Upload Button Icon Add office photos

Filter interviews by

Nagarjuna Construction Company Site Engineer Interview Questions and Answers

Updated 2 Jul 2024

Nagarjuna Construction Company Site Engineer Interview Experiences

5 interviews found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 16 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Cement density and aggregate
  • Q2. Cement set time

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company NCC LIMITED

Site Engineer Interview Questions & Answers

user image 1DS19CV116 TARIF

posted on 21 Apr 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell me about your self.

Site Engineer Interview Questions Asked at Other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimensio ... read more
Q2. What a term of Rolling margin on a steel?
Q3. Which type of pipe Line and it's standards following
Q4. design? 1.what is ASD in steel design? 2.what is special consider ... read more
Q5. What is the lapping zone of beam rebar at top and bottom...? Why ... read more

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 31 Dec 2022

Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is the ratio of M 25 you have used in your project?
  • Ans. 

    The ratio of M 25 used in the project is 1:1:2.

    • The ratio of M 25 concrete is 1 part cement, 1 part fine aggregates, and 2 parts coarse aggregates.

    • This ratio ensures the desired strength and durability of the concrete mix.

    • For example, if we need to prepare 1 cubic meter of M 25 concrete, we would use 350 kg of cement, 350 kg of fine aggregates, and 700 kg of coarse aggregates.

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. What is salary expectation?
  • Ans. Tell him your expected gross salary monthly/annual.
  • Answered Anonymously
  • Q2. What is your current salary?
  • Q3. Tell him truthly your salary per month/annual

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Site Engineer interview:
  • RCC
  • Reinforcement
  • Brick Work
  • Plastering
  • Form work
  • Layout
  • Drawing
Interview preparation tips for other job seekers - Prepare your past and current role and responsibilities what ever you doing.

Site Engineer Interview Questions & Answers

user image Trupti Ranjan Swain

posted on 2 Jul 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
-

I applied via Newspaper Ad and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. How do you handle unexpected technical challenges on-site?
  • Ans. 

    I approach unexpected technical challenges on-site by analyzing the problem, consulting with team members, researching possible solutions, and implementing the most effective course of action.

    • Analyze the problem thoroughly to understand the root cause

    • Consult with team members to gather different perspectives and expertise

    • Research possible solutions by utilizing resources such as technical manuals, online forums, and in...

  • Answered by AI
  • Q2. What steps would you take to ensure environmental compliance on a construction site?
  • Ans. 

    To ensure environmental compliance on a construction site, I would take several steps including conducting regular inspections, implementing erosion control measures, and properly disposing of hazardous materials.

    • Conduct regular inspections to ensure compliance with environmental regulations

    • Implement erosion control measures such as silt fences and sediment basins

    • Properly dispose of hazardous materials to prevent conta...

  • Answered by AI

Nagarjuna Construction Company interview questions for designations

 Site Engineer/Site Supervisor

 (1)

 Civil Site Engineer

 (9)

 Electrical Site Engineer

 (1)

 Senior Civil Site Engineer

 (2)

 Site Supervisor

 (2)

 Civil Site Supervisor

 (1)

 Site Supervisor, Site in Charge and Site Engineer

 (1)

 Civil Site Execution Engineer

 (1)

Site Engineer Interview Questions & Answers

user image chandrasekhar minchala

posted on 6 Dec 2017

Interview Questionnaire 

3 Questions

  • Q1. Coke oven and blast furnace technical lining questions
  • Q2. Site management cost control
  • Q3. How to Time saving
  • Ans. 

    Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.

    • Optimize processes to eliminate inefficiencies and reduce wasted time

    • Utilize technology tools to automate repetitive tasks and streamline workflows

    • Delegate tasks to team members to distribute workload and free up time for higher priority tasks

    • Set clear priorities and focus on important tasks to avoid wasting

  • Answered by AI

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. [07/04, 1:22 PM] kamalrAj: Un akka metar video venuma da [07/04, 1:29 PM] kamalrAj: Un akkava poyi kelu daaaa..... [07/04, 1:31 PM] kamalrAj: Un nilamai ninaicha vadivel mosama Irukumula

I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Pointer usages.
  • Q2. Stack implementation
  • Q3. Multi process

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, and have open thought.

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. What you know about core?
  • Ans. 

    Core is the central part of a structure or object that provides strength and stability.

    • Core is commonly used in construction and engineering.

    • It is the central part of a building or structure that provides support and stability.

    • In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.

    • Examples of core materials include concrete, steel, and wood.

    • A strong core is important for maintain

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you know.

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. What is production?
  • Ans. 

    Production refers to the process of creating goods or services using resources and labor.

    • Production involves transforming raw materials into finished products or providing services to customers.

    • It includes activities such as manufacturing, assembly, packaging, and distribution.

    • Examples of production include car manufacturing, food processing, and software development.

    • Efficient production is essential for businesses to

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1.  Floor Tile thickness, types of tile, company of tile,

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Site Engineer interview?
Nagarjuna Construction Company interview process usually has 1-2 rounds. The most common rounds in the Nagarjuna Construction Company interview process are HR, Technical and Resume Shortlist.
What are the top questions asked in Nagarjuna Construction Company Site Engineer interview?

Some of the top questions asked at the Nagarjuna Construction Company Site Engineer interview -

  1. What is the ratio of M 25 you have used in your proje...read more
  2. What steps would you take to ensure environmental compliance on a construction ...read more
  3. Coke oven and blast furnace technical lining questi...read more

Tell us how to improve this page.

Nagarjuna Construction Company Site Engineer Interview Process

based on 12 interviews

Interview experience

4.8
  
Excellent
View more
Nagarjuna Construction Company Site Engineer Salary
based on 204 salaries
₹1.6 L/yr - ₹5.7 L/yr
10% less than the average Site Engineer Salary in India
View more details

Nagarjuna Construction Company Site Engineer Reviews and Ratings

based on 61 reviews

4.1/5

Rating in categories

4.2

Skill development

3.9

Work-life balance

3.8

Salary

4.0

Job security

3.8

Company culture

3.5

Promotions

4.0

Work satisfaction

Explore 61 Reviews and Ratings
Junior Engineer
894 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
626 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer Civil
491 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
297 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer - Civil
290 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

BHEL

4.1
Compare

Infosys

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview