Upload Button Icon Add office photos

Worley

Compare button icon Compare button icon Compare

Filter interviews by

Worley Lead Engineer Interview Questions and Answers

Updated 14 Aug 2024

Worley Lead Engineer Interview Experiences

2 interviews found

Lead Engineer Interview Questions & Answers

user image Umesh Gangwar

posted on 14 Aug 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Question about role and responsibilities
  • Q2. What structure Fabrication method statement , WPS etc
  • Ans. 

    Fabrication method statement includes details on how a structure will be fabricated, while WPS (Welding Procedure Specification) outlines welding procedures.

    • Fabrication method statement details the step-by-step process of fabricating a structure

    • WPS specifies the welding procedures to be followed during fabrication

    • Both documents are crucial for ensuring quality and safety in the fabrication process

  • Answered by AI

Lead Engineer Interview Questions & Answers

user image Anonymous

posted on 17 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Explain your contribution to project

Lead Engineer Interview Questions Asked at Other Companies

asked in Tata Power
Q1. What is the resistance value of tripping & closing coil of vc ... read more
asked in Tata Power
Q2. 1.What is the contact resistance of VCB.?
asked in HCLTech
Q3. Which BGP path attributes are used to manipulate the ingress traf ... read more
asked in HCL Group
Q4. Monitoring tools and what metrics we capture during or after test ... read more
Q5. Java 8 features? What is functional interface? Difference between ... read more

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Electrical engineering fundamental
  • Q2. Filed technical testing and commissioning

Interview Preparation Tips

Interview preparation tips for other job seekers - In electrical engineering fundamental Be at top of it during the interview.
Be at top of your field experience. and managing most challenging situations. Handle team

I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. All about Execution work.
  • Q2. Long answer.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be patience and effort for you.

I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About site handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be good technical knowledge

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. My past work related questions
  • Q2. Bbs, reinforcement formula
  • Q3. Concrete realated

Interview Preparation Tips

Interview preparation tips for other job seekers - Your experience is the best teacher

I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Major questions on my past work responsibilities and projects, stlc, defect life cycle, tools used, test case writing, techniques, test plan, agile methodologies

Interview Preparation Tips

Interview preparation tips for other job seekers - Web interview on Aug 2021
Got interview through recruitment consultancy from naukri

Interview Questionnaire 

1 Question

  • Q1. Explain your project thoroughly, then they will ask project related questions, core java(multi threading, collections, oops mostly), SQL,spring(basic) for java developer interview

Interview Questionnaire 

3 Questions

  • Q1. What is android architecture stack?
  • Q2. What is AIDL?
  • Ans. 

    AIDL stands for Android Interface Definition Language, used for inter-process communication in Android.

    • AIDL is used to define the interface between client and service in Android.

    • It allows communication between different processes in Android.

    • AIDL is used to pass complex data types between processes.

    • AIDL is similar to Remote Procedure Call (RPC) in other programming languages.

    • Example: AIDL is used in Android to implement...

  • Answered by AI
  • Q3. What is hash set and hash map
  • Ans. 

    Hash set and hash map are data structures used to store key-value pairs for efficient retrieval.

    • Hash set stores unique values without any specific order.

    • Hash map stores key-value pairs and allows fast retrieval of values based on keys.

    • Both use hashing to map keys to their corresponding values.

    • In Java, HashSet and HashMap are implementations of these data structures.

  • Answered by AI

Skills evaluated in this interview

Worley Interview FAQs

How many rounds are there in Worley Lead Engineer interview?
Worley interview process usually has 1 rounds. The most common rounds in the Worley interview process are Technical.

Tell us how to improve this page.

Worley Lead Engineer Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 445 Interviews
KEC International Interview Questions
4.0
 • 306 Interviews
Tata Technologies Interview Questions
3.6
 • 261 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
View all
Worley Lead Engineer Salary
based on 18 salaries
₹13.5 L/yr - ₹28 L/yr
29% more than the average Lead Engineer Salary in India
View more details

Worley Lead Engineer Reviews and Ratings

based on 2 reviews

1.9/5

Rating in categories

1.0

Skill development

2.9

Work-life balance

2.9

Salary

1.9

Job security

1.9

Company culture

1.0

Promotions

1.0

Work satisfaction

Explore 2 Reviews and Ratings
Process Engineer
343 salaries
unlock blur

₹4 L/yr - ₹16 L/yr

Deputy Manager
207 salaries
unlock blur

₹9.5 L/yr - ₹32.1 L/yr

Piping Designer
165 salaries
unlock blur

₹4.5 L/yr - ₹15.1 L/yr

Piping Design Engineer
156 salaries
unlock blur

₹6.3 L/yr - ₹23.4 L/yr

Piping Engineer
153 salaries
unlock blur

₹4.5 L/yr - ₹18 L/yr

Explore more salaries
Compare Worley with

Larsen & Toubro Limited

3.9
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview