Upload Button Icon Add office photos

Filter interviews by

Hindustan Construction Company Civil Site Engineer & Site Incharge Interview Questions and Answers

Updated 7 Sep 2023

Hindustan Construction Company Civil Site Engineer & Site Incharge Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. As a Civil engineer construction work ??
  • Ans. Drawing perpose perpor work , leveling, billing, estimate
  • Answered Anonymously
  • Q2. Civil construction management process?
  • Ans. 

    Civil construction management process involves planning, organizing, and controlling construction activities to ensure successful project completion.

    • Planning phase includes site investigation, feasibility study, and design development.

    • Organizing phase involves procurement of materials, equipment, and labor.

    • Controlling phase includes monitoring progress, quality control, and cost management.

    • Regular communication and coo...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Hindustan Construction Company Civil Site Engineer & Site Incharge interview:
  • Civil site construction
Interview preparation tips for other job seekers - I I am gaining civil engineering knowlege in construction civil company
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

Side planing ,and labour handling
Drowning reading ,

Round 3 - Group Discussion 

Group discussion ,planing work next day
And side working discussion

Interview Preparation Tips

Topics to prepare for Hindustan Construction Company Civil Site Engineer & Site Incharge interview:
  • Dran construction
  • Driling ,slope protection
  • SDA groutin
  • Shotkrit
Interview preparation tips for other job seekers - Job is nessary to life settle

Civil Site Engineer & Site Incharge Interview Questions Asked at Other Companies

Q1. steel lenght which will be not considered as wastage?
Q2. How many used minimum bar in slab as a CPWD specification
Q3. How many Curring period time in brick work wall for admixture mor ... read more
Q4. how much cubicfeet concrete will be in cube ?
Q5. what is nominal mix concrete and mix design?

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Coding Test 

Bar bending schedule , RL , BSS , HI, TBM, water rasiw, , BS

Round 3 - Technical 

(7 Questions)

  • Q1. Thickness of DPC= 2.5cm or 1 inch
  • Ans. 

    The thickness of DPC can be either 2.5cm or 1 inch.

    • DPC stands for Damp Proof Course, which is a layer of waterproof material used in construction to prevent moisture from rising through the walls or floors.

    • The thickness of DPC is typically determined based on the specific requirements of the project and local building codes.

    • In some regions, the thickness of DPC is specified in centimeters (e.g., 2.5cm), while in others...

  • Answered by AI
  • Q2. Height of window =2.1m
  • Ans. 

    The height of the window is 2.1m.

    • The height of the window is a fixed measurement.

    • It is important to consider the height of the window when designing the building.

    • The height of the window may vary depending on the specific requirements of the project.

  • Answered by AI
  • Q3. Height of building= 3.15m
  • Ans. 

    The height of the building is 3.15m.

    • The height of the building is a crucial measurement in civil engineering.

    • It is important to accurately measure and document the height of a building for various purposes such as construction planning, structural analysis, and code compliance.

    • In this case, the height of the building is specified as 3.15m.

    • This measurement can be used to determine the number of floors, calculate the vol...

  • Answered by AI
  • Q4. Lintel thickness -15cm( inch)
  • Ans. 

    The lintel thickness is 15cm (inch).

    • The lintel thickness is the measurement of the horizontal beam that supports the load above an opening, such as a door or window.

    • A lintel with a thickness of 15cm (inch) is considered standard in many construction projects.

    • The thickness of the lintel is determined based on the span of the opening and the load it needs to support.

    • Lintels can be made of various materials, including con...

  • Answered by AI
  • Q5. Weight of one bag cement =50 kg
  • Ans. 

    The weight of one bag of cement is 50 kg.

    • The weight of cement bags is standardized at 50 kg.

    • This weight is important for calculating the quantity of cement required for a project.

    • For example, if a project requires 100 bags of cement, the total weight would be 5000 kg.

  • Answered by AI
  • Q6. Site Engineer , civil work, Building construction, site supervisor I am sayan Choudhury from West Bengal Bolpur santiniketan institute of polytechnic college Civil engineering department diploma experienc...
  • Ans. 

    RCC ,water ratio , bar bending schedule

  • Answered Anonymously
  • Q7. Minimum thickness wall -400 mm
  • Ans. 

    The minimum thickness for a wall is typically 400 mm.

    • The minimum thickness of a wall is determined by structural requirements and building codes.

    • Thicker walls provide better structural stability and can support heavier loads.

    • The type of wall construction and materials used also influence the minimum thickness.

    • For example, a load-bearing concrete wall may require a minimum thickness of 400 mm to ensure structural integr...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Site Engineer & Site Incharge interview:
  • Capital Goods
  • Hi,
  • BS, site Engineer
  • Building Construction
  • Metro station project
Interview preparation tips for other job seekers - project, site supervisor , and leveling Survey Topic - BS, IS, FS, RL, HI, BM, TBM , value with rise and fall method
Survey
Instruments Name- Auto Leveling
interdisciplinary knowledge.learn practical application of theoretical knowledge on any subject and enables a deep learning experience.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of concrete cube
  • Ans. 

    The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.

    • Standard size for concrete cube is 150mm x 150mm x 150mm

    • Used for testing the compressive strength of concrete

    • Other sizes may be used for specific projects or requirements

  • Answered by AI
  • Q2. 150mm*150mm*150mm
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Naukri.com

Round 1 - HR 

(2 Questions)

  • Q1. Foundation footing how much cover required
  • Ans. 

