I have 8 years of experience working on high rise projects with contractor companies.
I have worked on multiple high rise projects ranging from 20 to 50 stories.
Managed structural design and construction of high rise buildings.
Collaborated with architects, contractors, and clients to ensure project success.
Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.
SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.
TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.
I appeared for an interview before Mar 2024, where I was asked the following questions.
The cable laying process involves planning, trenching, installation, and testing for effective electrical distribution.
Planning: Assess the route and determine cable type based on load requirements.
Trenching: Excavate the ground to lay cables, ensuring proper depth and width.
Installation: Place cables in trenches, using protective conduits if necessary.
Backfilling: Cover the cables with soil, ensuring no sharp objects ...
posted on 16 Dec 2023
posted on 22 Feb 2022
I applied via Naukri.com and was interviewed in Feb 2024. There were 3 interview rounds.
Face interview when it will be there??
posted on 23 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Delay analysis methods are used to determine the causes and impacts of project delays.
There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.
Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.
CPM is a commonly used method that analyzes the project schedule...
posted on 12 Apr 2024
I applied via Approached by Company and was interviewed before Apr 2023. There were 4 interview rounds.
Demonetization, pros and cons, 5 people in the discussion. HR were friendly and make possible way to comfort the candidates.
Aptitude and technical question-mostly difficult questions.
posted on 15 Jun 2022
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
HSE Advisor
39
salaries
| ₹6.5 L/yr - ₹14.2 L/yr |
Planning Engineer
33
salaries
| ₹6 L/yr - ₹18 L/yr |
Civil Site Engineer
21
salaries
| ₹4.2 L/yr - ₹11.4 L/yr |
Procurement Engineer
18
salaries
| ₹4.8 L/yr - ₹12.4 L/yr |
Project Engineer
17
salaries
| ₹7 L/yr - ₹25 L/yr |
Nasser S. Al Hajri Corporation
Saudi Binladin Group
Leighton Contractors
Eversendai