Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Larsen & Toubro Limited Team. If you also belong to the team, you can get access from here

Larsen & Toubro Limited Verified Tick

Compare button icon Compare button icon Compare
4.0

based on 18k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Larsen & Toubro Limited Site Engineer Interview Questions, Process, and Tips

Updated 29 Nov 2024

Top Larsen & Toubro Limited Site Engineer Interview Questions and Answers

View all 28 questions

Larsen & Toubro Limited Site Engineer Interview Experiences

26 interviews found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 10 Nov 2024

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Columns staircase foundation
  • Q2. Beam one way slab ,two way slav
  • Ans. 

    One way slab is supported on two opposite sides, while two way slab is supported on all four sides.

    • One way slab is designed to carry loads predominantly in one direction.

    • Two way slab is designed to carry loads in both directions.

    • One way slab is more economical for smaller spans, while two way slab is more suitable for larger spans.

    • Examples: One way slab - balcony, corridor. Two way slab - office building, parking garag

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Site related experience bracket wall
  • Q2. Survey auto level total station
Round 3 - One-on-one 

(2 Questions)

  • Q1. Bbs, drawing reading
  • Q2. Stairs drawing reading
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Diploma in mechanical engineering thermal engineering or manufacturing

Round 2 - Technical 

(7 Questions)

  • Q1. Thermodynamics law
  • Ans. 1st Law of Thermodynamics - Energy cannot be created or destroyed. 2nd Law of Thermodynamics - For a spontaneous process, the entropy of the universe increases. 3rd Law of Thermodynamics - A perfect crystal at zero Kelvin has zero entropy.
  • Answered Anonymously
  • Q2. Gear and type four stock and two stock
  • Ans. The main difference between a 4-stroke engine and a 2-stroke engine is that a 4-stroke engine goes through four stages, or two complete revolutions, to complete one power stroke, while a 2-stroke engine goes through 2 stages, or one complete revolution, to complete one power stroke.
  • Answered Anonymously
  • Q3. Stress and strain or strain and stress graph
  • Ans. The Stress-Strain curve is a type of graph plotted between “stress and strain”. This graph explains the relationship between “stress and strain” of different materials when tensile stress is applied to them. This curve is plotted on the basis of an experimental result.
  • Answered Anonymously
  • Q4. Types of mechanical properties
  • Ans. 

    Mechanical properties refer to the behavior of materials under applied forces.

    • Strength - ability to withstand applied stress without failure

    • Hardness - resistance to deformation or scratching

    • Elasticity - ability to return to original shape after deformation

    • Ductility - ability to deform without breaking

    • Toughness - ability to absorb energy before fracturing

  • Answered by AI
  • Q5. Types of heat treatment
  • Ans. 

    Heat treatment is a process used to alter the physical and sometimes chemical properties of a material through heating and cooling.

    • Annealing: heating a material to a specific temperature and then slowly cooling it to relieve internal stresses and increase ductility

    • Quenching: rapid cooling of a material to increase hardness

    • Tempering: heating a material to a specific temperature and then cooling it to improve toughness

    • No...

  • Answered by AI
  • Q6. Heat transfer and types
  • Ans. 

    Heat transfer is the movement of heat from one object to another due to a temperature difference.

    • There are three main types of heat transfer: conduction, convection, and radiation.

    • Conduction is the transfer of heat through a material without any movement of the material itself.

    • An example of conduction is when a metal spoon in a hot cup of tea becomes hot.

    • Convection is the transfer of heat through the movement of fluids...

  • Answered by AI
  • Q7. Types of lathe machine
  • Ans. 

    Types of lathe machines include engine lathe, turret lathe, and center lathe.

    • Engine lathe is the most common type used for general purpose turning.

    • Turret lathe has a turret tool post for quick tool changes.

    • Center lathe is used for precision work and has a tailstock for support.

    • Other types include automatic lathe, CNC lathe, and vertical lathe.

  • Answered by AI

Site Engineer Interview Questions Asked at Other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimensio ... read more
Q2. What a term of Rolling margin on a steel?
Q3. Which type of pipe Line and it's standards following
Q4. design? 1.what is ASD in steel design? 2.what is special consider ... read more
Q5. What is the lapping zone of beam rebar at top and bottom...? Why ... read more

Site Engineer Interview Questions & Answers

user image Chanakya Chanakya

posted on 29 Nov 2024

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Emergency EHS 

(1 Question)

  • Q1. How do you guys handle emergency situations?
  • Ans. 

    We have a designated emergency response team trained to handle various emergency situations.

    • Designated emergency response team trained for various emergency scenarios

    • Regular emergency drills and training sessions to ensure preparedness

    • Established communication protocols to quickly coordinate response efforts

    • Access to emergency supplies and equipment for immediate assistance

    • Collaboration with local authorities and emerg

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. Different types of mix design ?
  • Ans. 

    Different types of mix design include nominal mix, standard mix, and design mix.

    • Nominal mix design involves using standard ratios without testing.

    • Standard mix design follows specific guidelines and proportions.

    • Design mix design is customized based on specific project requirements.

    • Examples: M20, M30, M40 mixes.

  • Answered by AI
  • Q2. Overlaping steel?
  • Ans. 

    Overlapping steel refers to the practice of placing steel bars on top of each other to increase strength and stability in construction.

    • Overlapping steel bars helps distribute loads evenly and prevent structural failure.

    • Properly overlapping steel bars is crucial for ensuring the structural integrity of a building.

    • Commonly used in reinforced concrete structures such as beams, columns, and slabs.

    • Overlap length and spacing...

  • Answered by AI
  • Q3. Soil Compaction test
  • Ans. Load bearing capacity of soli for any structural work test its density
  • Answered Anonymously
  • Q4. Ratio of mortar for plaster work
  • Ans. 

    The ratio of mortar for plaster work is typically 1:3 to 1:6, depending on the type of surface and desired finish.

    • The most common ratio for plaster work is 1 part cement to 3 parts sand.

    • For a smoother finish, the ratio can be adjusted to 1 part cement to 4 or 5 parts sand.

    • In some cases, a 1:6 ratio (1 part cement to 6 parts sand) may be used for rough surfaces or base coats.

    • Water should be added gradually to achieve th

  • Answered by AI
  • Q5. Quantity of brick in 50 squre meter
  • Ans. 

    The quantity of bricks in 50 square meters depends on the size of the bricks and the thickness of the wall being built.

    • Calculate the area of the wall in square meters

    • Determine the size of the bricks being used (e.g. standard size is 0.22m x 0.1m x 0.07m)

    • Calculate the number of bricks needed by dividing the wall area by the area of one brick

  • Answered by AI
  • Q6. Bar bending schedule

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Site Engineer interview:
  • Theory of sturucture
  • Construction Management
Interview preparation tips for other job seekers - Take Experience with full knowledge of own work

Larsen & Toubro Limited interview questions for designations

 Civil Site Engineer

 (32)

 Site Engineer Mechanical

 (3)

 Site Execution Engineer

 (1)

 Civil Site & Billing Engineer

 (1)

 Senior Civil Site Engineer

 (1)

 Site Supervisor

 (7)

 Site Incharge

 (1)

 Civil Site Supervisor

 (3)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 12 Oct 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is density of steel
  • Ans. 

    Density of steel is approximately 7.85 g/cm^3

    • The density of steel is around 7.85 grams per cubic centimeter

    • Density can vary slightly depending on the specific type of steel

    • Steel is a commonly used material in construction and manufacturing due to its strength and durability

  • Answered by AI
  • Q2. What is defined M20
  • Ans. 

    M20 is a mix of concrete with a compressive strength of 20 megapascals.

    • M20 refers to the mix of concrete with a compressive strength of 20 megapascals.

    • It is commonly used in construction for residential buildings, pavements, and small-scale projects.

    • The mix ratio for M20 concrete is 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate.

  • Answered by AI
  • Q3. What is the weight of D32 steel baar
  • Ans. 

    The weight of D32 steel bar is approximately 7.65 kg per meter.

    • The weight of D32 steel bar is calculated based on its dimensions and density

    • The density of steel is around 7.85 g/cm^3

    • To calculate the weight, you need to know the length of the bar

    • For example, a 1 meter long D32 steel bar would weigh approximately 7.65 kg

  • Answered by AI
  • Q4. What is density of cement Ans-1440kg/m3
  • Ans. 

    The density of cement is 1440kg/m3.

    • Density of cement is a measure of its mass per unit volume.

    • It is commonly expressed in kilograms per cubic meter (kg/m3).

    • The density of cement can vary slightly depending on the type and brand.

    • For example, Portland cement typically has a density of around 1506kg/m3.

  • Answered by AI
  • Q5. What is ratio of M25 grade concrete? Ans-1:1:2
  • Ans. 

    The ratio of M25 grade concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • M25 grade concrete has a ratio of 1:1:2 for cement, sand, and aggregate respectively

    • This ratio indicates the proportion of each ingredient in the concrete mix

    • For example, for every 1 bag of cement, 1 cubic foot of sand and 2 cubic feet of aggregate are used

  • Answered by AI

Get interview-ready with Top Larsen & Toubro Limited Interview Questions

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 26 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is stater ?
  • Ans. 

    A stater is a unit of weight used in ancient Greece for coins.

    • Staters were typically made of silver or gold.

    • The most famous stater is the Athenian silver tetradrachm, featuring the owl of Athena.

    • Staters were used as a form of currency in ancient Greek city-states.

  • Answered by AI
  • Q2. How calculate weight of one meter steel bar formula ?
  • Ans. 

    The weight of one meter steel bar can be calculated using a specific formula.

    • The formula to calculate the weight of one meter steel bar is: Weight = (D^2/162) * L, where D is the diameter of the steel bar in mm and L is the length of the steel bar in meters.

    • To calculate the weight of one meter steel bar, you need to know the diameter of the steel bar and the density of steel (which is 7850 kg/m^3).

    • For example, if the d...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Communication is a most important for job seeker and Deep knowledge of his field branch study in Engineering.

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 15 Mar 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via campus placement at VIT Business School, Vellore and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

The duration of the aptitude test was 120 minutes (2 hrs), for 130 questions (including 100 Logical Reasoning, Verbal ability, Quantitative Ability and other 30 questions from TECHNICAL DOMAIN), Mine was Civil Background. Technical Questions were quite moderate to tough. Whereas, first 100 questions of LR, VA, Quant was quite easy and short.

Round 2 - Technical 

(1 Question)

  • Q1. Technical interview mostly revolved around internships and College Projects that we did. Very few Structural design questions and 1 or 2 from soil mech.
Round 3 - HR 

(2 Questions)

  • Q1. Based mainly on you CGPA, If CGPA is above 9, chances are quite high for getting selected, even if interview doesn't go well. (This was my case, I had CGPA of 9.56)
  • Q2. About Family background, future plans, Why not M.Tech after Btech?

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Site Engineer interview:
  • Strength of Materials
  • Soil Mechanics
  • Transportation
  • Concrete

Site Engineer interview

user image Civil Engineer- Fieldwork Expert

posted on 17 Nov 2021

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 28 Feb 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Deptt. Interview
  • Q2. Only E&M (OHE )
  • Q3. Material & Erection knowledge
  • Q4. Adjustment and sed checking
  • Q5. Earthing & Bonding

Interview Preparation Tips

Interview preparation tips for other job seekers - Only E&M (OHE)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 11 Apr 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About nptel Mechanical engineering related questions

Larsen & Toubro Limited Interview FAQs

How many rounds are there in Larsen & Toubro Limited Site Engineer interview?
Larsen & Toubro Limited interview process usually has 2-3 rounds. The most common rounds in the Larsen & Toubro Limited interview process are Technical, Resume Shortlist and Aptitude Test.
How to prepare for Larsen & Toubro Limited Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Larsen & Toubro Limited. The most common topics and skills that interviewers at Larsen & Toubro Limited expect are Site Engineering, Execution, Site Execution, Commissioning and Project Management.
What are the top questions asked in Larsen & Toubro Limited Site Engineer interview?

Some of the top questions asked at the Larsen & Toubro Limited Site Engineer interview -

  1. Which type of pipe Line and it's standards follow...read more
  2. Technical Specification of Boom Pleacer & Lifing activitys of FBW Machine & rep...read more
  3. Defferent standards for related materia...read more
How long is the Larsen & Toubro Limited Site Engineer interview process?

The duration of Larsen & Toubro Limited Site Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Larsen & Toubro Limited Site Engineer Interview Process

based on 10 interviews in last 1 year

2 Interview rounds

  • Technical Round 1
  • Technical Round 2
View more
Larsen & Toubro Limited Site Engineer Salary
based on 644 salaries
₹1.5 L/yr - ₹8.5 L/yr
18% more than the average Site Engineer Salary in India
View more details

Larsen & Toubro Limited Site Engineer Reviews and Ratings

based on 306 reviews

4.3/5

Rating in categories

4.4

Skill development

3.9

Work-life balance

4.2

Salary

4.3

Job security

4.2

Company culture

3.9

Promotions

4.1

Work satisfaction

Explore 306 Reviews and Ratings
Assistant Manager
3.8k salaries
unlock blur

₹6.2 L/yr - ₹20.2 L/yr

Senior Engineer
3.4k salaries
unlock blur

₹4.5 L/yr - ₹15.1 L/yr

Engineer
1.3k salaries
unlock blur

₹1.6 L/yr - ₹9.1 L/yr

Assistant Construction Manager
1.2k salaries
unlock blur

₹6 L/yr - ₹16.6 L/yr

Manager
1.1k salaries
unlock blur

₹9.4 L/yr - ₹30 L/yr

Explore more salaries
Compare Larsen & Toubro Limited with

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Adani Group

3.9
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview