I work for shuttering by overseeing the construction of formwork and ensuring it is properly installed and removed.
Coordinate with construction team to determine formwork requirements
Supervise the installation and removal of formwork
Ensure formwork is structurally sound and meets project specifications
Inspect formwork for defects and make necessary repairs
Train and supervise workers on proper formwork techniques
Material segregation is the practice of separating different types of materials to prevent contamination or damage.
Material segregation involves organizing and storing materials based on their type, size, and usage.
Use separate designated areas or containers for different materials to prevent mixing.
Labeling containers or areas can help ensure materials are stored correctly.
Regularly inspect and maintain segregation pr...
Top trending discussions
posted on 2 Aug 2024
I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
posted on 11 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There was 1 interview round.
based on 1 review
Rating in categories
Civil Site Engineer
20
salaries
| ₹1.2 L/yr - ₹4.4 L/yr |
Site Engineer
11
salaries
| ₹1.6 L/yr - ₹3.8 L/yr |
Junior Engineer Civil
8
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Senior Engineer
8
salaries
| ₹3 L/yr - ₹6.7 L/yr |
Accountant
5
salaries
| ₹2.4 L/yr - ₹2.7 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group