I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.
RCC road construction involves using reinforced concrete for durability and strength.
RCC stands for Reinforced Cement Concrete
Specifications include using high-quality cement, aggregates, and steel reinforcement
Proper compaction and curing are essential for durability
Thickness of the RCC road depends on traffic load and subgrade conditions
Joint spacing should be as per design specifications
Building construction activities include excavation, foundation work, framing, roofing, electrical work, plumbing, and finishing.
Excavation: Digging the foundation and preparing the site
Foundation work: Pouring concrete and setting the foundation
Framing: Building the structure's skeleton with wood or steel beams
Roofing: Installing the roof materials
Electrical work: Wiring the building for electricity
Plumbing: Installin...
I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.
The size of covering block is determined based on the type of structure and its requirements.
The size of covering block is usually specified in the design drawings or specifications.
It is important to consider the dimensions and spacing of reinforcement bars when determining the size of covering block.
The covering block should provide adequate protection to the reinforcement bars from fire, corrosion, and other environ...
The length of development refers to the duration it takes to complete a project or task.
The length of development can vary depending on the complexity of the project.
Factors such as team size, resources, and scope can also impact the length of development.
It is important to set realistic timelines and milestones to ensure efficient development.
For example, a simple website development project may take a few weeks, whil...
Construction materials are substances used for building and construction purposes.
Construction materials include cement, concrete, bricks, steel, wood, and glass.
Cement is a binding agent used in the production of concrete.
Concrete is a mixture of cement, sand, gravel, and water, used for construction.
Bricks are rectangular blocks made of clay or concrete, used for building walls.
Steel is a strong and durable material ...
Nagarjuna Construction Company interview questions for designations
I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.
Piling is a construction technique used to strengthen the foundation of a building by driving piles into the ground.
Piling involves driving long, slender columns (piles) into the ground to provide support for structures.
The process starts with site investigation to determine soil conditions and load-bearing capacity.
Piles can be made of concrete, steel, or timber, depending on the project requirements.
Piles are driven ...
BBS preparation involves calculating quantities of steel reinforcement required for construction projects.
Start by studying the structural drawings and specifications provided
Identify the different structural elements like beams, columns, slabs, etc.
Calculate the total length of each type of reinforcement required
Use standard formulas and codes to determine the quantity of steel bars needed
Prepare a detailed Bill of Qu...
Get interview-ready with Top Nagarjuna Construction Company Interview Questions
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Transmission line construction involves planning, design, material procurement, site preparation, tower erection, conductor stringing, and testing.
Planning involves route selection, environmental impact assessment, and obtaining necessary permits.
Design includes determining tower locations, conductor size, and insulator type.
Material procurement involves sourcing towers, conductors, insulators, and hardware.
Site prepar...
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
Slump test is a concrete testing method to measure the consistency and workability of fresh concrete.
Slump test is performed by filling a mold with fresh concrete, then removing the mold and measuring how much the concrete slumps or settles.
The result of the slump test indicates the workability of the concrete mix - a higher slump value indicates higher workability.
The slump test is commonly used in construction to ens...
Segregation is the separation of different components of a mixture based on their physical properties.
Segregation occurs when particles of different sizes, shapes, or densities separate from each other.
For example, in a concrete mix, larger aggregates tend to settle at the bottom while smaller particles rise to the top.
Segregation can also occur in granular materials like sand and gravel during handling and transportat...
The process of brick work involves laying bricks in a specific pattern using mortar to create walls or structures.
Prepare the surface by cleaning and dampening it
Lay a bed of mortar on the surface
Place the bricks in the desired pattern, ensuring they are level and aligned
Use a trowel to add more mortar between the bricks to secure them in place
Repeat the process for each layer of bricks until the desired height is reac...
I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.
Only 1 set of cube sample is taken at a casting of concrete of 5 or less than 5 Meter cube to save cost and time.
Taking multiple samples would increase the cost of testing.
The strength of concrete is usually consistent within a small volume.
ASTM C31 allows for only 1 set of samples for small volume concrete.
If the first set of samples fails, additional samples can be taken for verification.
Slump for casting of concrete is measured using a cone. Slump value may decrease as height increases in high rise buildings.
Slump is measured using a cone and the difference between the height of the cone and the height of the concrete after it settles is the slump value.
As height increases in high rise buildings, the pressure on the concrete increases, which may cause the slump value to decrease.
To maintain the desire...
The right bonding agent for recasting of concrete after rain would be a polymer-modified cementitious bonding agent.
The surface should be cleaned and dried before applying the bonding agent.
The bonding agent should be applied in a thin layer using a brush or roller.
The recasting of concrete should be done within the specified time frame mentioned by the bonding agent manufacturer.
Examples of polymer-modified cementitio...
Shear force is the force perpendicular to the beam and bending moment is the torque that causes bending of the beam.
Shear force is calculated by finding the algebraic sum of all the forces acting on one side of the beam.
Bending moment is calculated by finding the algebraic sum of all the moments acting on one side of the beam.
Shear force and bending moment diagrams are used to visualize the distribution of these forces...
CMDI and HDPE are two different types of plastic materials used in various applications.
CMDI stands for Chlorinated Polyethylene Modified Polyethylene and is a thermoplastic elastomer used in wire and cable insulation, automotive parts, and roofing membranes.
HDPE stands for High-Density Polyethylene and is a thermoplastic polymer used in packaging, pipes, and construction materials.
CMDI has better resistance to chemica...
I applied via Company Website and was interviewed before Nov 2021. There were 3 interview rounds.
An written test conducted. Technical questions asked
Minimum cement required for M30 grade of concrete is 320 kg.
M30 grade of concrete requires a minimum cement content of 320 kg/m3
The cement content may vary based on factors such as water-cement ratio, aggregate type, and quality of cement used
Top trending discussions
Some of the top questions asked at the Nagarjuna Construction Company Assistant Engineer interview -
The duration of Nagarjuna Construction Company Assistant Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 21 interviews
1 Interview rounds
based on 236 reviews
Rating in categories
Junior Engineer
899
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
627
salaries
| ₹3.2 L/yr - ₹9 L/yr |
Senior Engineer
436
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Junior Engineer Civil
378
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
290
salaries
| ₹3.3 L/yr - ₹8.9 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys