Filter interviews by
Top trending discussions
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Through a job posting on LinkedIn
Found job posting on LinkedIn
Researched company after seeing job posting
Connected with current employees on LinkedIn
Received referral from a friend or colleague
I have 8 years of experience working on high rise projects with contractor companies.
I have worked on multiple high rise projects ranging from 20 to 50 stories.
Managed structural design and construction of high rise buildings.
Collaborated with architects, contractors, and clients to ensure project success.
Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.
SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.
TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.
posted on 22 Feb 2022
posted on 21 Feb 2023
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
posted on 23 Jul 2021
The future of QA/QC department is bright with increasing demand for quality products and services.
Adoption of new technologies like AI and automation
Increased focus on data analysis and continuous improvement
Integration of QA/QC into overall business strategy
Growing importance of regulatory compliance
Need for skilled and certified QA/QC professionals
posted on 25 Jan 2025
Role of engineer to control disaster management
posted on 24 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There was 1 interview round.
Yes, I am preparing a method statement for the project.
Yes, I am currently working on preparing a method statement for the project.
I am in the process of outlining the steps and procedures to be followed in the project.
The method statement will include details on quality control measures, testing procedures, and documentation requirements.
Yes, I am able to prepare a PQP (Product Quality Plan).
I have experience in creating detailed PQPs outlining quality control processes and procedures.
I ensure that the PQP meets all relevant industry standards and regulations.
I collaborate with cross-functional teams to gather input and ensure alignment on quality goals.
I regularly review and update the PQP to reflect any changes in processes or requirements.
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 11 reviews
Rating in categories
Assistant Manager
45
salaries
| ₹7.7 L/yr - ₹14.6 L/yr |
Senior Engineer
26
salaries
| ₹3.6 L/yr - ₹9.6 L/yr |
Deputy Engineer
17
salaries
| ₹4 L/yr - ₹6.1 L/yr |
Executive Engineer
16
salaries
| ₹3.6 L/yr - ₹6.4 L/yr |
Engineer
14
salaries
| ₹3.5 L/yr - ₹10.2 L/yr |
Nasser S. Al Hajri Corporation
Saudi Binladin Group
Leighton Contractors
Eversendai