Q. What is the mix ratio for M15 grade concrete?
Ans. 

The ratio of M15 grade of concrete is 1:2:4.

  • The ratio of M15 grade of concrete refers to the proportion of cement, sand, and aggregate used in the mix.

  • For M15 grade concrete, the ratio is 1 part cement : 2 parts sand : 4 parts aggregate.

  • This means that for every 1 unit of cement, 2 units of sand, and 4 units of aggregate are used.

  • The ratio is usually represented as 1:2:4.

A Civil Site Engineer was asked
Q. What is the lap length of a bar in a beam?
Ans. 

The lap length of a bar in a beam is the length of overlap between two reinforcing bars.

  • Lap length is important for ensuring the transfer of load between bars.

  • It helps in maintaining the continuity of reinforcement.

  • The lap length depends on factors like bar diameter, concrete strength, and design requirements.

  • It is typically specified in building codes or structural design drawings.

  • For example, in a beam, the lap ...

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum grade of concrete used in RCC works?
Q2. If you have a 10x10 feet room and you have 600x600 mm size tiles, ... read more
asked in TCE
Q3. If your M50 concrete's 28-day cube test result is below 100%, wha ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the shelf life of an open bag of cement?
A Civil Site Engineer was asked
Q. Can you please define planning?
Ans. 

Planning is the process of creating a roadmap to achieve a specific goal or objective.

  • It involves identifying the goal or objective

  • Determining the steps needed to achieve it

  • Allocating resources and setting timelines

  • Monitoring progress and making adjustments as necessary

  • Examples include project planning, financial planning, and strategic planning

A Civil Site Engineer was asked
Q. What is the minimum thickness of a grade slab?
Ans. 

The minimum thickness of grade slab depends on the load it will bear and the soil conditions.

  • The thickness of the grade slab should be determined by a structural engineer.

  • It should be thick enough to support the weight of the structure and any additional loads.

  • The soil conditions should also be taken into consideration when determining the thickness.

  • For example, if the soil is soft or unstable, a thicker slab may ...

A Civil Site Engineer was asked
Q. What does WCR mean?
Ans. 

WCR stands for Working Capital Ratio.

  • Working Capital Ratio is a financial metric used to measure a company's liquidity and ability to pay off its short-term debts.

  • It is calculated by dividing a company's current assets by its current liabilities.

  • A WCR of 1 or higher indicates that a company has enough current assets to cover its current liabilities.

  • A WCR below 1 may indicate that a company may have difficulty payi...

A Civil Site Engineer was asked
Q. What do K7 and K9 signify in relation to DI pipes?
Ans. 

K7 and K9 are types of ductile iron pipes with different pressure ratings.

  • K7 pipes have a pressure rating of 7 bar, while K9 pipes have a pressure rating of 9 bar.

  • The pressure rating determines the maximum pressure the pipe can withstand without bursting.

  • K9 pipes are thicker and stronger than K7 pipes, making them suitable for high-pressure applications.

  • DI pipes are commonly used in water supply, sewage, and irrig...

A Civil Site Engineer was asked 2d ago
Q. Billing of use work of building structure
Ans. 

Billing for building structures involves quantifying work done and pricing it accurately for project management.

  • Understand the scope of work: Clearly define what work is included in the billing.

  • Measurement: Use standard measurement techniques (e.g., cubic meters for concrete) to quantify work.

  • Rate analysis: Determine the cost per unit for materials, labor, and overhead.

  • Bill of Quantities (BoQ): Prepare a detailed ...

Are these interview questions helpful?
A Civil Site Engineer was asked 2d ago
Q. Grade of concrete material
Ans. 

Concrete grade indicates its compressive strength, crucial for structural integrity in construction.

  • Concrete grades are classified by their compressive strength, measured in megapascals (MPa).

  • Common grades include M20 (20 MPa), M25 (25 MPa), and M30 (30 MPa), used for different structural applications.

  • Higher grades like M40 and M50 are used for high-strength applications, such as bridges and high-rise buildings.

  • Th...

A Civil Site Engineer was asked 2d ago
Q. Calculation of shuttering material
Ans. 

Calculating shuttering material involves determining dimensions, types, and quantities needed for formwork in construction.

  • Determine the dimensions of the structure (length, width, height).

  • Calculate the area of the formwork required using the formula: Area = Length x Height.

  • Consider the type of shuttering material (plywood, steel, etc.) based on project requirements.

  • Account for waste and overlaps; typically add 10...

A Civil Site Engineer was asked 2d ago
Q. Layout of columns shear wall and brick machinery work
Ans. 

Understanding the layout of columns, shear walls, and brickwork is crucial for structural integrity in civil engineering.

  • Columns should be placed at regular intervals to support beams and slabs effectively.

  • Shear walls are typically located in areas requiring high lateral strength, such as near stairwells or elevators.

  • Brickwork should be aligned with structural elements to ensure load distribution and stability.

  • Exa...

Nagarjuna Construction Company Civil Site Engineer Interview Experiences

11 interviews found

Civil Site Engineer Interview Questions & Answers

user image UDAYPRATAP CHAUHAN

posted on 1 Jul 2025

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jun 2025, where I was asked the following questions.

  • Q1. Layout of columns shear wall and brick machinery work
  • Ans. 

    Understanding the layout of columns, shear walls, and brickwork is crucial for structural integrity in civil engineering.

    • Columns should be placed at regular intervals to support beams and slabs effectively.

    • Shear walls are typically located in areas requiring high lateral strength, such as near stairwells or elevators.

    • Brickwork should be aligned with structural elements to ensure load distribution and stability.

    • Example:...

  • Answered by AI
  • Q2. Use of auto level
  • Ans. 

    An auto level is a surveying instrument used for leveling and measuring height differences accurately in construction projects.

    • Used for establishing a horizontal line of sight over long distances.

    • Commonly employed in grading, excavation, and foundation work.

    • Example: Setting up an auto level to ensure a foundation is level before pouring concrete.

    • Helps in aligning structures like walls and fences accurately.

    • Can be used ...

  • Answered by AI
  • Q3. Grade of concrete material
  • Ans. 

    Concrete grade indicates its compressive strength, crucial for structural integrity in construction.

    • Concrete grades are classified by their compressive strength, measured in megapascals (MPa).

    • Common grades include M20 (20 MPa), M25 (25 MPa), and M30 (30 MPa), used for different structural applications.

    • Higher grades like M40 and M50 are used for high-strength applications, such as bridges and high-rise buildings.

    • The gra...

  • Answered by AI
  • Q4. Calculation of shuttering material
  • Ans. 

    Calculating shuttering material involves determining dimensions, types, and quantities needed for formwork in construction.

    • Determine the dimensions of the structure (length, width, height).

    • Calculate the area of the formwork required using the formula: Area = Length x Height.

    • Consider the type of shuttering material (plywood, steel, etc.) based on project requirements.

    • Account for waste and overlaps; typically add 10-15% ...

  • Answered by AI
  • Q5. Billing of use work of building structure
  • Ans. 

    Billing for building structures involves quantifying work done and pricing it accurately for project management.

    • Understand the scope of work: Clearly define what work is included in the billing.

    • Measurement: Use standard measurement techniques (e.g., cubic meters for concrete) to quantify work.

    • Rate analysis: Determine the cost per unit for materials, labor, and overhead.

    • Bill of Quantities (BoQ): Prepare a detailed BoQ l...

  • Answered by AI
  • Q6. Safety protection allowed
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I appeared for an interview in Oct 2024, where I was asked the following questions.

  • Q1. Road construction highway questions
  • Q2. Road construction RS Wall
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Assignment 

Related to auto level and total station one more thing buliding material

Round 3 - HR 

(1 Question)

  • Q1. About the site work

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Civil Site Engineer interview:
  • For leveling

I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is meaning wcr ?
  • Q2. What is civil engineers rool
  • Q3. What is the minimum thickness of grade slab
  • Ans. 

    The minimum thickness of grade slab depends on the load it will bear and the soil conditions.

    • The thickness of the grade slab should be determined by a structural engineer.

    • It should be thick enough to support the weight of the structure and any additional loads.

    • The soil conditions should also be taken into consideration when determining the thickness.

    • For example, if the soil is soft or unstable, a thicker slab may be re...

  • Answered by AI
  • Q4. Can u plss define planning
  • Ans. 

    Planning is the process of creating a roadmap to achieve a specific goal or objective.

    • It involves identifying the goal or objective

    • Determining the steps needed to achieve it

    • Allocating resources and setting timelines

    • Monitoring progress and making adjustments as necessary

    • Examples include project planning, financial planning, and strategic planning

  • Answered by AI
  • Q5. What main roles of Qc

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Civil Site Engineer interview:
  • Structural engineer course
Interview preparation tips for other job seekers - Civil engineers are in Royalti and any problem are coming solved is the one of the big attitude
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is lap length of bar in beam.
  • Ans. 

    The lap length of a bar in a beam is the length of overlap between two reinforcing bars.

    • Lap length is important for ensuring the transfer of load between bars.

    • It helps in maintaining the continuity of reinforcement.

    • The lap length depends on factors like bar diameter, concrete strength, and design requirements.

    • It is typically specified in building codes or structural design drawings.

    • For example, in a beam, the lap lengt...

  • Answered by AI
  • Q2. Ratio of M15 grade of concrete
  • Ans. 

    The ratio of M15 grade of concrete is 1:2:4.

    • The ratio of M15 grade of concrete refers to the proportion of cement, sand, and aggregate used in the mix.

    • For M15 grade concrete, the ratio is 1 part cement : 2 parts sand : 4 parts aggregate.

    • This means that for every 1 unit of cement, 2 units of sand, and 4 units of aggregate are used.

    • The ratio is usually represented as 1:2:4.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Any civil engineer have must attentioned in technical part of Structure and take proper position in Structure according to drawing.

I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Site engineer 

(2 Questions)

  • Q1. Building construction
  • Q2. High way roads and buildings
Round 3 - Assignment 

Surgery in field what ever you ask not issue

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Civil Site Engineer interview:
  • Civil Engineering
Interview preparation tips for other job seekers - Site works and two years experience worked in GV REDDY INFRA
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Education and Work Experience Discussions.
Round 3 - Technical 

(4 Questions)

  • Q1. About your Project and Execution step by step in brief.
  • Q2. Some technical questions related to your site work and computer proficiency.
  • Q3. Quantity take off and contractor billing.
  • Q4. QS related questions.
Round 4 - HR 

(1 Question)

  • Q1. Salary negotiation and get the offer.☺️

Interview Preparation Tips

Interview preparation tips for other job seekers - Devlope your skills as per company demands.
Nothing else.

I applied via Walk-in and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Reasoning maths and general awareness

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice interview....asked about concrete and RCC,survey quality system

Interview Questionnaire 

1 Question

  • Q1. Building and drain

I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What type of DI pipes k7 and k9 means

Interview Preparation Tips

Interview preparation tips for other job seekers - Ans. Any questions confidently

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Nagarjuna Construction Company?
Ask anonymously on communities.

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Civil Site Engineer interview?
Nagarjuna Construction Company interview process usually has 2-3 rounds. The most common rounds in the Nagarjuna Construction Company interview process are Resume Shortlist, Technical and HR.
How to prepare for Nagarjuna Construction Company Civil Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Nagarjuna Construction Company. The most common topics and skills that interviewers at Nagarjuna Construction Company expect are High Rise Building, Real Estate Construction, Site Coordination and Site Execution.
What are the top questions asked in Nagarjuna Construction Company Civil Site Engineer interview?

Some of the top questions asked at the Nagarjuna Construction Company Civil Site Engineer interview -

  1. What is the minimum thickness of grade s...read more
  2. What is meaning wc...read more
  3. What type of DI pipes k7 and k9 me...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.5/5

based on 11 interview experiences

Difficulty level

Easy 17%
Moderate 83%

Duration

Less than 2 weeks 50%
2-4 weeks 50%
View more
Nagarjuna Construction Company Civil Site Engineer Salary
based on 213 salaries
₹1.2 L/yr - ₹6.5 L/yr
9% more than the average Civil Site Engineer Salary in India
View more details

Nagarjuna Construction Company Civil Site Engineer Reviews and Ratings

based on 94 reviews

3.8/5

Rating in categories

3.5

Skill development

3.6

Work-life balance

3.8

Salary

3.5

Job security

3.5

Company culture

3.2

Promotions

3.6

Work satisfaction

Explore 94 Reviews and Ratings
Junior Engineer
965 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Assistant Engineer
837 salaries
unlock blur

₹3 L/yr - ₹9.1 L/yr

Senior Engineer
420 salaries
unlock blur

₹4.3 L/yr - ₹11 L/yr

Junior Engineer Civil
377 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Assistant Engineer - Civil
291 salaries
unlock blur

₹3.3 L/yr - ₹10 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
write
Share an Interview