answered by AI
  • Q2. What's problem for air driyer complaint
  • Ans. 

    The problem for air dryer complaints can be caused by issues such as clogged filters, leaks, or malfunctioning components.

    • Clogged filters can restrict airflow and cause the air dryer to not function properly.

    • Leaks in the air system can lead to a decrease in air pressure and affect the performance of the air dryer.

    • Malfunctioning components such as valves or sensors can also result in air dryer complaints.

  • Answered by AI
  • Q3. What's problem breake jaming
  • Ans. 

    Brake jamming can be caused by issues such as worn brake pads, rusted brake calipers, or a malfunctioning brake system.

    • Worn brake pads can cause the brakes to stick and not release properly.

    • Rusted brake calipers can prevent the brakes from fully disengaging after being applied.

    • A malfunctioning brake system, such as a faulty master cylinder or brake booster, can also lead to brake jamming.

    • Regular maintenance and inspect...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Archirodon Mechanic Diesel interview:
  • Mechanical Maintenance
Interview preparation tips for other job seekers - Hard work
Round 1 - One-on-one 

(1 Question)

  • Q1. Technical department
Round 2 - Technical 

(1 Question)

  • Q1. I Mohammed tajuddin have Diploma Civil engineer with Second Class in May 1997 and having experience in Roads Building Roads Building and oil and gas and petroleum companies in construction in construction ...

Interview Preparation Tips

Interview preparation tips for other job seekers - Need job offer as soon as possible and I will signed up for the agreement
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. What do you know about Document Controller?
  • Ans. 

    A Document Controller is responsible for managing and organizing company documents.

    • Document Controllers ensure that all documents are properly stored and easily accessible

    • They maintain document control systems and ensure that all documents are up-to-date

    • They may also be responsible for distributing documents to relevant parties

    • Document Controllers must have strong organizational and communication skills

  • Answered by AI
  • Q2. Explain about responsibilities of Document controller for EPC contractor?
  • Ans. 

    The Document Controller for an EPC contractor is responsible for managing and controlling all project documents.

    • Developing and implementing document control procedures

    • Maintaining and updating project documentation

    • Ensuring all documents are properly stored and easily accessible

    • Managing document distribution and tracking revisions

    • Coordinating with project teams to ensure timely submission of documents

    • Preparing reports on...

  • Answered by AI
  • Q3. Procedure of Documentation and transition procedure?
  • Ans. 

    Documentation procedure involves creating, managing, and storing documents. Transition procedure involves transferring documents from one stage to another.

    • Documentation procedure includes creating templates, version control, and approval process.

    • Documents should be stored in a secure and organized manner.

    • Transition procedure involves reviewing and approving documents before moving to the next stage.

    • Documents should be ...

  • Answered by AI
  • Q4. What do you know about EDMS?
  • Ans. 

    EDMS stands for Electronic Document Management System. It is a software solution used to store, manage, and track electronic documents.

    • EDMS is an acronym for Electronic Document Management System

    • It is a software solution used to store, manage, and track electronic documents

    • EDMS provides features like document version control, access control, and document search functionality

    • It helps in organizing and categorizing docum...

  • Answered by AI
  • Q5. Do you know templates for different documentation?
  • Ans. 

    Yes, templates are essential for consistent documentation. They save time and ensure accuracy.

    • Templates provide a standardized format for documentation

    • They save time by eliminating the need to create a new document from scratch

    • Templates ensure accuracy by including all necessary information and formatting

    • Examples of templates include meeting minutes, project plans, and standard operating procedures

  • Answered by AI
  • Q6. Receive monitoring tracking and maintain database is your responsibilities?
  • Ans. 

    Yes, receiving monitoring tracking and maintaining database are my responsibilities as a Document Controller.

    • I receive monitoring tracking reports from various departments and ensure they are properly documented.

    • I maintain a database of all the documents and ensure they are up-to-date.

    • I ensure that all documents are properly labeled and stored for easy retrieval.

    • I work closely with other departments to ensure that all ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Some of basic things for document controller as best typing good excel and office management.

Skills evaluated in this interview

Top trending discussions

View All
Interview Tips & Stories
1w (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Archirodon?
Ask anonymously on communities.

Archirodon Interview FAQs

How many rounds are there in Archirodon interview?
Archirodon interview process usually has 2-3 rounds. The most common rounds in the Archirodon interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in Archirodon interview?

Some of the top questions asked at the Archirodon interview -

  1. Type of scaffold Ans. (1) mobile tower (2) indipendent tower (3) suspended tow...read more
  2. Do you know templates for different documentati...read more
  3. What types of software are used for quantity stack-off and estimation in constr...read more
How long is the Archirodon interview process?

The duration of Archirodon interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.6/5

based on 14 interview experiences

Difficulty level

Easy 43%
Moderate 29%
Hard 29%

Duration

Less than 2 weeks 83%
More than 8 weeks 17%
View more

Archirodon Reviews and Ratings

based on 229 reviews

3.9/5

Rating in categories

4.0

Skill development

3.7

Work-life balance

3.7

Salary

3.8

Job security

3.9

Company culture

3.2

Promotions

3.8

Work satisfaction

Explore 229 Reviews and Ratings
HSE Officer
10 salaries
unlock blur

₹9.2 L/yr - ₹15.5 L/yr

Mechanical Engineer
10 salaries
unlock blur

₹10 L/yr - ₹15.5 L/yr

Civil Site Engineer
6 salaries
unlock blur

₹6 L/yr - ₹13.4 L/yr

Workshop Manager
5 salaries
unlock blur

₹4.8 L/yr - ₹12 L/yr

Electrical Technician
5 salaries
unlock blur

₹4.5 L/yr - ₹7.2 L/yr

Explore more salaries
Compare Archirodon with

Nasser S. Al Hajri Corporation

3.5
Compare

Saudi Binladin Group

4.1
Compare

Leighton Contractors

4.2
Compare

Amara Raja Infra

4.0
Compare
write
Share an Interview