I applied via Naukri.com and was interviewed in Feb 2021. There were 5 interview rounds.
The unit weight of reinforcement bar can be found by calculating the weight per unit length.
The unit weight of reinforcement bar is calculated by dividing the weight of the bar by its length.
The weight of the bar can be determined by multiplying the cross-sectional area of the bar by the density of the material.
The length of the bar is measured in meters or feet, depending on the unit system used.
The density of the mat...
Unit weights of building materials are important for quantity surveying.
Unit weight of concrete is around 2400 kg/m³
Unit weight of brick is around 1920 kg/m³
Unit weight of steel is around 7850 kg/m³
Unit weight of timber is around 500 kg/m³
Unit weight of glass is around 2500 kg/m³
Manpower productivity refers to the efficiency of workers in completing tasks within a given timeframe.
It is important to measure and track productivity to identify areas for improvement.
Factors that can affect productivity include training, equipment, and work environment.
Productivity can be improved through better planning, organization, and communication.
Examples of productivity measures include output per worker, t...
The procedure for billing involves preparing an invoice based on the work completed and submitting it to the client for payment.
Review the contract to ensure all work completed is billable
Prepare an invoice detailing the work completed and the corresponding costs
Submit the invoice to the client for payment within the agreed upon timeframe
Follow up with the client to ensure payment is received on time
Yes, bar bending schedule is calculated by determining the number, length, and shape of bars required for a reinforced concrete structure.
Calculate the total length of bars required for each size and type
Determine the number of bars required for each size and type
Calculate the shape and bending details of each bar
Prepare a detailed schedule of all the bars required for the structure
Ensure compliance with design and con
Top trending discussions
posted on 25 Jan 2022
I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.
The company is involved in [insert industry] and adheres to industry standards to ensure success and growth.
The company operates in [insert industry] and offers [insert products/services].
Industry standards are followed to ensure quality and safety in all aspects of the business.
Regular market research is conducted to stay up-to-date with industry trends and changes.
The company strives for continuous improvement and in...
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.
Temporary or permanent blinds can be used depending on the situation
Common types of blinds include spectacle blinds, paddle blinds, and bleed rings
Blinding is often used during maintenance or repair work to ensure safety
Blinding can also be used to prevent contamination during storage or transportation
Blinding can...
Before starting work in a refinery equipment, certain procedures must be followed.
Obtain a work permit
Perform a safety check of the equipment
Ensure proper personal protective equipment is worn
Verify that all valves are in the correct position
Confirm that the equipment is properly grounded
Check for any leaks or abnormal conditions
Communicate with other workers in the area
Follow all established procedures and protocols
I will follow the emergency response plan and evacuate the area immediately.
Activate the alarm system to alert others in the area
Put on personal protective equipment (PPE) including a respirator
Evacuate the area immediately and move to a safe location
Notify emergency services and follow the emergency response plan
Monitor the situation and wait for the all-clear signal before returning to the area
I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.
Start from the top and work your way down
Use appropriate tools and safety equipment
Follow proper procedures and guidelines
Ensure all bolts are properly labeled and accounted for
Inspect the gasket and replace if necessary
posted on 25 Jan 2025
Role of engineer to control disaster management
posted on 24 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There was 1 interview round.
Yes, I am preparing a method statement for the project.
Yes, I am currently working on preparing a method statement for the project.
I am in the process of outlining the steps and procedures to be followed in the project.
The method statement will include details on quality control measures, testing procedures, and documentation requirements.
Yes, I am able to prepare a PQP (Product Quality Plan).
I have experience in creating detailed PQPs outlining quality control processes and procedures.
I ensure that the PQP meets all relevant industry standards and regulations.
I collaborate with cross-functional teams to gather input and ensure alignment on quality goals.
I regularly review and update the PQP to reflect any changes in processes or requirements.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
Software or tool test
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
posted on 3 May 2023
Assistant Manager
45
salaries
| ₹7.7 L/yr - ₹14.6 L/yr |
Senior Engineer
27
salaries
| ₹3.6 L/yr - ₹9.6 L/yr |
Deputy Engineer
17
salaries
| ₹4 L/yr - ₹6.1 L/yr |
Executive Engineer
16
salaries
| ₹3.8 L/yr - ₹6.4 L/yr |
Safety Officer
15
salaries
| ₹3 L/yr - ₹5 L/yr |
Nasser S. Al Hajri Corporation
Saudi Binladin Group
Leighton Contractors
Eversendai