I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
Top trending discussions
Software or tool test
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Excavation soil mass can be calculated by determining the volume of the soil and its density.
Calculate the volume of the excavation area by multiplying the length, width, and depth of the area.
Determine the density of the soil being excavated.
Multiply the volume of the excavation area by the density of the soil to get the excavation soil mass.
For example, if the excavation area is 10m x 5m x 2m and the soil density is ...
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.
Temporary or permanent blinds can be used depending on the situation
Common types of blinds include spectacle blinds, paddle blinds, and bleed rings
Blinding is often used during maintenance or repair work to ensure safety
Blinding can also be used to prevent contamination during storage or transportation
Blinding can...
Before starting work in a refinery equipment, certain procedures must be followed.
Obtain a work permit
Perform a safety check of the equipment
Ensure proper personal protective equipment is worn
Verify that all valves are in the correct position
Confirm that the equipment is properly grounded
Check for any leaks or abnormal conditions
Communicate with other workers in the area
Follow all established procedures and protocols
I will follow the emergency response plan and evacuate the area immediately.
Activate the alarm system to alert others in the area
Put on personal protective equipment (PPE) including a respirator
Evacuate the area immediately and move to a safe location
Notify emergency services and follow the emergency response plan
Monitor the situation and wait for the all-clear signal before returning to the area
I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.
Start from the top and work your way down
Use appropriate tools and safety equipment
Follow proper procedures and guidelines
Ensure all bolts are properly labeled and accounted for
Inspect the gasket and replace if necessary
posted on 25 Jan 2022
I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.
The company is involved in [insert industry] and adheres to industry standards to ensure success and growth.
The company operates in [insert industry] and offers [insert products/services].
Industry standards are followed to ensure quality and safety in all aspects of the business.
Regular market research is conducted to stay up-to-date with industry trends and changes.
The company strives for continuous improvement and in...
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
Mechanical engineers play a crucial role in building a sky-scraper by designing and implementing the mechanical systems.
Designing and implementing HVAC systems to regulate temperature and air quality
Designing and implementing plumbing systems for water supply and drainage
Designing and implementing elevator and escalator systems for vertical transportation
Designing and implementing fire protection systems to ensure safe...
I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.
Temporary or permanent blinds can be used depending on the situation
Common types of blinds include spectacle blinds, paddle blinds, and bleed rings
Blinding is often used during maintenance or repair work to ensure safety
Blinding can also be used to prevent contamination during storage or transportation
Blinding can...
Before starting work in a refinery equipment, certain procedures must be followed.
Obtain a work permit
Perform a safety check of the equipment
Ensure proper personal protective equipment is worn
Verify that all valves are in the correct position
Confirm that the equipment is properly grounded
Check for any leaks or abnormal conditions
Communicate with other workers in the area
Follow all established procedures and protocols
I will follow the emergency response plan and evacuate the area immediately.
Activate the alarm system to alert others in the area
Put on personal protective equipment (PPE) including a respirator
Evacuate the area immediately and move to a safe location
Notify emergency services and follow the emergency response plan
Monitor the situation and wait for the all-clear signal before returning to the area
I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.
Start from the top and work your way down
Use appropriate tools and safety equipment
Follow proper procedures and guidelines
Ensure all bolts are properly labeled and accounted for
Inspect the gasket and replace if necessary
based on 9 reviews
Rating in categories
Assistant Manager
43
salaries
| ₹7.7 L/yr - ₹14.6 L/yr |
Senior Engineer
24
salaries
| ₹4 L/yr - ₹8.5 L/yr |
Executive Engineer
16
salaries
| ₹3.8 L/yr - ₹6.4 L/yr |
Deputy Engineer
16
salaries
| ₹4 L/yr - ₹6.1 L/yr |
Engineer
14
salaries
| ₹3.5 L/yr - ₹10.2 L/yr |
L&T Construction
Tata Projects
GMR Group
Reliance Infrastructure