Filter interviews by
Clear (1)
I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.
Top trending discussions
posted on 14 Nov 2023
I applied via Job Fair and was interviewed in Oct 2023. There were 3 interview rounds.
posted on 22 Dec 2021
posted on 31 Jan 2017
I appeared for an interview in Oct 2016.
posted on 5 Jul 2017
I appeared for an interview in Jul 2017.
Experienced Quality Engineer with a background in manufacturing and process improvement.
Bachelor's degree in Engineering
Certified Six Sigma Black Belt
Proficient in statistical analysis tools like Minitab
Led cross-functional teams to implement quality initiatives
Experience in root cause analysis and corrective action
I have a Bachelor's degree in Mechanical Engineering from XYZ University.
Bachelor's degree in Mechanical Engineering
Graduated from XYZ University
Specialized in quality control and assurance
I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.
posted on 7 Sep 2022
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.
Production refers to the process of creating goods or services using resources and labor.
Production involves transforming raw materials into finished products or providing services to customers.
It includes activities such as manufacturing, assembly, packaging, and distribution.
Examples of production include car manufacturing, food processing, and software development.
Efficient production is essential for businesses to
posted on 11 Feb 2021
I applied via Campus Placement and was interviewed before Feb 2020. There were 5 interview rounds.
Cube mould size is a standard size used for testing the compressive strength of concrete.
Cube moulds are typically made of steel or cast iron.
The standard size for cube moulds is 150mm x 150mm x 150mm.
Other sizes such as 100mm x 100mm x 100mm and 200mm x 200mm x 200mm are also used.
The moulds are filled with concrete and left to cure before being tested for compressive strength.
Cube moulds are used to ensure that the c...
To calculate the weight of an 8mm diameter steel rod, use the formula: weight = volume x density.
Calculate the volume of the rod using the formula: volume = π x (diameter/2)^2 x length
Find the density of steel, which is typically around 7850 kg/m^3
Multiply the volume by the density to get the weight of the rod
based on 2 interviews
Interview experience
Site Engineer
205
salaries
| ₹2.4 L/yr - ₹7 L/yr |
Civil Site Engineer
185
salaries
| ₹2.3 L/yr - ₹8.8 L/yr |
Quantity Surveyor
54
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Senior Planning Engineer
53
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Mechanical Engineer
49
salaries
| ₹2 L/yr - ₹6.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA