Filter interviews by
I applied via Walk-in and was interviewed before Nov 2018. There were 3 interview rounds.
The prime necessity in the subject position of a Project Manager is effective communication.
Effective communication is crucial for successful project management
It ensures clear understanding of project goals, requirements, and expectations
Communication helps in building strong relationships with stakeholders
It facilitates collaboration and coordination among team members
Good communication reduces misunderstandings and ...
To manage the team effectively, establish clear communication, set expectations, provide necessary resources, and promote a positive work environment.
Establish open and transparent communication channels
Set clear expectations and goals
Provide necessary resources and support
Promote teamwork and collaboration
Recognize and reward achievements
Ensure safety protocols are followed
Regularly monitor progress and provide feedba...
Top trending discussions
posted on 9 Oct 2020
posted on 27 Feb 2024
posted on 25 Jan 2022
I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.
The company is involved in [insert industry] and adheres to industry standards to ensure success and growth.
The company operates in [insert industry] and offers [insert products/services].
Industry standards are followed to ensure quality and safety in all aspects of the business.
Regular market research is conducted to stay up-to-date with industry trends and changes.
The company strives for continuous improvement and in...
posted on 17 Jul 2024
Questions on resource management
Senarios about work and attitue
posted on 15 Jun 2022
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 12 Apr 2024
I applied via Approached by Company and was interviewed before Apr 2023. There were 4 interview rounds.
Demonetization, pros and cons, 5 people in the discussion. HR were friendly and make possible way to comfort the candidates.
Aptitude and technical question-mostly difficult questions.
Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.
To prepare for further construction on top of the piles
To ensure proper load transfer to the foundation
To facilitate the installation of pile caps or beams
To adjust the pile length if necessary
There are four deductions of 90 degree angles.
A 90 degree angle is formed when two lines intersect at a right angle.
In a square, all four angles are 90 degrees.
In a rectangle, opposite angles are 90 degrees.
In a right triangle, one angle is always 90 degrees.
Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.
Static load test involves applying a constant load to a structure and measuring its response over time.
Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.
Static load test helps determine the maxi...
The number of tolerance of pile load test depends on the specific project requirements and standards.
The number of tolerance of pile load test can vary based on the project specifications and standards.
Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.
Some projects may have more stringent tolerance requirements depending on the criticality of the structure.
It is important to refer...
Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.
Range density of bentonite is typically between 17-22 lb/gal.
Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.
The range density of bentonite is important for determining its effectiveness in different applications.
Higher range density ...
posted on 23 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Delay analysis methods are used to determine the causes and impacts of project delays.
There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.
Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.
CPM is a commonly used method that analyzes the project schedule...
based on 7 reviews
Rating in categories
HSE Advisor
39
salaries
| ₹6.5 L/yr - ₹14.2 L/yr |
Planning Engineer
38
salaries
| ₹6 L/yr - ₹23.2 L/yr |
Civil Site Engineer
21
salaries
| ₹4.2 L/yr - ₹11.4 L/yr |
Procurement Engineer
18
salaries
| ₹4.8 L/yr - ₹12.4 L/yr |
Project Engineer
17
salaries
| ₹7 L/yr - ₹25 L/yr |
Nasser S. Al Hajri Corporation
Saudi Binladin Group
Leighton Contractors
Eversendai