I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.
Related to auto level and total station one more thing buliding material
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
WCR stands for Working Capital Ratio.
Working Capital Ratio is a financial metric used to measure a company's liquidity and ability to pay off its short-term debts.
It is calculated by dividing a company's current assets by its current liabilities.
A WCR of 1 or higher indicates that a company has enough current assets to cover its current liabilities.
A WCR below 1 may indicate that a company may have difficulty paying of...
The minimum thickness of grade slab depends on the load it will bear and the soil conditions.
The thickness of the grade slab should be determined by a structural engineer.
It should be thick enough to support the weight of the structure and any additional loads.
The soil conditions should also be taken into consideration when determining the thickness.
For example, if the soil is soft or unstable, a thicker slab may be re...
Planning is the process of creating a roadmap to achieve a specific goal or objective.
It involves identifying the goal or objective
Determining the steps needed to achieve it
Allocating resources and setting timelines
Monitoring progress and making adjustments as necessary
Examples include project planning, financial planning, and strategic planning
I applied via Company Website and was interviewed before Nov 2022. There were 2 interview rounds.
The lap length of a bar in a beam is the length of overlap between two reinforcing bars.
Lap length is important for ensuring the transfer of load between bars.
It helps in maintaining the continuity of reinforcement.
The lap length depends on factors like bar diameter, concrete strength, and design requirements.
It is typically specified in building codes or structural design drawings.
For example, in a beam, the lap lengt...
The ratio of M15 grade of concrete is 1:2:4.
The ratio of M15 grade of concrete refers to the proportion of cement, sand, and aggregate used in the mix.
For M15 grade concrete, the ratio is 1 part cement : 2 parts sand : 4 parts aggregate.
This means that for every 1 unit of cement, 2 units of sand, and 4 units of aggregate are used.
The ratio is usually represented as 1:2:4.
I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.
Surgery in field what ever you ask not issue
Nagarjuna Construction Company interview questions for designations
I applied via Naukri.com and was interviewed before Jan 2022. There were 4 interview rounds.
Get interview-ready with Top Nagarjuna Construction Company Interview Questions
I applied via Walk-in and was interviewed in Feb 2022. There were 2 interview rounds.
Reasoning maths and general awareness
I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.
K7 and K9 are types of ductile iron pipes with different pressure ratings.
K7 pipes have a pressure rating of 7 bar, while K9 pipes have a pressure rating of 9 bar.
The pressure rating determines the maximum pressure the pipe can withstand without bursting.
K9 pipes are thicker and stronger than K7 pipes, making them suitable for high-pressure applications.
DI pipes are commonly used in water supply, sewage, and irrigation...
I applied via Walk-in and was interviewed in Sep 2020. There was 1 interview round.
Top trending discussions
I was interviewed in Dec 2024.
Yes, I have consistently maintained standard quality in my previous company by following industry best practices and ensuring compliance with regulations.
Implemented quality control measures to ensure compliance with project specifications
Regularly conducted quality inspections and audits to identify and address any issues
Collaborated with project team members to address quality concerns and make necessary improvements
...
Yes, I use drawing software like AutoCAD and technology like GPS in my work.
I use drawing software like AutoCAD to create detailed plans and designs for construction projects.
I utilize technology like GPS to accurately survey and map out sites for construction.
Drawing and technology help me streamline the design and construction process, leading to more efficient and precise results.
I prioritize tasks, set goals, use time management tools, and maintain a healthy work-life balance.
Prioritize tasks based on deadlines and importance
Set specific goals and create a schedule to achieve them
Use time management tools such as calendars, to-do lists, and reminders
Maintain a healthy work-life balance by setting boundaries and taking breaks
Delegate tasks when necessary to avoid burnout
Examples: Using project ...
Calculator for material quantity on site material
Quantity of a specific item or material is calculated by multiplying the dimensions and density of the material.
Calculate volume by multiplying length, width, and height
Determine density of the material
Multiply volume by density to get quantity
For example, to calculate quantity of concrete needed for a slab, multiply slab dimensions by density of concrete
I use a combination of document review, site visits, and communication with stakeholders to verify information.
Reviewing project documents such as drawings, specifications, and reports
Conducting site visits to physically inspect the work and verify conditions
Communicating with project team members, clients, and contractors to clarify information
Utilizing surveying and testing equipment to validate data
Cross-referencing...
based on 9 interviews
1 Interview rounds
based on 85 reviews
Rating in categories
Junior Engineer
883
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
618
salaries
| ₹3.1 L/yr - ₹8.9 L/yr |
Junior Engineer Civil
387
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Senior Engineer
299
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Assistant Engineer - Civil
292
salaries
| ₹3.3 L/yr - ₹8.9 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys