i
Larsen & Toubro Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Clear (1)
I applied via AmbitionBox and was interviewed in Dec 2022. There were 2 interview rounds.
Hydraulic is a system that uses liquid to transmit power. Automatic gear is a type of transmission that shifts gears automatically.
Hydraulic systems use fluids like oil or water to transmit power.
They are commonly used in heavy machinery like cranes and excavators.
Automatic gear is a type of transmission that shifts gears automatically based on the speed of the vehicle.
It is commonly found in modern cars and makes driv
I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Aug 2023. There were 2 interview rounds.
They will select directly from your college with aptitude test
What people are saying about Larsen & Toubro Limited
I applied via Referral and was interviewed in Jun 2022. There was 1 interview round.
The technical specification of a boom placer includes details about its lifting activities and repair maintenance.
Technical specification of a boom placer includes information about its capacity, reach, and lifting height.
Lifting activities of a boom placer involve the movement and placement of heavy objects or materials.
Repair maintenance of a boom placer includes regular inspections, lubrication, and replacement of w...
Yes, I have a documentation process for my work as a Site Engineer.
I maintain detailed records of all project activities, including plans, specifications, and progress reports.
I use standardized templates and forms to document site inspections, quality control checks, and safety procedures.
I organize and file all documentation in a systematic manner for easy retrieval and reference.
I regularly update and communicate ch...
Larsen & Toubro Limited interview questions for designations
I applied via Naukri.com and was interviewed before Jul 2022. There were 3 interview rounds.
What is the Substation ,
Why need cable trench,
How much room in substation
Substation in civil work involves the construction of buildings and structures to house electrical equipment for power distribution.
Substation civil work includes site preparation, foundation construction, building erection, and equipment installation.
Design considerations include safety, accessibility, and structural integrity.
Examples of substation civil work include transformer foundations, control buildings, and sw
The control room is a centralized location where monitoring, control, and coordination of various systems and processes take place.
Centralized location for monitoring and controlling systems
Used in industries like power plants, manufacturing plants, and transportation systems
Equipped with control panels, computers, communication systems, and monitoring devices
Allows operators to make real-time decisions and adjustments
...
Battery rooms are designated areas where batteries are stored, charged, and maintained.
Battery rooms are used to store batteries for backup power systems.
They are equipped with charging stations and ventilation systems to ensure safety.
Regular maintenance and inspections are conducted in battery rooms to ensure optimal performance.
Battery rooms are common in industries such as telecommunications, data centers, and manu
Cable trenches are needed to protect and organize cables, prevent damage, and allow for easy maintenance and repairs.
Protects cables from physical damage and environmental factors
Organizes cables for easy identification and maintenance
Facilitates easy access for repairs and upgrades
Helps in preventing tripping hazards
Ensures compliance with safety regulations and standards
Get interview-ready with Top Larsen & Toubro Limited Interview Questions
I applied via Job Fair and was interviewed before Jan 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
Curing is the process of maintaining moisture and temperature conditions in concrete for a specific period to ensure proper hydration and strength development.
Curing helps in preventing moisture loss from the concrete, which is essential for proper hydration.
It helps in maintaining the desired temperature for the chemical reactions to occur.
Curing enhances the strength, durability, and overall performance of the concre...
I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.
The type of pipe line and its standards depend on the specific project requirements and industry standards.
The type of pipe line can vary based on the material being transported, such as water, gas, oil, etc.
Common types of pipe lines include water supply lines, sewer lines, natural gas lines, oil pipelines, etc.
The standards followed for pipe lines depend on the country, industry, and specific project requirements.
Som...
Different standards exist for related materials in construction.
Standards ensure quality and safety of materials used in construction.
Examples of standards include ASTM, ISO, and EN.
Standards may vary by country or region.
It is important for site engineers to be familiar with relevant standards and ensure compliance.
I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.
Initial setting time of cement and high percentage required in sand are two different aspects of construction materials.
Initial setting time of cement refers to the time taken by cement to set and harden after mixing with water.
High percentage of sand is required in certain types of construction, such as concrete blocks and paving stones.
The percentage of sand required depends on the type of construction and the desire...
High percentage of sand is required for better compaction and stability of soil.
Sand helps in filling the voids between soil particles, increasing the density and reducing settlement.
A high percentage of sand also improves drainage and reduces the risk of soil erosion.
The ideal percentage of sand varies depending on the type of soil and the intended use of the construction project.
For example, for road construction, a ...
The duration of Larsen & Toubro Limited Site Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 31 interviews
3 Interview rounds
based on 312 reviews
Rating in categories
Assistant Manager
4.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
3.4k
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra