Q1. How many manpower requer in 1000 sqmt. For 7 day's slab cycle. How we provide jack lapping in cuplock system...
The number of manpower required in a 1000 sqmt area for a 7-day slab cycle and how to provide jack lapping in the cuplock system.
To determine the number of manpower required, consider the efficiency and productivity of the workers.
Factors such as the complexity of the slab, experience of the workers, and availability of equipment should be taken into account.
For example, if each worker can cover 50 sqmt per day, then 1000 sqmt will require 20 workers for a 7-day cycle.
Jack la...read more
Q2. What types of materials are used in construction work, and what is the method of statement for their application?
Various materials such as concrete, steel, wood, and formwork are used in construction work, each requiring specific methods of application.
Concrete: used for foundations, slabs, and columns. Method of statement includes mixing, pouring, and curing.
Steel: used for reinforcement in concrete structures. Method of statement includes cutting, bending, and tying.
Wood: used for formwork and framing. Method of statement includes cutting, assembling, and bracing.
Formwork: used to cre...read more
Shuttering Foreman Interview Questions and Answers for Freshers
Q3. What is the slab cycle and how does it relate to turnaround time?
The slab cycle refers to the time it takes to complete the process of pouring, curing, and removing concrete slabs, which directly impacts the overall turnaround time of a construction project.
The slab cycle includes activities such as formwork preparation, concrete pouring, curing, and stripping of formwork.
Efficient coordination and scheduling of these activities can help minimize the slab cycle time.
Shortening the slab cycle can lead to faster completion of the project and...read more
Q4. How do material segregation
Material segregation is the practice of separating different types of materials to prevent contamination or damage.
Material segregation involves organizing and storing materials based on their type, size, and usage.
Use separate designated areas or containers for different materials to prevent mixing.
Labeling containers or areas can help ensure materials are stored correctly.
Regularly inspect and maintain segregation practices to ensure compliance.
Examples: storing steel bars ...read more
Q5. How do work for shuttering
I work for shuttering by overseeing the construction of formwork and ensuring it is properly installed and removed.
Coordinate with construction team to determine formwork requirements
Supervise the installation and removal of formwork
Ensure formwork is structurally sound and meets project specifications
Inspect formwork for defects and make necessary repairs
Train and supervise workers on proper formwork techniques
Shuttering Foreman Jobs
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month