Filter interviews by
I work for shuttering by overseeing the construction of formwork and ensuring it is properly installed and removed.
Coordinate with construction team to determine formwork requirements
Supervise the installation and removal of formwork
Ensure formwork is structurally sound and meets project specifications
Inspect formwork for defects and make necessary repairs
Train and supervise workers on proper formwork techniques
Material segregation is the practice of separating different types of materials to prevent contamination or damage.
Material segregation involves organizing and storing materials based on their type, size, and usage.
Use separate designated areas or containers for different materials to prevent mixing.
Labeling containers or areas can help ensure materials are stored correctly.
Regularly inspect and maintain segregation pr...
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio is an important factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete mix and the intended use.
For example, a water cement ratio of 0.45 is recommende...
Density of aggregates is the mass per unit volume of the particles.
Density is an important property of aggregates used in construction.
It is measured in kg/m³ or lb/ft³.
The density of aggregates depends on their composition, shape, and size.
For example, the density of granite aggregates is around 2.7 g/cm³.
The density of lightweight aggregates like expanded clay or shale is around 1.2 g/cm³.
The density of recycled conc...
I appeared for an interview in Feb 2017.
posted on 3 May 2017
I appeared for an interview before May 2016.
I appeared for an interview in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes, which is 2 fishes.
To make the red fishes 98%, subtract 1% (2 fishes) from 99% (198 fishes).
To find the number of fishes to be removed, divide the difference by 1% (2 fishes).
Therefore, 50 fishes have to be removed to make the red fishes 98%.
I appeared for an interview in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes to find the number of red fishes.
Subtract the number of red fishes from 200 to find the number of non-red fishes.
Calculate 2% of the total number of fishes to find the desired number of red fishes.
Subtract the desired number of red fishes from the current number of red fishes to find the number of fishes to be removed.
posted on 28 Jun 2017
I appeared for an interview in Mar 2017.
To make the red fishes 98%, 50 fishes have to be removed from the aquarium.
Calculate 1% of 200 fishes to find out how many fishes represent 1%.
Multiply the result by 2 to find out how many fishes represent 2%.
Subtract the result from 200 to find out how many fishes represent 98%.
I appeared for an interview in Jul 2017.
Yes, I am a fresher with no past working experience.
I am a recent graduate looking to gain experience in the field.
I have completed internships or projects during my studies.
I am eager to learn and grow in a professional environment.
I was responsible for conducting market research, creating social media content, and assisting with event planning.
Conducted market research to identify trends and opportunities
Created engaging social media content to increase brand awareness
Assisted in planning and executing events to promote company products/services
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Recent graduate with a degree in Computer Science
Passionate about coding and problem-solving
Strong communication and teamwork skills
Experience with programming languages such as Java, Python, and C++
I applied via Approached by Company and was interviewed in Jul 2017. There were 5 interview rounds.
based on 2 interviews
Interview experience
based on 44 reviews
Rating in categories
Civil Site Engineer
17
salaries
| ₹1.2 L/yr - ₹4.4 L/yr |
Site Engineer
11
salaries
| ₹1.6 L/yr - ₹3.8 L/yr |
Senior Engineer
9
salaries
| ₹3 L/yr - ₹7.7 L/yr |
Junior Engineer Civil
8
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Junior Engineer
5
salaries
| ₹3.4 L/yr - ₹3.6 L/yr |
Marpu Foundation
Huawei Technologies
HCL Infosystems
Z X Learning