Filter interviews by
Clear (1)
I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.
BIM application in highway models involves creating a digital representation of the road and its infrastructure.
BIM can be used to design and visualize highway projects
It allows for collaboration between different stakeholders
BIM can help with clash detection and reduce errors in construction
It can also be used for maintenance and asset management
Examples include the use of BIM in the construction of the M25 motorway i
I review/check work of an originator in Civil3D Models by following a systematic approach.
I check for errors and inconsistencies in the model.
I verify that the model adheres to the project standards and specifications.
I ensure that the model is accurate and complete.
I communicate with the originator to clarify any issues or concerns.
I document any changes or revisions made to the model.
I perform a final review before s
Roundabout parameters and values vary based on urban and rural settings.
Urban roundabouts typically have smaller diameters and tighter curves than rural roundabouts.
Rural roundabouts may have larger diameters and wider curves to accommodate larger vehicles.
Speed limits, traffic volume, and pedestrian and cyclist activity also influence roundabout design.
Roundabout parameters may include lane widths, splitter island wid...
ARCADY and PICADY software require input such as road geometry, traffic flow, and vehicle characteristics.
Road geometry data such as lane widths, radii, and gradients
Traffic flow data such as traffic volume, speed, and composition
Vehicle characteristics such as dimensions, speed, and acceleration
Other inputs such as signal timings and pedestrian crossings
I am proficient in Civil3D and have extensive experience in using it for designing and drafting civil engineering projects.
Expertise in creating and editing surfaces, alignments, profiles, and corridors
Ability to generate 3D models and perform earthwork calculations
Experience in creating plan and profile sheets, cross-sections, and quantity takeoffs
Familiarity with Civil3D add-ons such as AutoTURN and Hydraflow
Proficie...
Top trending discussions
Fabrication method statement includes details on how a structure will be fabricated, while WPS (Welding Procedure Specification) outlines welding procedures.
Fabrication method statement details the step-by-step process of fabricating a structure
WPS specifies the welding procedures to be followed during fabrication
Both documents are crucial for ensuring quality and safety in the fabrication process
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Design Engineer
270
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
154
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Design Engineer
104
salaries
| ₹0 L/yr - ₹0 L/yr |
Piping Designer
100
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
73
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Bechtel
Fluor Corporation
Worley