Filter interviews by
I appeared for an interview before Mar 2023.
Flexible pavement design involves considering factors like traffic load, soil properties, and climate. Minimum CBR varies based on design parameters. 3A refers to the subgrade soil classification. CTSB design involves determining layer thickness and material properties. Minimum bitumen content in BC grade 2 is specified by relevant standards.
Flexible pavement design considers traffic load, soil properties, climate, and...
Top trending discussions
posted on 4 Jan 2021
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 9 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
posted on 4 May 2019
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Site Engineer
110
salaries
| ₹4.8 L/yr - ₹10.8 L/yr |
Accountant
58
salaries
| ₹2.5 L/yr - ₹7 L/yr |
Computer Operator
36
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Office Assistant
27
salaries
| ₹2 L/yr - ₹4 L/yr |
Civil Site Engineer
24
salaries
| ₹1.1 L/yr - ₹10.4 L/yr |
Larsen & Toubro Limited
L&T Construction
Megha Engineering & Infrastructures
Shapoorji Pallonji Group