Filter interviews by
The ratio of M15 grade of concrete is 1:2:4.
The ratio of M15 grade of concrete refers to the proportion of cement, sand, and aggregate used in the mix.
For M15 grade concrete, the ratio is 1 part cement : 2 parts sand : 4 parts aggregate.
This means that for every 1 unit of cement, 2 units of sand, and 4 units of aggregate are used.
The ratio is usually represented as 1:2:4.
The lap length of a bar in a beam is the length of overlap between two reinforcing bars.
Lap length is important for ensuring the transfer of load between bars.
It helps in maintaining the continuity of reinforcement.
The lap length depends on factors like bar diameter, concrete strength, and design requirements.
It is typically specified in building codes or structural design drawings.
For example, in a beam, the lap ...
Planning is the process of creating a roadmap to achieve a specific goal or objective.
It involves identifying the goal or objective
Determining the steps needed to achieve it
Allocating resources and setting timelines
Monitoring progress and making adjustments as necessary
Examples include project planning, financial planning, and strategic planning
The minimum thickness of grade slab depends on the load it will bear and the soil conditions.
The thickness of the grade slab should be determined by a structural engineer.
It should be thick enough to support the weight of the structure and any additional loads.
The soil conditions should also be taken into consideration when determining the thickness.
For example, if the soil is soft or unstable, a thicker slab may ...
WCR stands for Working Capital Ratio.
Working Capital Ratio is a financial metric used to measure a company's liquidity and ability to pay off its short-term debts.
It is calculated by dividing a company's current assets by its current liabilities.
A WCR of 1 or higher indicates that a company has enough current assets to cover its current liabilities.
A WCR below 1 may indicate that a company may have difficulty payi...
K7 and K9 are types of ductile iron pipes with different pressure ratings.
K7 pipes have a pressure rating of 7 bar, while K9 pipes have a pressure rating of 9 bar.
The pressure rating determines the maximum pressure the pipe can withstand without bursting.
K9 pipes are thicker and stronger than K7 pipes, making them suitable for high-pressure applications.
DI pipes are commonly used in water supply, sewage, and irrig...
Billing for building structures involves quantifying work done and pricing it accurately for project management.
Understand the scope of work: Clearly define what work is included in the billing.
Measurement: Use standard measurement techniques (e.g., cubic meters for concrete) to quantify work.
Rate analysis: Determine the cost per unit for materials, labor, and overhead.
Bill of Quantities (BoQ): Prepare a detailed ...
Concrete grade indicates its compressive strength, crucial for structural integrity in construction.
Concrete grades are classified by their compressive strength, measured in megapascals (MPa).
Common grades include M20 (20 MPa), M25 (25 MPa), and M30 (30 MPa), used for different structural applications.
Higher grades like M40 and M50 are used for high-strength applications, such as bridges and high-rise buildings.
Th...
Calculating shuttering material involves determining dimensions, types, and quantities needed for formwork in construction.
Determine the dimensions of the structure (length, width, height).
Calculate the area of the formwork required using the formula: Area = Length x Height.
Consider the type of shuttering material (plywood, steel, etc.) based on project requirements.
Account for waste and overlaps; typically add 10...
Understanding the layout of columns, shear walls, and brickwork is crucial for structural integrity in civil engineering.
Columns should be placed at regular intervals to support beams and slabs effectively.
Shear walls are typically located in areas requiring high lateral strength, such as near stairwells or elevators.
Brickwork should be aligned with structural elements to ensure load distribution and stability.
Exa...
I appeared for an interview in Jun 2025, where I was asked the following questions.
Understanding the layout of columns, shear walls, and brickwork is crucial for structural integrity in civil engineering.
Columns should be placed at regular intervals to support beams and slabs effectively.
Shear walls are typically located in areas requiring high lateral strength, such as near stairwells or elevators.
Brickwork should be aligned with structural elements to ensure load distribution and stability.
Example:...
An auto level is a surveying instrument used for leveling and measuring height differences accurately in construction projects.
Used for establishing a horizontal line of sight over long distances.
Commonly employed in grading, excavation, and foundation work.
Example: Setting up an auto level to ensure a foundation is level before pouring concrete.
Helps in aligning structures like walls and fences accurately.
Can be used ...
Concrete grade indicates its compressive strength, crucial for structural integrity in construction.
Concrete grades are classified by their compressive strength, measured in megapascals (MPa).
Common grades include M20 (20 MPa), M25 (25 MPa), and M30 (30 MPa), used for different structural applications.
Higher grades like M40 and M50 are used for high-strength applications, such as bridges and high-rise buildings.
The gra...
Calculating shuttering material involves determining dimensions, types, and quantities needed for formwork in construction.
Determine the dimensions of the structure (length, width, height).
Calculate the area of the formwork required using the formula: Area = Length x Height.
Consider the type of shuttering material (plywood, steel, etc.) based on project requirements.
Account for waste and overlaps; typically add 10-15% ...
Billing for building structures involves quantifying work done and pricing it accurately for project management.
Understand the scope of work: Clearly define what work is included in the billing.
Measurement: Use standard measurement techniques (e.g., cubic meters for concrete) to quantify work.
Rate analysis: Determine the cost per unit for materials, labor, and overhead.
Bill of Quantities (BoQ): Prepare a detailed BoQ l...
I appeared for an interview in Oct 2024, where I was asked the following questions.
I applied via Company Website and was interviewed in Aug 2023. There were 3 interview rounds.
Related to auto level and total station one more thing buliding material
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
The minimum thickness of grade slab depends on the load it will bear and the soil conditions.
The thickness of the grade slab should be determined by a structural engineer.
It should be thick enough to support the weight of the structure and any additional loads.
The soil conditions should also be taken into consideration when determining the thickness.
For example, if the soil is soft or unstable, a thicker slab may be re...
Planning is the process of creating a roadmap to achieve a specific goal or objective.
It involves identifying the goal or objective
Determining the steps needed to achieve it
Allocating resources and setting timelines
Monitoring progress and making adjustments as necessary
Examples include project planning, financial planning, and strategic planning
I applied via Company Website and was interviewed before Nov 2022. There were 2 interview rounds.
The lap length of a bar in a beam is the length of overlap between two reinforcing bars.
Lap length is important for ensuring the transfer of load between bars.
It helps in maintaining the continuity of reinforcement.
The lap length depends on factors like bar diameter, concrete strength, and design requirements.
It is typically specified in building codes or structural design drawings.
For example, in a beam, the lap lengt...
The ratio of M15 grade of concrete is 1:2:4.
The ratio of M15 grade of concrete refers to the proportion of cement, sand, and aggregate used in the mix.
For M15 grade concrete, the ratio is 1 part cement : 2 parts sand : 4 parts aggregate.
This means that for every 1 unit of cement, 2 units of sand, and 4 units of aggregate are used.
The ratio is usually represented as 1:2:4.
I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.
Surgery in field what ever you ask not issue
I applied via Naukri.com and was interviewed before Jan 2022. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Feb 2022. There were 2 interview rounds.
Reasoning maths and general awareness
I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.
Top trending discussions
based on 11 interview experiences
Difficulty level
Duration
based on 94 reviews
Rating in categories
Junior Engineer
965
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Assistant Engineer
837
salaries
| ₹3 L/yr - ₹9.1 L/yr |
Senior Engineer
420
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Junior Engineer Civil
377
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Assistant Engineer - Civil
291
salaries
| ₹3.3 L/yr - ₹10 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Kalpataru Projects International