I applied via Job Fair and was interviewed before Jan 2022. There were 7 interview rounds.
Hard work and pipeline roadlines work...
All machine.(bom loader.jcb.oather) old pipe line area.. new pipe line coverage
Hard work and pipeline roadlines work..
Hard work and pipeline roadlines work..
Hard work and pipeline roadlines
Top trending discussions
posted on 31 Dec 2023
The procedure of laying tile and granite involves preparing the surface, applying adhesive, laying the tiles/granite, grouting, and sealing.
Prepare the surface by ensuring it is clean, level, and dry.
Apply adhesive to the surface using a trowel, ensuring even coverage.
Lay the tiles/granite starting from the center and working outwards in a pattern.
Grout the tiles/granite by filling the gaps between them with grout and ...
Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.
To prepare for further construction on top of the piles
To ensure proper load transfer to the foundation
To facilitate the installation of pile caps or beams
To adjust the pile length if necessary
There are four deductions of 90 degree angles.
A 90 degree angle is formed when two lines intersect at a right angle.
In a square, all four angles are 90 degrees.
In a rectangle, opposite angles are 90 degrees.
In a right triangle, one angle is always 90 degrees.
Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.
Static load test involves applying a constant load to a structure and measuring its response over time.
Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.
Static load test helps determine the maxi...
The number of tolerance of pile load test depends on the specific project requirements and standards.
The number of tolerance of pile load test can vary based on the project specifications and standards.
Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.
Some projects may have more stringent tolerance requirements depending on the criticality of the structure.
It is important to refer...
Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.
Range density of bentonite is typically between 17-22 lb/gal.
Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.
The range density of bentonite is important for determining its effectiveness in different applications.
Higher range density ...
posted on 9 Jul 2024
Isometric drawing is a 3D drawing technique used in piping to show a clear representation of piping layout.
Isometric drawing is a type of 3D drawing that represents a 3D object in two dimensions.
It is commonly used in piping to show the layout of pipes, fittings, and other components in a clear and detailed manner.
Isometric drawings help in visualizing how components fit together and the overall layout of a piping syst...
Isometric drawings are 3D drawings that show a three-dimensional object in a two-dimensional format.
Isometric drawings use three axes (x, y, z) to represent the object in 3D space.
All three axes are equally angled from each other, typically at 120 degrees.
Isometric drawings are commonly used in engineering and construction to visualize objects and structures.
Examples of isometric drawings include piping layouts, archit
posted on 24 Feb 2024
Yes, I have experience in HVAC systems as a Mechanical Foreman.
I have experience in installing, maintaining, and repairing HVAC systems.
I am familiar with troubleshooting HVAC issues and ensuring proper functioning of equipment.
I have worked with various HVAC components such as compressors, condensers, and evaporators.
I have knowledge of HVAC controls and systems design.
I have experience in overseeing HVAC projects and...
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.
Excavation process in the oil and gas industry involves several steps to ensure safe and efficient operations.
The first step in the excavation process is to conduct a thorough site survey to identify potential hazards and determine the best approach for excavation.
Before excavation begins, proper permits and approvals must be obtained from relevant authorities.
Excavation equipment such as excavators, bulldozers, and ba...
posted on 31 Dec 2023
The procedure of laying tile and granite involves preparing the surface, applying adhesive, laying the tiles/granite, grouting, and sealing.
Prepare the surface by ensuring it is clean, level, and dry.
Apply adhesive to the surface using a trowel, ensuring even coverage.
Lay the tiles/granite starting from the center and working outwards in a pattern.
Grout the tiles/granite by filling the gaps between them with grout and ...
posted on 6 Nov 2019
I applied via Recruitment Consultant and was interviewed in May 2019. There were 5 interview rounds.
posted on 12 Oct 2020
I applied via Recruitment Consultant and was interviewed before Oct 2019. There was 1 interview round.
based on 3 reviews
Rating in categories
Mechanical Engineer
10
salaries
| ₹10 L/yr - ₹20 L/yr |
HSE Officer
9
salaries
| ₹8.3 L/yr - ₹15.5 L/yr |
Land Surveyor
7
salaries
| ₹5.4 L/yr - ₹12.5 L/yr |
QC Welding Inspector
5
salaries
| ₹9.6 L/yr - ₹30 L/yr |
Electrical Engineer
5
salaries
| ₹12.5 L/yr - ₹20 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Afcons Infrastructure