Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.
To prepare for further construction on top of the piles
To ensure proper load transfer to the foundation
To facilitate the installation of pile caps or beams
To adjust the pile length if necessary
There are four deductions of 90 degree angles.
A 90 degree angle is formed when two lines intersect at a right angle.
In a square, all four angles are 90 degrees.
In a rectangle, opposite angles are 90 degrees.
In a right triangle, one angle is always 90 degrees.
Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.
Static load test involves applying a constant load to a structure and measuring its response over time.
Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.
Static load test helps determine the maxi...
The number of tolerance of pile load test depends on the specific project requirements and standards.
The number of tolerance of pile load test can vary based on the project specifications and standards.
Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.
Some projects may have more stringent tolerance requirements depending on the criticality of the structure.
It is important to refer...
Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.
Range density of bentonite is typically between 17-22 lb/gal.
Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.
The range density of bentonite is important for determining its effectiveness in different applications.
Higher range density ...
Top trending discussions
posted on 6 Nov 2019
I applied via Recruitment Consultant and was interviewed in May 2019. There were 5 interview rounds.
posted on 12 Nov 2024
I applied via Recruitment Consulltant
Easy questions. Take preperation for better performance
Designing a pump foundation involves considering factors like soil conditions, load requirements, and structural stability.
Evaluate soil conditions to determine bearing capacity
Calculate loads from the pump and surrounding equipment
Design foundation to distribute loads evenly and prevent settlement
Consider factors like seismic activity and environmental conditions
Use appropriate materials and construction techniques fo...
Designing pipe racks involves several steps to ensure structural integrity and functionality.
Determine the layout and location of the pipe rack based on piping requirements and site constraints
Calculate the loads and stresses on the pipe rack to ensure it can support the weight of the pipes and withstand external forces
Select appropriate materials and structural components for the pipe rack based on the design requirem...
posted on 31 Dec 2023
The procedure of laying tile and granite involves preparing the surface, applying adhesive, laying the tiles/granite, grouting, and sealing.
Prepare the surface by ensuring it is clean, level, and dry.
Apply adhesive to the surface using a trowel, ensuring even coverage.
Lay the tiles/granite starting from the center and working outwards in a pattern.
Grout the tiles/granite by filling the gaps between them with grout and ...
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There was 1 interview round.
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
I applied via Job Fair and was interviewed before Jan 2022. There were 7 interview rounds.
Hard work and pipeline roadlines work...
All machine.(bom loader.jcb.oather) old pipe line area.. new pipe line coverage
Hard work and pipeline roadlines work..
Hard work and pipeline roadlines work..
Hard work and pipeline roadlines
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
posted on 12 Oct 2020
I applied via Recruitment Consultant and was interviewed before Oct 2019. There was 1 interview round.
based on 4 reviews
Rating in categories
Assistant Manager
43
salaries
| ₹7.7 L/yr - ₹14.6 L/yr |
Senior Engineer
24
salaries
| ₹4 L/yr - ₹8.5 L/yr |
Executive Engineer
16
salaries
| ₹3.8 L/yr - ₹6.4 L/yr |
Deputy Engineer
16
salaries
| ₹4 L/yr - ₹6.1 L/yr |
Engineer
14
salaries
| ₹3.5 L/yr - ₹10.2 L/yr |
L&T Construction
Tata Projects
GMR Group
Reliance Infrastructure