Filter interviews by
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
WCR stands for Working Capital Ratio.
Working Capital Ratio is a financial metric used to measure a company's liquidity and ability to pay off its short-term debts.
It is calculated by dividing a company's current assets by its current liabilities.
A WCR of 1 or higher indicates that a company has enough current assets to cover its current liabilities.
A WCR below 1 may indicate that a company may have difficulty paying of...
The minimum thickness of grade slab depends on the load it will bear and the soil conditions.
The thickness of the grade slab should be determined by a structural engineer.
It should be thick enough to support the weight of the structure and any additional loads.
The soil conditions should also be taken into consideration when determining the thickness.
For example, if the soil is soft or unstable, a thicker slab may be re...
Planning is the process of creating a roadmap to achieve a specific goal or objective.
It involves identifying the goal or objective
Determining the steps needed to achieve it
Allocating resources and setting timelines
Monitoring progress and making adjustments as necessary
Examples include project planning, financial planning, and strategic planning
I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.
Related to auto level and total station one more thing buliding material
I applied via Company Website and was interviewed before Nov 2022. There were 2 interview rounds.
The lap length of a bar in a beam is the length of overlap between two reinforcing bars.
Lap length is important for ensuring the transfer of load between bars.
It helps in maintaining the continuity of reinforcement.
The lap length depends on factors like bar diameter, concrete strength, and design requirements.
It is typically specified in building codes or structural design drawings.
For example, in a beam, the lap lengt...
The ratio of M15 grade of concrete is 1:2:4.
The ratio of M15 grade of concrete refers to the proportion of cement, sand, and aggregate used in the mix.
For M15 grade concrete, the ratio is 1 part cement : 2 parts sand : 4 parts aggregate.
This means that for every 1 unit of cement, 2 units of sand, and 4 units of aggregate are used.
The ratio is usually represented as 1:2:4.
I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.
Surgery in field what ever you ask not issue
Nagarjuna Construction Company interview questions for designations
I applied via Naukri.com and was interviewed before Jan 2022. There were 4 interview rounds.
Get interview-ready with Top Nagarjuna Construction Company Interview Questions
I applied via Walk-in and was interviewed in Feb 2022. There were 2 interview rounds.
Reasoning maths and general awareness
I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.
K7 and K9 are types of ductile iron pipes with different pressure ratings.
K7 pipes have a pressure rating of 7 bar, while K9 pipes have a pressure rating of 9 bar.
The pressure rating determines the maximum pressure the pipe can withstand without bursting.
K9 pipes are thicker and stronger than K7 pipes, making them suitable for high-pressure applications.
DI pipes are commonly used in water supply, sewage, and irrigation...
I applied via Walk-in and was interviewed in Sep 2020. There was 1 interview round.
Top trending discussions
I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.
Face to face interview
BBS stands for Bar Bending Schedule and Survey refers to the process of measuring and mapping an area.
BBS is a document that provides details of reinforcement cutting length, type, and bending shape for construction.
Survey involves measuring and mapping land to determine boundaries, elevations, and other important information.
Both BBS and Survey are crucial in the construction industry to ensure accurate and efficient
Estimation is the process of calculating the quantities and costs of materials, labor, and equipment required for a construction project.
Estimation involves determining the quantities of materials needed for a project.
It also includes calculating the labor hours required for the project.
Estimation considers the costs of equipment and other resources needed for the project.
Estimation helps in creating a budget and timel
Soil test is a process of analyzing the properties of soil to determine its suitability for construction purposes.
Soil tests help in determining the strength, permeability, compaction, and other important properties of soil.
Different types of soil tests include sieve analysis, moisture content test, proctor compaction test, etc.
Results of soil tests help in designing foundations, pavements, retaining walls, and other s...
RCC stands for Reinforced Cement Concrete, a composite material made of concrete and steel reinforcement.
RCC is a versatile construction material used in buildings, bridges, dams, etc.
It combines the compressive strength of concrete with the tensile strength of steel reinforcement.
RCC elements include beams, columns, slabs, and foundations.
Example: RCC beams are used to support the load of the structure and transfer it...
DPR stands for Detailed Project Report, which is a comprehensive document that outlines the details of a construction project.
DPR includes information on project scope, objectives, cost estimates, timelines, resources, and potential risks.
It serves as a roadmap for the project, guiding the engineers and stakeholders throughout the construction process.
DPR is crucial for obtaining approvals, funding, and ensuring the su...
based on 81 reviews
Rating in categories
Junior Engineer
899
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Engineer
586
salaries
| ₹3.2 L/yr - ₹9 L/yr |
Junior Engineer Civil
446
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Senior Engineer
353
salaries
| ₹4 L/yr - ₹11 L/yr |
Civil Site Engineer
260
salaries
| ₹1.9 L/yr - ₹6 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Infosys