    Foundation footing requires a minimum cover of 50mm to 75mm for reinforcement protection.

    • Minimum cover of 50mm to 75mm is required for foundation footing to protect the reinforcement from corrosion and provide adequate strength.

    • The cover requirement may vary based on the type of soil, environmental conditions, and structural design.

    • Proper cover ensures durability and stability of the foundation.

    • In some cases, additiona...

  • Answered by AI
  • Q2. Shuttering column up to FFL how much cover required
  • Ans. 

    The cover required for shuttering column up to FFL depends on the type of concrete being used and the environmental conditions.

    • Cover required for shuttering column up to FFL typically ranges from 25mm to 50mm.

    • Factors such as type of concrete mix, exposure conditions, and structural requirements can influence the required cover.

    • For example, in harsh environmental conditions or high-strength concrete, a higher cover may ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - N/A
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Slop of stairs case
  • Ans. 

    The slope of stairs refers to the angle at which the stairs are inclined, affecting safety and accessibility.

    • The slope of stairs is typically between 30-35 degrees for comfortable and safe use.

    • Building codes may dictate specific slope requirements for stairs to ensure safety and accessibility.

    • The slope of stairs can be calculated using trigonometry, with the rise and run of the stairs determining the angle.

    • A steep slop...

  • Answered by AI
  • Q2. Why covering provided in steel reinforcement?
  • Ans. 

    Covering is provided in steel reinforcement to protect it from corrosion and to ensure proper bond with concrete.

    • Covering protects steel reinforcement from corrosion caused by exposure to moisture and chemicals in the environment.

    • It helps in maintaining the bond between steel reinforcement and concrete, ensuring structural integrity.

    • Proper covering thickness is important to prevent rusting of steel bars and maintain du...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is the leaping zone of steel rainforcement ?
  • Ans. 

    The leaping zone of steel reinforcement refers to the area where the steel bars are not provided in a concrete member.

    • The leaping zone is typically found in beams and slabs where the steel reinforcement is not required to be continuous.

    • It is important to ensure that the leaping zone does not compromise the structural integrity of the member.

    • Proper detailing and design considerations are necessary to determine the exten...

  • Answered by AI
  • Q2. How can identify the site uses materials?
  • Ans. 

    Site uses materials can be identified through visual inspection, testing, and documentation.

    • Conduct visual inspection of materials on site to identify their type and quality

    • Perform tests on materials such as soil, concrete, and asphalt to determine their properties

    • Review documentation such as material specifications, delivery receipts, and quality control reports

    • Consult with suppliers and manufacturers to verify the au

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Draw the section of stairs case with reinforcement.
  • Ans. 

    A section of stairs case with reinforcement is a structural drawing showing the details of the stairs and the reinforcement bars used for strength.

    • Include dimensions and materials used for the stairs and reinforcement bars

    • Show the arrangement of reinforcement bars in the section view

    • Label the different components of the stairs case for clarity

  • Answered by AI
  • Q2. What is the component of maivan technology
  • Ans. 

    Maivan technology consists of various components including sensors, software, and data analytics for monitoring and managing civil infrastructure.

    • Sensors are used to collect data on various parameters such as temperature, humidity, and structural integrity.

    • Software is utilized to process the data collected by sensors and provide real-time monitoring and analysis.

    • Data analytics tools are employed to identify patterns, t...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Why joining in this group
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About last company works
  • Q2. About steel and concrete
  • Q3. Handling labours and supervisors
Round 3 - HR 

(2 Questions)

  • Q1. About last paid salary
  • Q2. 1)Marital status 2) accomodation
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical side question
  • Q2. Civil engineering jobs in
Round 3 - Technical 

(2 Questions)

  • Q1. Civil structure
  • Q2. Civil engineering construction

Interview Preparation Tips

Topics to prepare for H.G. Infra Engineering Civil Site Engineer interview:
  • Civil Construction
  • Steel Structures
  • Sarvey
  • Building Construction
Interview preparation tips for other job seekers - Please company in job

I applied via Referral and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. About the site in PEB project
  • Q2. I will check the column alignment
  • Q3. Nut ,bolt missing and if the hole miss matching means we need arrange the hole in broch cutter machine
  • Q4. I had secured all PEB document
  • Q5. I will all over in the site

Interview Preparation Tips

Topics to prepare for Pennar Industries Site Incharge interview:
  • About the site
Interview preparation tips for other job seekers - The salary is credited in the month off 10 to 15 days

Hindustan Construction Company Interview FAQs

How many rounds are there in Hindustan Construction Company Civil Site Engineer & Site Incharge interview?
Hindustan Construction Company interview process usually has 2-3 rounds. The most common rounds in the Hindustan Construction Company interview process are Resume Shortlist, Technical and Aptitude Test.

Tell us how to improve this page.

Hindustan Construction Company Civil Site Engineer & Site Incharge Interview Process

based on 2 interviews

Interview experience

3.5
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 733 Interviews
Tata Projects Interview Questions
4.2
 • 422 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
View all
Civil Site Engineer
221 salaries
unlock blur

₹2.2 L/yr - ₹8.6 L/yr

Site Engineer
206 salaries
unlock blur

₹2.4 L/yr - ₹7 L/yr

Quantity Surveyor
54 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Senior Planning Engineer
53 salaries
unlock blur

₹5 L/yr - ₹8.6 L/yr

Civil Engineer
48 salaries
unlock blur

₹2.4 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Hindustan Construction Company with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview