Leighton Contractors Civil Foreman Interview Questions and Answers

Updated 31 Dec 2023

Leighton Contractors Civil Foreman Interview Experiences

1 interview found

Civil Foreman Interview Questions & Answers

user image Romson joseph

posted on 31 Dec 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Procedure of laying tile and granite
  • Ans. 

    The procedure of laying tile and granite involves preparing the surface, applying adhesive, laying the tiles/granite, grouting, and sealing.

    • Prepare the surface by ensuring it is clean, level, and dry.

    • Apply adhesive to the surface using a trowel, ensuring even coverage.

    • Lay the tiles/granite starting from the center and working outwards in a pattern.

    • Grout the tiles/granite by filling the gaps between them with grout and ...

  • Answered by AI

Interview questions from similar companies

I was interviewed in May 2018.

Interview Questionnaire 

7 Questions

  • Q1. Only construction line
  • Q2. Only my job
  • Q3. What type of your job
  • Ans. 

    As a Civil Foreman, my job involves overseeing construction projects, managing workers, ensuring safety regulations are followed, and coordinating with other professionals.

    • Supervising construction projects from start to finish

    • Managing and coordinating construction workers

    • Ensuring safety regulations and protocols are followed

    • Collaborating with engineers, architects, and other professionals

    • Scheduling and organizing work ...

  • Answered by AI
  • Q4. How much mm in 1"
  • Ans. 

    There are 25.4 millimeters in 1 inch.

    • 1 inch is equal to 25.4 millimeters.

    • The conversion factor from inches to millimeters is 25.4.

    • To convert inches to millimeters, multiply the number of inches by 25.4.

    • For example, 2 inches is equal to 50.8 millimeters (2 x 25.4).

  • Answered by AI
  • Q5. How much mm in 1mtr
  • Ans. 

    There are 1000 millimeters in 1 meter.

    • 1 meter is equal to 1000 millimeters.

    • The conversion factor from meters to millimeters is 1000.

    • To convert meters to millimeters, multiply the length in meters by 1000.

  • Answered by AI
  • Q6. Construction line
  • Q7. Technical field

Interview Preparation Tips

Round: Resume Shortlist
Experience: Civil foreman

General Tips: Good
Duration: 1-4 weeks

I was interviewed before Feb 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

12th

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil formen ho m mari ko job ki jarurt h

I applied via Approached by company and was interviewed before Jan 2021. There were 7 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. What are your salary expected
Round 3 - Group Discussion 

Before work with him

Round 4 - HR 

(2 Questions)

  • Q1. Share details of your previous job.
  • Q2. Power project complete
Round 5 - HR 

(3 Questions)

  • Q1. Tell me about yourself.
  • Q2. Manoj roy civil foreman
  • Q3. Before work with us?
Round 6 - Technical 

(3 Questions)

  • Q1. How many labour you control?
  • Ans. 

    I currently supervise a team of 15 skilled and unskilled labourers.

    • I am responsible for managing the work of 15 labourers.

    • I ensure that they are following safety protocols and completing tasks on time.

    • I assign tasks to each labourer based on their skills and experience.

    • I provide training and guidance to new labourers.

    • I maintain a positive and productive work environment.

    • Examples: I have supervised teams of up to 50 lab...

  • Answered by AI
  • Q2. Me minimum 100 labour
  • Q3. Very good thanks you
Round 7 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. What about your site work

Interview Preparation Tips

Interview preparation tips for other job seekers - I will give best my knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(7 Questions)

  • Q1. Quality and material control
  • Q2. Work Productivity
  • Q3. Rre_productivity
  • Q4. Post product activity
  • Q5. Good knowledge and good behaviour
  • Q6. Pre_productivity
  • Q7. Post productivity

Interview Preparation Tips

Interview preparation tips for other job seekers - PSP PROJECT LMT
Civil Foreman
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Labournet services India Pvt Ltd
Senior Civil Trainer
Working as a Civil construction Trainer.
Certified in Assistant mason and Shuttering carpentery trade by NSDC.
Worked in multiple Skill development projects.
NAREDCO, PMKVY, BOCW and Morth.
Trained more than 500 labourers under skill development program.
L&T Construction
Civil Supervisor
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Al Jaber Group Dubai UAE
Chargehand
Worked as a chargehand with the team of 15 labour.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Al Jaber Group Dubai UAE
Civil Foreman
Worked as a Civil Formen with the team of 15 labour.
Barbending, Shuttering carpentery, Masonry and finishing works.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Monster and was interviewed before May 2020. There were 5 interview rounds.

Round 1 - Civil site activity 

(2 Questions)

  • Q1. Earth work activity
  • Q2. Road activity embt. Subgrad bes GSB , wmm DBM
Round 2 - One-on-one 

(3 Questions)

  • Q1. Concrete pouring
  • Q2. Earth work of road
  • Ans. 

    Earth work of road involves excavation, filling, compaction, and shaping of the ground to create a stable foundation for the road.

    • Excavation is the process of removing soil and rocks to create space for the road.

    • Filling involves adding suitable materials like gravel or crushed stones to level the ground.

    • Compaction is essential to ensure the filled materials are tightly packed and stable.

    • Shaping the ground involves grad...

  • Answered by AI
  • Q3. Pedestal j bolting
Round 3 - Group Discussion 

Descusosin of road concreting Massonary work

Round 4 - HR 

(2 Questions)

  • Q1. Noida international airport Noida
  • Q2. Airside Earth work activity
Round 5 - Group Discussion 

Discuss of site civil activities

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil site working experience

I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Work details and your behavior your attitude your skills your experience You speak true your skills your experience averything
  • Q2. Start is how are you, what is your skills, your experience, your behavior your all details
  • Q3. Your work experience, how you give progress fast, how you save workrs, how you manage manpower
  • Ans. 

    I prioritize efficient progress, worker safety, and effective manpower management.

    • I closely monitor project timelines and identify areas where progress can be expedited.

    • I implement strategies such as streamlining processes, optimizing resource allocation, and utilizing technology to increase productivity.

    • For example, in my previous role as a Civil Foreman, I introduced a new scheduling system that reduced project compl...

  • Answered by AI
  • Q4. How you work experience, you speak true sir I'm working this company 3 years this is my sartifiket

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Civil Foreman interview:
  • Civil Construction
  • Your work experience
  • Your sartifiket
  • Your behavior
  • Your aducation
  • How to give progress
  • Drawing you know
  • How you expect salary
  • All details
Interview preparation tips for other job seekers - Don't think negative, think positive and speak averything true that sit
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Casting ke liye kya chahiye
  • Q2. Sariya ka daya kitne hote hai
  • Q3. Setring ko kaise redi karte hai
Round 2 - One-on-one 

(1 Question)

  • Q1. Igadar kya hai aur t gatar me antar
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is well foundation and tilt shift method
  • Ans. 

    Well foundation is a type of foundation used in civil engineering while tilt shift method is a photography technique.

    • Well foundation is a type of deep foundation used to support heavy structures on soft soil or water bodies.

    • It consists of a large diameter well-like structure made of concrete or steel, which is sunk into the ground or waterbed.

    • The space inside the well is then filled with concrete or stone to provide a ...

  • Answered by AI
  • Q2. What is segment lifting proseger
  • Ans. 

    Segment lifting process is a technique used in construction to lift and place precast concrete segments for bridge construction.

    • It involves the use of cranes and specialized lifting equipment.

    • The segments are lifted and placed in a predetermined sequence to form the bridge deck.

    • This process is faster and more efficient than traditional bridge construction methods.

    • Examples of projects that have used segment lifting incl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please give me chance for working with you I'm specialist for bridge project
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How to check beam reinforcement?
  • Ans. 

    Beam reinforcement can be checked by visually inspecting the placement, size, and spacing of the steel bars within the beam.

    • Visually inspect the placement of steel bars within the beam to ensure they are in the correct position as per the design drawings.

    • Check the size of the steel bars to ensure they meet the specifications outlined in the structural drawings.

    • Verify the spacing between the steel bars to ensure they ar...

  • Answered by AI
  • Q2. What is the minimum dia rebar of column?
  • Ans. 

    The minimum diameter of rebar for a column depends on the structural design and load requirements.

    • The minimum diameter of rebar for a column is typically specified in the structural drawings or design documents.

    • Common minimum diameters for column rebars range from 12mm to 25mm, depending on the size and load-bearing capacity of the column.

    • The minimum diameter of rebar is important for ensuring the structural integrity ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Cover of reinforcement of slab?
  • Ans. 

    Cover of reinforcement of slab refers to the distance between the outer surface of the concrete and the reinforcement bars.

    • The cover of reinforcement is important for protecting the reinforcement from corrosion and ensuring structural integrity.

    • The typical cover of reinforcement for slabs is around 20-30mm, but it can vary depending on the design requirements.

    • Factors such as exposure conditions, concrete quality, and l...

  • Answered by AI
  • Q2. How to calculate of concrete quantity?
  • Ans. 

    Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.

    • Calculate the volume of the area to be filled (length x width x height)

    • Determine the density of the concrete (usually around 2400 kg/m^3)

    • Multiply the volume by the density to get the total concrete quantity needed

    • Consider adding a percentage for wastage or spillage

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Type of bricks joint?
  • Ans. 

    There are various types of brick joints used in construction, such as flush joint, raked joint, weathered joint, and v-joint.

    • Flush joint is a joint where the mortar is flush with the face of the brick.

    • Raked joint is a joint where the mortar is recessed slightly from the face of the brick.

    • Weathered joint is a joint where the mortar is sloped to allow water to run off.

    • V-joint is a joint where the mortar is shaped like a

  • Answered by AI
  • Q2. Type of bricks,?
  • Ans. 

    There are various types of bricks used in construction, such as clay bricks, concrete bricks, and fire bricks.

    • Clay bricks are made from clay and are commonly used for construction.

    • Concrete bricks are made from concrete and are known for their strength and durability.

    • Fire bricks are made to withstand high temperatures and are used in fireplaces and kilns.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I know the civil work. It' s very good.

Leighton Contractors Interview FAQs

How many rounds are there in Leighton Contractors Civil Foreman interview?
Leighton Contractors interview process usually has 1 rounds. The most common rounds in the Leighton Contractors interview process are Technical.

Tell us how to improve this page.

Leighton Contractors Civil Foreman Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Leighton Contractors Civil Foreman Salary
based on 8 salaries
₹4.5 L/yr - ₹7 L/yr
31% more than the average Civil Foreman Salary in India
View more details

Leighton Contractors Civil Foreman Reviews and Ratings

based on 5 reviews

4.0/5

Rating in categories

3.9

Skill development

4.8

Work-life balance

3.8

Salary

3.9

Job security

3.9

Company culture

3.0

Promotions

3.9

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Manager
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
15 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Civil Engineer
15 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Quantity Surveyor
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Leighton Contractors with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview