Filter interviews by
I applied via AmbitionBox and was interviewed before Aug 2022. There were 2 interview rounds.
It is very difficult test to pass
I was interviewed before Oct 2021.
Top trending discussions
To draw SFD and BMD for simply supported beam under UDL of 10KM/m, follow these steps:
Calculate the reactions at the supports
Draw the SFD by taking the upward forces as positive and starting from one end
Draw the BMD by taking the positive moment as clockwise and starting from one end
Mark the maximum values of SFD and BMD
Check the equilibrium and compatibility of the beam
I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.
Fe500 is a type of high-strength reinforcement steel used in construction.
Fe500 stands for 'Fe' meaning iron and '500' representing the minimum yield strength of the steel in megapascals (MPa).
It is commonly used in construction for its high strength and durability.
Fe500 steel bars are used in reinforced concrete structures such as buildings, bridges, and highways.
It is also known as TMT (Thermo-Mechanically Treated) s...
posted on 6 Nov 2019
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
Basic Civil Knowledge
BBS
RCC Detailing
Auto Cad
Stadpro
I applied via Company Website and was interviewed in Jul 2023. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2022. There were 3 interview rounds.
Water absorption for 1st class brick should be less than 20%.
Water absorption for 1st class brick should be less than 20%.
Excessive water absorption can lead to structural issues and decrease the durability of the brick.
Water absorption can be determined by soaking the brick in water for a specified period and measuring the weight difference before and after soaking.
I applied via Walk-in and was interviewed before Jun 2022. There were 3 interview rounds.
The 4th dimension of BIM refers to the element of time, allowing for the visualization and management of construction schedules.
4D BIM integrates scheduling information with 3D models to create a visual representation of the construction timeline.
It helps in identifying potential clashes and delays in the project schedule.
By simulating the construction process, stakeholders can better understand the sequence of activit...
The 7th dimension of BIM refers to the integration of facilities management data into the BIM model.
Facilities management data includes information about maintenance schedules, equipment specifications, and energy usage.
This dimension allows for the seamless transition of data from the construction phase to the operational phase of a building.
By incorporating facilities management data, BIM can help optimize building p...
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Design Engineer
272
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
152
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Designer
100
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Design Engineer
98
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
73
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Bechtel
Fluor Corporation
Worley