Filter interviews by
I applied via Naukri.com and was interviewed before Oct 2023. There were 2 interview rounds.
Electrical instruments interface involves connecting, configuring, and troubleshooting various electrical devices for optimal performance.
Understanding the specifications and requirements of each electrical instrument
Properly connecting the instruments to power sources and other devices
Configuring settings and parameters to ensure accurate readings and functionality
Troubleshooting issues such as faulty connections or m...
I applied via Naukri.com and was interviewed before Sep 2023. There was 1 interview round.
I have a proven track record of effectively handling equipment in critical condition.
Successfully managed and maintained critical equipment in previous roles
Implemented preventive maintenance strategies to avoid critical failures
Trained team members on proper handling and troubleshooting of critical equipment
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
posted on 16 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There was 1 interview round.
posted on 22 Apr 2022
A little tough..
posted on 3 Mar 2023
I applied via Campus Placement and was interviewed before Mar 2022. There were 3 interview rounds.
Easy Interview. Basic aptitude and English questions.
posted on 2 Jan 2024
I applied via Naukri.com and was interviewed in Jul 2023. There was 1 interview round.
The question asks about various aspects of construction materials and building codes related to stone cladding, fixing mechanisms, anchor bolts, glazing units, fire doors, insulation specifications, shutter and frame sizes, and tiles used in hospital buildings.
Types of stone cladding: natural stone, engineered stone, brick veneer
Fixing mechanisms: adhesive, mechanical fixings, undercut anchors
Types of anchor bolt faste...
based on 5 interviews
Interview experience
based on 32 reviews
Rating in categories
Process Engineer
326
salaries
| ₹4.5 L/yr - ₹16 L/yr |
Deputy Manager
203
salaries
| ₹9.5 L/yr - ₹32.1 L/yr |
Piping Designer
166
salaries
| ₹4.5 L/yr - ₹15.1 L/yr |
Piping Design Engineer
157
salaries
| ₹6.5 L/yr - ₹23.5 L/yr |
Piping Engineer
152
salaries
| ₹4.5 L/yr - ₹18 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International