Upload Button Icon Add office photos

Filter interviews by

Nagarjuna Construction Company Assistant Engineer - Civil Interview Questions, Process, and Tips

Updated 18 Dec 2024

Top Nagarjuna Construction Company Assistant Engineer - Civil Interview Questions and Answers

View all 6 questions

Nagarjuna Construction Company Assistant Engineer - Civil Interview Experiences

10 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About current company
Round 2 - Technical 

(3 Questions)

  • Q1. About is codes of building construction
  • Q2. Current job responsibilities..... related questions
  • Q3. About bar bending shedule , lab test
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Current job responsibilities.......
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Past work experience
  • Ans. 

    I have 3 years of experience working as a civil engineer for a construction company.

    • Managed multiple construction projects simultaneously

    • Performed site inspections and ensured compliance with building codes

    • Collaborated with architects and contractors to resolve design issues

  • Answered by AI
  • Q2. Salary expectations

Assistant Engineer - Civil Interview Questions Asked at Other Companies

asked in TCE
Q1. If the cubes are failed then what will you do ?
Q2. What is mixtatio of concrete, what are the type of IS code, what ... read more
asked in TCE
Q3. What kind of steel you used in previous project ?
Q4. Why water ratio in cement concrete mix is very essential part of ... read more
Q5. How many kg of cement does one m3 require and how many kg of ceme ... read more
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Basic knowledge of construction work and according to your experience what work had you done in previous company because they ask you according to your CV.
  • Q2. Estimation and costing
  • Q3. Bar bending schedule must be known
  • Q4. Structure analysis should have

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Assistant Engineer - Civil interview:
  • Structural Analysis
  • Quantity Estimation
  • Building Material
  • AutoCAD
Interview preparation tips for other job seekers - Bending moment.
Covering block.
Cement required for 1 sqm of plaster work.
Concrete work as per IS CODE.
IS Code should be known.
Development length.
Overlap length.
Weight of steel bar.
Volume of cement.
Etc.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About structure work.
  • Q2. Slab steel use, which dia
  • Ans. 

    Slab steel reinforcement typically uses 8mm to 16mm diameter bars.

    • Slab steel reinforcement typically uses bars ranging from 8mm to 16mm in diameter

    • The choice of diameter depends on the span, load, and design requirements of the slab

    • Thicker bars are used for heavier loads and longer spans, while thinner bars are used for lighter loads and shorter spans

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Are you comfortable for assam location?
  • Q2. Tinsukia assam location was comfortable for me.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Nagarjuna Construction Company interview questions for designations

 Civil Engineer

 (14)

 Junior Engineer Civil

 (10)

 Civil Site Engineer

 (9)

 Senior Civil Engineer

 (3)

 Project Engineer - Civil

 (1)

 Diploma Civil Engineer

 (1)

 Senior Civil Site Engineer

 (2)

 QA/QC Civil Engineer

 (1)

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2020. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Self introduction
  • Q2. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - NCC is good company
Work cluter is very good
Management is good
I am happy with my job and organisation
Thanks

Get interview-ready with Top Nagarjuna Construction Company Interview Questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Deduction rules for plastering
  • Ans. 

    Deduction rules for plastering in civil engineering

    • Deductions are made for openings like doors and windows

    • Deductions are made for thickness of plaster

    • Deductions are made for uneven surfaces

    • Deductions are made for wastage of material

    • Deductions are made for scaffolding

    • Example: If the area to be plastered is 100 sq. ft. and the area of openings is 20 sq. ft., then the net area for plastering will be 80 sq. ft.

  • Answered by AI
  • Q2. Deduction rules for concrete
  • Ans. 

    Deduction rules for concrete

    • Deductions are made to account for the shrinkage and settlement of concrete

    • The deduction rate varies based on the type of concrete and the environmental conditions

    • Typically, a deduction of 1/8 inch per 10 feet is made for normal weight concrete

    • For lightweight concrete, the deduction rate is 1/4 inch per 10 feet

    • The deductions are made from the specified dimensions of the concrete element

  • Answered by AI
  • Q3. Price Escalation bill

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for deduction rules used for quantity estimation
Round 1 - Technical 

(2 Questions)

  • Q1. Cost of 1cum concrete work
  • Ans. 

    The cost of 1cum concrete work depends on various factors such as the type of concrete, location, labor cost, etc.

    • The cost of 1cum concrete work varies depending on the type of concrete used, such as M20, M25, etc.

    • The location of the construction site also affects the cost of concrete work.

    • The cost of labor is another factor that affects the cost of concrete work.

    • Additional costs such as transportation, taxes, and perm...

  • Answered by AI
  • Q2. How to do you check window
  • Ans. 

    To check a window, inspect its frame, glass, and hardware for any damage or wear.

    • Check the frame for cracks or warping

    • Inspect the glass for chips, cracks, or fogging

    • Test the hardware to ensure it opens and closes smoothly

    • Check for any gaps or drafts around the window

    • Look for signs of water damage or mold

    • Consider the age and condition of the window

    • Consult a professional if unsure about any issues

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. How much salary growth is expecting

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well for technical because this round decides your package

Interview Questionnaire 

2 Questions

  • Q1. Maximum questions about quality assurance
  • Q2. IS456 IS 2502 IS 10262 IS 1200 IS 383 itc

Interview Preparation Tips

Interview preparation tips for other job seekers - Maximum questions prepared quality assurance and project management

Interview Questionnaire 

2 Questions

  • Q1. What is density of cement?
  • Ans. 

    The density of cement varies depending on the type of cement used.

    • The density of ordinary Portland cement is around 1440 kg/m³.

    • The density of white cement is around 1300 kg/m³.

    • The density of rapid hardening cement is around 1250 kg/m³.

    • The density of low heat cement is around 1200 kg/m³.

    • The density of high alumina cement is around 1400 kg/m³.

  • Answered by AI
  • Q2. The density of cement is 1440 kg/cum

I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basic knowledge about civil engineering.Interviw about based on previous experience.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview process is very good,please before going to the interview once check all the previous work details,and practical knowledge.

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Assistant Engineer - Civil interview?
Nagarjuna Construction Company interview process usually has 1-2 rounds. The most common rounds in the Nagarjuna Construction Company interview process are Technical, HR and Resume Shortlist.
What are the top questions asked in Nagarjuna Construction Company Assistant Engineer - Civil interview?

Some of the top questions asked at the Nagarjuna Construction Company Assistant Engineer - Civil interview -

  1. What is density of ceme...read more
  2. How to do you check win...read more
  3. slab steel use, which ...read more

Tell us how to improve this page.

People are getting interviews through

based on 5 Nagarjuna Construction Company interviews
Company Website
WalkIn
40%
40%
20% candidates got the interview through other sources.
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates
Nagarjuna Construction Company Assistant Engineer - Civil Salary
based on 245 salaries
₹3.3 L/yr - ₹8 L/yr
28% more than the average Assistant Engineer - Civil Salary in India
View more details

Nagarjuna Construction Company Assistant Engineer - Civil Reviews and Ratings

based on 96 reviews

4.1/5

Rating in categories

3.7

Skill development

3.7

Work-Life balance

3.9

Salary & Benefits

4.1

Job Security

3.7

Company culture

3.7

Promotions/Appraisal

3.7

Work Satisfaction

Explore 96 Reviews and Ratings
Junior Engineer
898 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Assistant Engineer
596 salaries
unlock blur

₹3.2 L/yr - ₹8.9 L/yr

Junior Engineer Civil
461 salaries
unlock blur

₹1.8 L/yr - ₹6.3 L/yr

Senior Engineer
423 salaries
unlock blur

₹4 L/yr - ₹11 L/yr

Civil Site Engineer
259 salaries
unlock blur

₹1.9 L/yr - ₹6 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

BHEL

4.2
Compare

Infosys

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview