Upload Button Icon Add office photos

Worley

Compare button icon Compare button icon Compare

Filter interviews by

Worley Deputy Manager Interview Questions and Answers

Updated 19 Oct 2024

Worley Deputy Manager Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Field related Questions
  • Q2. Experience regarding discussions
Round 2 - HR 

(2 Questions)

  • Q1. Salary Discussion, Job Location discussion.
  • Q2. Negotiation and joining discussion
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Electrical instruments interface
  • Ans. 

    Electrical instruments interface involves connecting, configuring, and troubleshooting various electrical devices for optimal performance.

    • Understanding the specifications and requirements of each electrical instrument

    • Properly connecting the instruments to power sources and other devices

    • Configuring settings and parameters to ensure accurate readings and functionality

    • Troubleshooting issues such as faulty connections or m...

  • Answered by AI

Deputy Manager Interview Questions Asked at Other Companies

asked in HDFC Bank
Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with u ... read more
Q2. How would you sale our products to your existing clients?
asked in ICICI Bank
Q3. What are the important ratios you will check to sanction a loan t ... read more
Q4. What we do for shortage of material received?
Q5. What was your major master areas?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Asked several questions about ASME code and clauses
  • Q2. Proven track record about handled equipment with critical condition
  • Ans. 

    I have a proven track record of effectively handling equipment in critical condition.

    • Successfully managed and maintained critical equipment in previous roles

    • Implemented preventive maintenance strategies to avoid critical failures

    • Trained team members on proper handling and troubleshooting of critical equipment

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Attend interview with through knowledge about your respective field

Interview questions from similar companies

I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Power Transmission & distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview for technical purpose.

I appeared for an interview before May 2020.

Interview Questionnaire 

1 Question

  • Q1. How to fix rate of 1 cum metre rcc for m10 and m20
  • Ans. 

    To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.

    • Determine the cost of materials required for 1 cum metre RCC for M10 and M20

    • Calculate the labor cost involved in the construction process

    • Consider the cost of equipment required for the construction process

    • Include overheads like transportation, insurance, and taxes

    • Compare the ra...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - technicalviru.in

I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What we do for shortage of material received?
  • Ans. 

    When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.

    • Contact the supplier to inform them about the shortage and request immediate resolution

    • Check inventory records and cross-verify with the supplier's delivery documentation

    • Investigate the cause of the shortage, such as shipping errors or miscommunication

    • Implement measures to prevent future short...

  • Answered by AI
  • Q2. Can we do correction in invoice? if ans is yes then what are the further steps?
  • Ans. 

    Yes, corrections can be made in an invoice by following certain steps.

    • The correction should be made as soon as possible to avoid any confusion.

    • The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.

    • A new invoice should be created with the correct information and a reference to the original invoice.

    • The reason for the correction should be clearly stated on the new invoice.

    • Both the origin...

  • Answered by AI
  • Q3. Various SAP T code for Issues
  • Ans. 

    Various SAP T codes for Issues

    • MB21 - Create Reservation

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

    • MB1T - Transfer Posting

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive; interviewer may cross checks your confidence through various counter question, but what is right is right it can not be wrong, if interviewer says it wrong then don't go by interviewer words, always stick with your belief and knowledge.

Skills evaluated in this interview

I applied via Campus Placement and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. General accounting and tax related questions

Interview Preparation Tips

Topics to prepare for Kalpataru Projects International Deputy Manager interview:
  • Key Accounts
Interview preparation tips for other job seekers - Be confident and lead the interviewer they will see how confident you are
Round 1 - Aptitude Test 

A little tough..

Round 2 - Technical 

(1 Question)

  • Q1. Contract Adminstration
Round 3 - HR 

(1 Question)

  • Q1. Nothing.. checking.. suitablity to location.

Interview Preparation Tips

Interview preparation tips for other job seekers - it's gone... not tooo tough...
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

Easy Interview. Basic aptitude and English questions.

Round 3 - Technical 

(2 Questions)

  • Q1. Basic questions about previous experience. And some basic technical experience.
  • Q2. Basic HR questions about location etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join! Very bad company. 1-2% increments are given.
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Types of stone cladding, fixing mechanism, types anchor bolt faster, glazing units, fire door makes, insulation specification, shutter & frame size. Knowledge of Building codes, IS standard. Tiles used in ...
  • Ans. 

    The question asks about various aspects of construction materials and building codes related to stone cladding, fixing mechanisms, anchor bolts, glazing units, fire doors, insulation specifications, shutter and frame sizes, and tiles used in hospital buildings.

    • Types of stone cladding: natural stone, engineered stone, brick veneer

    • Fixing mechanisms: adhesive, mechanical fixings, undercut anchors

    • Types of anchor bolt faste...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge of the tender documents, item description & technical specification for Civil related items.

Worley Interview FAQs

How many rounds are there in Worley Deputy Manager interview?
Worley interview process usually has 1-2 rounds. The most common rounds in the Worley interview process are One-on-one Round, Technical and HR.
What are the top questions asked in Worley Deputy Manager interview?

Some of the top questions asked at the Worley Deputy Manager interview -

  1. Proven track record about handled equipment with critical condit...read more
  2. Electrical instruments interf...read more
  3. Asked several questions about ASME code and clau...read more

Tell us how to improve this page.

Worley Deputy Manager Interview Process

based on 5 interviews

Interview experience

5
  
Excellent
View more
Worley Deputy Manager Salary
based on 203 salaries
₹9.5 L/yr - ₹32.1 L/yr
108% more than the average Deputy Manager Salary in India
View more details

Worley Deputy Manager Reviews and Ratings

based on 32 reviews

4.4/5

Rating in categories

3.8

Skill development

4.5

Work-life balance

4.0

Salary

4.0

Job security

4.4

Company culture

3.5

Promotions

4.1

Work satisfaction

Explore 32 Reviews and Ratings
Process Engineer
326 salaries
unlock blur

₹4.5 L/yr - ₹16 L/yr

Deputy Manager
203 salaries
unlock blur

₹9.5 L/yr - ₹32.1 L/yr

Piping Designer
166 salaries
unlock blur

₹4.5 L/yr - ₹15.1 L/yr

Piping Design Engineer
157 salaries
unlock blur

₹6.5 L/yr - ₹23.5 L/yr

Piping Engineer
152 salaries
unlock blur

₹4.5 L/yr - ₹18 L/yr

Explore more salaries
Compare Worley with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview