Filter interviews by
posted on 17 Nov 2024
Doubling of railway line involves constructing a parallel track to increase capacity and improve efficiency.
Doubling of railway line is done to increase capacity and improve efficiency of the railway network.
It involves constructing a parallel track next to the existing track.
This allows for more trains to run simultaneously without causing delays.
Examples of successful doubling projects include the Western Dedicated F...
Construction of a colony planning with sanitation involves designing and building residential areas with proper waste management systems.
Ensure proper layout and zoning for residential, commercial, and green spaces
Implement sewage and drainage systems to manage waste effectively
Include green spaces and parks for recreational activities
Provide access to clean water sources for residents
Consider sustainable construction
I applied via AmbitionBox and was interviewed in Jul 2024. There were 2 interview rounds.
Math ability, reasoning
posted on 10 Nov 2024
I applied via Newspaper Ad and was interviewed in Feb 2024. There was 1 interview round.
A transition curve is a curve that connects a straight line with a circular curve in a smooth and gradual manner.
Transition curves are used in civil engineering and transportation design to ensure smooth transitions between different types of curves.
They are typically used in road design, railway tracks, and pipelines.
The purpose of a transition curve is to reduce the abrupt change in curvature, which helps in improvin...
Mean area method is a technique used in surveying to calculate the average area of irregular plots by dividing them into triangles or trapezoids.
Mean area method involves dividing an irregular plot into smaller, simpler shapes like triangles or trapezoids.
The area of each shape is calculated using appropriate formulas.
The average area of the plot is then calculated by taking the mean of all the individual areas.
This me...
National Highways Authority of India interview questions for popular designations
I have completed a project on supply chain optimization during my college years.
Developed a simulation model to optimize inventory levels and reduce costs
Analyzed data to identify bottlenecks and inefficiencies in the supply chain
Implemented recommendations to improve overall operational efficiency
Yes, I am open to shifting my career from IT to data entry if it aligns with my career goals and interests.
I am open to exploring new opportunities and challenges in the data entry field.
I believe my skills in IT can be transferable to data entry tasks, such as attention to detail and accuracy.
I am willing to learn and adapt to the requirements of the data entry role.
I see this as a chance to broaden my skill set and g
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
I was interviewed before Mar 2023.
Flexible pavement design involves considering factors like traffic load, soil properties, and climate. Minimum CBR varies based on design parameters. 3A refers to the subgrade soil classification. CTSB design involves determining layer thickness and material properties. Minimum bitumen content in BC grade 2 is specified by relevant standards.
Flexible pavement design considers traffic load, soil properties, climate, and...
I applied via Referral and was interviewed in Sep 2022. There was 1 interview round.
Top trending discussions
The duration of National Highways Authority of India interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 15 interviews
Interview experience
based on 222 reviews
Rating in categories
Site Engineer
102
salaries
| ₹3.6 L/yr - ₹10.8 L/yr |
Accountant
65
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Computer Operator
34
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Office Assistant
27
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Civil Site Engineer
25
salaries
| ₹2 L/yr - ₹10.8 L/yr |
Indian Railways
Airports Authority of India
Oil And Natural Gas Corporation
BHEL