The density of RCC structure typically ranges from 2200 to 2500 kg/m^3.
Density of RCC is influenced by the type and proportion of materials used.
Common density range for RCC is 2200 to 2500 kg/m^3.
Higher density indicates stronger and more durable RCC structure.
I applied via Walk-in and was interviewed in Apr 2023. There were 3 interview rounds.
I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.
Slump test is a measure of the consistency of fresh concrete.
It is used to determine the workability of concrete.
The test involves filling a standard cone-shaped container with concrete and then removing the cone to see how much the concrete slumps or settles.
The amount of slump is measured in millimeters and indicates the wetness or dryness of the concrete.
Curing is the process of maintaining moisture in the concrete ...
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
Hindustan Construction Company interview questions for designations
I applied via Naukri.com and was interviewed in Aug 2021. There were 3 interview rounds.
Get interview-ready with Top Hindustan Construction Company Interview Questions
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
Initial setting time of cement is the time taken by cement to harden and attain a particular strength.
Initial setting time is determined by Vicat apparatus
It is the time taken for the cement to lose its plasticity and become hard
The standard initial setting time for ordinary Portland cement is 30 minutes
Factors affecting initial setting time include temperature, water-cement ratio, and type of cement
The elongation % of steel fy 500 is approximately 12%.
Elongation % is the measure of ductility of a material.
It is the percentage increase in length of a material before it fractures under tension.
For steel fy 500, the elongation % is approximately 12%.
This means that the steel can stretch up to 12% of its original length before it breaks.
The amount of cement required for 1 cubic meter varies depending on the concrete mix design.
The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.
The mix design specifies the ratio of cement to other materials like sand and aggregates.
For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.
It is important to accurately calculate ...
Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3
Density of steel is higher than that of concrete and sand
Density of concrete varies depending on the mix design
Density of sand can vary depending on the source and moisture content
Top trending discussions
I applied via campus placement at Visvesvaraya National Institute of Technology (VNIT), Nagpur and was interviewed in Oct 2024. There was 1 interview round.
A propped cantilever beam is a type of beam that is supported at one end and has a support (prop) at some point along its length.
Propped cantilever beams have a fixed support at one end and a prop at some point along the beam's length.
The prop helps to reduce the bending moment and deflection at the free end of the beam.
These beams are commonly used in construction to support overhanging structures or balconies.
Example...
The beam with the highest thickness will depend on the specific design and requirements of the structure.
The beam with the highest thickness will typically be a main load-bearing beam in the structure.
Factors such as the span of the beam, the load it needs to support, and the material used will determine the required thickness.
For example, a bridge beam supporting heavy traffic will likely have a higher thickness than
based on 61 reviews
Rating in categories
Civil Site Engineer
227
salaries
| ₹2.2 L/yr - ₹8.6 L/yr |
Site Engineer
216
salaries
| ₹2.4 L/yr - ₹7 L/yr |
Quantity Surveyor
56
salaries
| ₹3.5 L/yr - ₹7.2 L/yr |
Senior Planning Engineer
53
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Manager
47
salaries
| ₹9.7 L/yr - ₹19.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA