Upload Button Icon Add office photos

Amara Raja Infra

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Amara Raja Infra Civil Site Engineer Interview Questions, Process, and Tips

Updated 25 Jun 2024

Amara Raja Infra Civil Site Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Why are remove the pile head.
  • Ans. 

    Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.

    • To prepare for further construction on top of the piles

    • To ensure proper load transfer to the foundation

    • To facilitate the installation of pile caps or beams

    • To adjust the pile length if necessary

  • Answered by AI
  • Q2. How many deduction of 90 degree angle.
  • Ans. 

    There are four deductions of 90 degree angles.

    • A 90 degree angle is formed when two lines intersect at a right angle.

    • In a square, all four angles are 90 degrees.

    • In a rectangle, opposite angles are 90 degrees.

    • In a right triangle, one angle is always 90 degrees.

  • Answered by AI
  • Q3. What is static load test and dynamic load test.
  • Ans. 

    Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.

    • Static load test involves applying a constant load to a structure and measuring its response over time.

    • Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.

    • Static load test helps determine the maxi...

  • Answered by AI
  • Q4. How many tolerance of pile load test.
  • Ans. 

    The number of tolerance of pile load test depends on the specific project requirements and standards.

    • The number of tolerance of pile load test can vary based on the project specifications and standards.

    • Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.

    • Some projects may have more stringent tolerance requirements depending on the criticality of the structure.

    • It is important to refer...

  • Answered by AI
  • Q5. What is rang Density of bentonite and why is this use.
  • Ans. 

    Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.

    • Range density of bentonite is typically between 17-22 lb/gal.

    • Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.

    • The range density of bentonite is important for determining its effectiveness in different applications.

    • Higher range density ...

  • Answered by AI

Skills evaluated in this interview

Interview questions from similar companies

I was interviewed before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. What is leveling
  • Ans. 

    Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.

    • Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.

    • It involves the use of leveling instruments such as a level, theodolite, or laser level.

    • The process typically includes setting up benchmarks or reference points, taking readings at different...

  • Answered by AI
  • Q2. What is dia of six mm
  • Ans. 

    The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.

    • The diameter is the distance across the center of a circle, passing through the circumference.

    • A six mm diameter can be visualized as a circle with a width of six millimeters.

    • It is a common measurement used in various industries, including engineering and manufacturing.

    • For example, a six mm diameter steel rod w...

  • Answered by AI
  • Q3. What is formula of lep
  • Ans. 

    LEP stands for Load Equivalent Factor for Pavement design.

    • LEP is used in pavement design to determine the load-carrying capacity of the pavement.

    • The formula for LEP depends on the specific design method being used.

    • For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))

    • Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...

  • Answered by AI
Round 1 - Technical 

(1 Question)

  • Q1. Question about metro projects and pile foundation.
Round 2 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why we will hire you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Ok.You can join there. Currently they have a lot of projects in india.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills

I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What I have done at previous projects
  • Q2. RCC structure, Excavation, concreting

Interview Preparation Tips

Interview preparation tips for other job seekers - Good to attend the interview.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about your self
  • Q2. Tell me about your strength

Interview Preparation Tips

Interview preparation tips for other job seekers - Believe in your self
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about your self?
Round 2 - Technical 

(1 Question)

  • Q1. All types of questions like, bbs, quality, finishing, BOQ, concrete etc.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. Working time in site work
  • Q2. Working time period
  • Q3. Som soil survey steel
  • Q4. Highway engineering
  • Q5. Irrigation Fluid machinces
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about your self
  • Q2. Explain compression test of concrete
  • Ans. 

    Compression test of concrete is a method to determine the compressive strength of concrete.

    • A cylindrical sample of concrete is prepared and placed in a compression testing machine.

    • The machine applies a load at a constant rate until the sample fails.

    • The maximum load that the sample can bear before failure is recorded as the compressive strength of the concrete.

    • The test is important to ensure the quality and durability o...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just grabs more knowledge to keep growing and fix for goal ambition and create a path and just work on it to get success.
Contribute & help others!
anonymous
You can choose to be anonymous

Amara Raja Infra Interview FAQs

How many rounds are there in Amara Raja Infra Civil Site Engineer interview?
Amara Raja Infra interview process usually has 1 rounds. The most common rounds in the Amara Raja Infra interview process are Technical.
What are the top questions asked in Amara Raja Infra Civil Site Engineer interview?

Some of the top questions asked at the Amara Raja Infra Civil Site Engineer interview -

  1. What is rang Density of bentonite and why is this u...read more
  2. What is static load test and dynamic load te...read more
  3. How many deduction of 90 degree ang...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

INTERVIEWS

Hourglass Research

No Interviews

INTERVIEWS

HINDCO CONSULTING SERVICES

No Interviews

INTERVIEWS

Numerous Motors

No Interviews

INTERVIEWS

Redcliffe Labs

No Interviews

INTERVIEWS

Tally Solutions

No Interviews

INTERVIEWS

The Louis Berger Group

No Interviews

INTERVIEWS

Caterpillar Inc

No Interviews

SALARIES

Techno Electric & Engineering Company

Tell us how to improve this page.

Amara Raja Infra Civil Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Amara Raja Infra Civil Site Engineer Salary
based on 9 salaries
₹2.4 L/yr - ₹4.9 L/yr
At par with the average Civil Site Engineer Salary in India
View more details

Amara Raja Infra Civil Site Engineer Reviews and Ratings

based on 5 reviews

3.9/5

Rating in categories

4.3

Skill development

3.6

Work-life balance

4.3

Salary

4.3

Job security

4.1

Company culture

3.3

Promotions

3.4

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Manager
46 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
25 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive Engineer
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Engineer
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
14 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Amara Raja Infra with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview