Upload Button Icon Add office photos

Al Tasnim Enterprises

Compare button icon Compare button icon Compare

Filter interviews by

Al Tasnim Enterprises Civil Site Engineer Interview Questions and Answers

Updated 12 Oct 2020

Al Tasnim Enterprises Civil Site Engineer Interview Experiences

2 interviews found

Civil Site Engineer Interview Questions & Answers

user image Vignesh Vaithi

posted on 6 Nov 2019

I applied via Recruitment Consultant and was interviewed in May 2019. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical, that is what type of shuttering reinforcement works and time cycle of works, quantities of works you done....and last and
  • Q2. Importantly thay asked about safety (for me they asked safety measures in EXCAVATION)

Interview Preparation Tips

Interview preparation tips for other job seekers - Be knowledge what u worked i.e what details in your resume...
Awareness need in safety in every activity

I applied via Recruitment Consultant and was interviewed before Oct 2019. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Question ask about previous site experience.
  • Q2. Normal site questions bask about execution about R.C.C and steel

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are aware about site work you can easily cleared interview

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Why are remove the pile head.
  • Ans. 

    Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.

    • To prepare for further construction on top of the piles

    • To ensure proper load transfer to the foundation

    • To facilitate the installation of pile caps or beams

    • To adjust the pile length if necessary

  • Answered by AI
  • Q2. How many deduction of 90 degree angle.
  • Ans. 

    There are four deductions of 90 degree angles.

    • A 90 degree angle is formed when two lines intersect at a right angle.

    • In a square, all four angles are 90 degrees.

    • In a rectangle, opposite angles are 90 degrees.

    • In a right triangle, one angle is always 90 degrees.

  • Answered by AI
  • Q3. What is static load test and dynamic load test.
  • Ans. 

    Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.

    • Static load test involves applying a constant load to a structure and measuring its response over time.

    • Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.

    • Static load test helps determine the maxi...

  • Answered by AI
  • Q4. How many tolerance of pile load test.
  • Ans. 

    The number of tolerance of pile load test depends on the specific project requirements and standards.

    • The number of tolerance of pile load test can vary based on the project specifications and standards.

    • Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.

    • Some projects may have more stringent tolerance requirements depending on the criticality of the structure.

    • It is important to refer...

  • Answered by AI
  • Q5. What is rang Density of bentonite and why is this use.
  • Ans. 

    Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.

    • Range density of bentonite is typically between 17-22 lb/gal.

    • Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.

    • The range density of bentonite is important for determining its effectiveness in different applications.

    • Higher range density ...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. How did you hear about company
  • Ans. 

    Through a job posting on LinkedIn

    • Found job posting on LinkedIn

    • Researched company after seeing job posting

    • Connected with current employees on LinkedIn

    • Received referral from a friend or colleague

  • Answered by AI
  • Q2. How many experience in high rise with contractor company
  • Ans. 

    I have 8 years of experience working on high rise projects with contractor companies.

    • I have worked on multiple high rise projects ranging from 20 to 50 stories.

    • Managed structural design and construction of high rise buildings.

    • Collaborated with architects, contractors, and clients to ensure project success.

  • Answered by AI
Round 2 - Group Discussion 

Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.

SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.

TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.

Interview Preparation Tips

Interview preparation tips for other job seekers - To be prepared before attending the interview
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Questions will be asked on previous company roles and responsibilities.
  • Q2. Depends upon previous experience.
Round 2 - Technical 

(2 Questions)

  • Q1. Basics on structure and finishings
  • Q2. Questions on structure and finishings

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for what u wrote in resume.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to cad and design

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be flexible in ur approach.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Previous experience and which projects have been worked.
Round 3 - HR 

(1 Question)

  • Q1. How many years worked in one company.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be smart to ask what you want at the interview stage.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Role of engineer to control disaster management

Round 2 - HR 

(1 Question)

  • Q1. Normal qurstions
Round 3 - Technical 

(1 Question)

  • Q1. About technical skills
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2022. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Why you joined Keller?
  • Q2. Are you comfortable with any location?
  • Q3. Tell me work details?
  • Q4. Are you preparing a method statement?
  • Ans. 

    Yes, I am preparing a method statement for the project.

    • Yes, I am currently working on preparing a method statement for the project.

    • I am in the process of outlining the steps and procedures to be followed in the project.

    • The method statement will include details on quality control measures, testing procedures, and documentation requirements.

  • Answered by AI
  • Q5. Are you prepare a PQP?
  • Ans. 

    Yes, I am able to prepare a PQP (Product Quality Plan).

    • I have experience in creating detailed PQPs outlining quality control processes and procedures.

    • I ensure that the PQP meets all relevant industry standards and regulations.

    • I collaborate with cross-functional teams to gather input and ensure alignment on quality goals.

    • I regularly review and update the PQP to reflect any changes in processes or requirements.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep focus on your job, which you have everyday. Before going to interview learn about company's work.

I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What is blinding? Different types of blinds used in o&g?
  • Ans. 

    Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.

    • Temporary or permanent blinds can be used depending on the situation

    • Common types of blinds include spectacle blinds, paddle blinds, and bleed rings

    • Blinding is often used during maintenance or repair work to ensure safety

    • Blinding can also be used to prevent contamination during storage or transportation

    • Blinding can...

  • Answered by AI
  • Q2. Procedures before starting a work in a refinery equipment,
  • Ans. 

    Before starting work in a refinery equipment, certain procedures must be followed.

    • Obtain a work permit

    • Perform a safety check of the equipment

    • Ensure proper personal protective equipment is worn

    • Verify that all valves are in the correct position

    • Confirm that the equipment is properly grounded

    • Check for any leaks or abnormal conditions

    • Communicate with other workers in the area

    • Follow all established procedures and protocols

  • Answered by AI
  • Q3. What will you do if there's an H2S leak and there's no wind movement,
  • Ans. 

    I will follow the emergency response plan and evacuate the area immediately.

    • Activate the alarm system to alert others in the area

    • Put on personal protective equipment (PPE) including a respirator

    • Evacuate the area immediately and move to a safe location

    • Notify emergency services and follow the emergency response plan

    • Monitor the situation and wait for the all-clear signal before returning to the area

  • Answered by AI
  • Q4. From where you'll advice your workers to start unbloting a heat exchanger head?
  • Ans. 

    I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.

    • Start from the top and work your way down

    • Use appropriate tools and safety equipment

    • Follow proper procedures and guidelines

    • Ensure all bolts are properly labeled and accounted for

    • Inspect the gasket and replace if necessary

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, answer what you know.

Al Tasnim Enterprises Interview FAQs

What are the top questions asked in Al Tasnim Enterprises Civil Site Engineer interview?

Some of the top questions asked at the Al Tasnim Enterprises Civil Site Engineer interview -

  1. Technical, that is what type of shuttering reinforcement works and time cycle o...read more
  2. importantly thay asked about safety (for me they asked safety measures in EXCAV...read more
  3. Normal site questions bask about execution about R.C.C and st...read more

Tell us how to improve this page.

Al Tasnim Enterprises Civil Site Engineer Salary
based on 21 salaries
₹4.2 L/yr - ₹11.4 L/yr
126% more than the average Civil Site Engineer Salary in India
View more details

Al Tasnim Enterprises Civil Site Engineer Reviews and Ratings

based on 5 reviews

4.5/5

Rating in categories

4.5

Skill development

4.3

Work-life balance

4.2

Salary

4.1

Job security

4.1

Company culture

4.1

Promotions

4.2

Work satisfaction

Explore 5 Reviews and Ratings
HSE Advisor
39 salaries
unlock blur

₹6.5 L/yr - ₹14.2 L/yr

Planning Engineer
33 salaries
unlock blur

₹6 L/yr - ₹18 L/yr

Civil Site Engineer
21 salaries
unlock blur

₹4.2 L/yr - ₹11.4 L/yr

Procurement Engineer
18 salaries
unlock blur

₹4.8 L/yr - ₹12.4 L/yr

Project Engineer
17 salaries
unlock blur

₹7 L/yr - ₹25 L/yr

Explore more salaries
Compare Al Tasnim Enterprises with

Nasser S. Al Hajri Corporation

3.6
Compare

Saudi Binladin Group

4.1
Compare

Leighton Contractors

4.2
Compare

Eversendai

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview