Filter interviews by
I applied via Job Portal and was interviewed in Jun 2023. There were 2 interview rounds.
True power is the actual power consumed by a device, while reactive power is the power required to establish and maintain the electromagnetic fields in an AC circuit.
True power is measured in watts (W) and represents the actual energy consumed by a device.
Reactive power is measured in volt-amperes reactive (VAR) and represents the power required to establish and maintain the electromagnetic fields in an AC circuit.
True...
I applied via CivilGuruji and was interviewed in Dec 2022. There were 2 interview rounds.
The ratio of M20, M25, M15 is 1:1:2 respectively.
M20 has 1 part cement, 1.5 parts sand and 3 parts aggregate
M25 has 1 part cement, 1 part sand and 2 parts aggregate
M15 has 1 part cement, 2 parts sand and 4 parts aggregate
I applied via Walk-in
Nagarjuna Construction Company interview questions for designations
Top trending discussions
posted on 13 Jan 2025
General aptitude and domain-specific questions.
posted on 18 Feb 2024
I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.
posted on 30 Nov 2023
I applied via Referral and was interviewed in Oct 2023. There were 4 interview rounds.
posted on 9 Mar 2024
The number of bricks needed in 1m3 depends on the size of the bricks being used.
The number of bricks in 1m3 will vary based on the size of the bricks. Standard brick size is 190mm x 90mm x 90mm.
For standard size bricks, approximately 500 bricks are needed in 1m3.
To calculate the number of bricks needed, divide the volume of 1m3 by the volume of one brick.
Fos is a type of admixture used in concrete to improve its workability and durability.
Fos is a water-reducing admixture that helps in reducing the water content in concrete mixtures.
It improves the workability of concrete, making it easier to place and finish.
Fos also enhances the durability of concrete by reducing permeability and increasing strength.
Examples of Fos for concrete include polycarboxylate-based admixture
Interview experience
based on 37 reviews
Rating in categories
Junior Engineer
875
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
798
salaries
| ₹3 L/yr - ₹9 L/yr |
Junior Engineer Civil
459
salaries
| ₹1.8 L/yr - ₹6.5 L/yr |
Senior Engineer
359
salaries
| ₹4 L/yr - ₹11 L/yr |
Civil Site Engineer
258
salaries
| ₹1.9 L/yr - ₹6 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys