I appeared for an interview in Dec 2016.
QA focuses on preventing defects in the software development process, while QC focuses on identifying defects in the final product.
QA stands for Quality Assurance and QC stands for Quality Control.
QA is a proactive process that focuses on preventing defects by establishing processes and standards, while QC is a reactive process that focuses on identifying defects in the final product.
QA involves activities like require...
To judge the product physically, perform visual inspections, measurements, and functional tests.
Conduct visual inspections to check for any defects or abnormalities in the product's appearance.
Perform measurements to ensure the product meets the required specifications and tolerances.
Conduct functional tests to verify that the product performs its intended functions correctly.
Compare the physical attributes of the prod...
Concrete mix design is a process of determining the proportions of various ingredients to achieve desired properties of concrete.
Concrete mix design involves selecting suitable materials and determining their proportions.
The mix design considers factors such as strength, workability, durability, and economy.
IS standards, such as IS 10262, provide guidelines for concrete mix design in India.
The design process includes c...
Concrete cubes break more at the middle due to the distribution of stress and the presence of weak points.
The middle of the cube experiences the highest stress during compression testing.
The distribution of stress is not uniform throughout the cube.
The presence of weak points, such as air voids or aggregate discontinuities, can cause the cube to break at the middle.
The middle of the cube is where the maximum compressiv...
Top trending discussions
posted on 22 Feb 2022
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Through a job posting on LinkedIn
Found job posting on LinkedIn
Researched company after seeing job posting
Connected with current employees on LinkedIn
Received referral from a friend or colleague
I have 8 years of experience working on high rise projects with contractor companies.
I have worked on multiple high rise projects ranging from 20 to 50 stories.
Managed structural design and construction of high rise buildings.
Collaborated with architects, contractors, and clients to ensure project success.
Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.
SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.
TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.
posted on 3 May 2023
posted on 13 Jun 2024
I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.
SFD stands for Shear Force Diagram and BMD stands for Bending Moment Diagram in structural analysis.
SFD shows the variation of shear force along the length of a beam or structure.
BMD shows the variation of bending moment along the length of a beam or structure.
Both diagrams are essential for analyzing the internal forces in a structure.
They are commonly used in civil and mechanical engineering for designing and analyzi...
Thrust forces for beams can be calculated using equations of equilibrium and considering external loads.
Calculate the sum of all external forces acting on the beam.
Determine the direction of the forces (compression or tension) based on the beam's support conditions.
Apply equations of equilibrium to calculate the thrust forces at different points along the beam.
Consider any distributed loads or moments that may affect t...
Software or tool test
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.
Temporary or permanent blinds can be used depending on the situation
Common types of blinds include spectacle blinds, paddle blinds, and bleed rings
Blinding is often used during maintenance or repair work to ensure safety
Blinding can also be used to prevent contamination during storage or transportation
Blinding can...
Before starting work in a refinery equipment, certain procedures must be followed.
Obtain a work permit
Perform a safety check of the equipment
Ensure proper personal protective equipment is worn
Verify that all valves are in the correct position
Confirm that the equipment is properly grounded
Check for any leaks or abnormal conditions
Communicate with other workers in the area
Follow all established procedures and protocols
I will follow the emergency response plan and evacuate the area immediately.
Activate the alarm system to alert others in the area
Put on personal protective equipment (PPE) including a respirator
Evacuate the area immediately and move to a safe location
Notify emergency services and follow the emergency response plan
Monitor the situation and wait for the all-clear signal before returning to the area
I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.
Start from the top and work your way down
Use appropriate tools and safety equipment
Follow proper procedures and guidelines
Ensure all bolts are properly labeled and accounted for
Inspect the gasket and replace if necessary
posted on 24 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There was 1 interview round.
Yes, I am preparing a method statement for the project.
Yes, I am currently working on preparing a method statement for the project.
I am in the process of outlining the steps and procedures to be followed in the project.
The method statement will include details on quality control measures, testing procedures, and documentation requirements.
Yes, I am able to prepare a PQP (Product Quality Plan).
I have experience in creating detailed PQPs outlining quality control processes and procedures.
I ensure that the PQP meets all relevant industry standards and regulations.
I collaborate with cross-functional teams to gather input and ensure alignment on quality goals.
I regularly review and update the PQP to reflect any changes in processes or requirements.
posted on 10 Jul 2024
I applied via LinkedIn and was interviewed before Jul 2023. There was 1 interview round.
Some of the top questions asked at the Amara Raja Infra Senior Quality Control Engineer interview -
Assistant Manager
45
salaries
| ₹7.7 L/yr - ₹14.6 L/yr |
Senior Engineer
27
salaries
| ₹3.6 L/yr - ₹9.6 L/yr |
Executive Engineer
17
salaries
| ₹3.6 L/yr - ₹6.4 L/yr |
Deputy Engineer
17
salaries
| ₹4 L/yr - ₹6.1 L/yr |
Safety Officer
15
salaries
| ₹3 L/yr - ₹5 L/yr |
Nasser S. Al Hajri Corporation
Saudi Binladin Group
Leighton Contractors
Eversendai