Archirodon Quality Control and Civil Supervisor Interview Questions and Answers

Updated 29 Aug 2022

Archirodon Quality Control and Civil Supervisor Interview Experiences

1 interview found

Round 1 - One-on-one 

(1 Question)

  • Q1. Technical department
Round 2 - Technical 

(1 Question)

  • Q1. I Mohammed tajuddin have Diploma Civil engineer with Second Class in May 1997 and having experience in Roads Building Roads Building and oil and gas and petroleum companies in construction in construction ...

Interview Preparation Tips

Interview preparation tips for other job seekers - Need job offer as soon as possible and I will signed up for the agreement

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Why are remove the pile head.
  • Ans. 

    Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.

    • To prepare for further construction on top of the piles

    • To ensure proper load transfer to the foundation

    • To facilitate the installation of pile caps or beams

    • To adjust the pile length if necessary

  • Answered by AI
  • Q2. How many deduction of 90 degree angle.
  • Ans. 

    There are four deductions of 90 degree angles.

    • A 90 degree angle is formed when two lines intersect at a right angle.

    • In a square, all four angles are 90 degrees.

    • In a rectangle, opposite angles are 90 degrees.

    • In a right triangle, one angle is always 90 degrees.

  • Answered by AI
  • Q3. What is static load test and dynamic load test.
  • Ans. 

    Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.

    • Static load test involves applying a constant load to a structure and measuring its response over time.

    • Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.

    • Static load test helps determine the maxi...

  • Answered by AI
  • Q4. How many tolerance of pile load test.
  • Ans. 

    The number of tolerance of pile load test depends on the specific project requirements and standards.

    • The number of tolerance of pile load test can vary based on the project specifications and standards.

    • Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.

    • Some projects may have more stringent tolerance requirements depending on the criticality of the structure.

    • It is important to refer...

  • Answered by AI
  • Q5. What is rang Density of bentonite and why is this use.
  • Ans. 

    Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.

    • Range density of bentonite is typically between 17-22 lb/gal.

    • Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.

    • The range density of bentonite is important for determining its effectiveness in different applications.

    • Higher range density ...

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - Technical 

(1 Question)

  • Q1. Will ask Technical Questions Related to Projects.
Round 2 - HR 

(1 Question)

  • Q1. Will ask about past companies experience and role, responsibility etc.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Role of engineer to control disaster management

Round 2 - HR 

(1 Question)

  • Q1. Normal qurstions
Round 3 - Technical 

(1 Question)

  • Q1. About technical skills
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Foundation installation process is oil and gas industry
  • Ans. Explain it as required as per industry requirement like Valid Permit, Valid lifting plan, Approved method statement, barrication,Sign boards, banks man, competent and certified equipment and operator, rigger, color coded and inspected lifting accessories, check wind speed limits, foggy or dusty weather conditions
  • Answered Anonymously
  • Q2. Excavation process for oil and gas industry
  • Ans. 

    Excavation process in the oil and gas industry involves several steps to ensure safe and efficient operations.

    • The first step in the excavation process is to conduct a thorough site survey to identify potential hazards and determine the best approach for excavation.

    • Before excavation begins, proper permits and approvals must be obtained from relevant authorities.

    • Excavation equipment such as excavators, bulldozers, and ba...

  • Answered by AI
  • Q3. Valid Permit, approved method statement, Excavation certificate, check GPR (Ground penetrating radar)report, CAT (Cable avoidance Tool) Scan, Drawing, route marker, Trial pit, hard barricade the area, cert...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared as per your resume and for the post you apply for
If possible then Do some research about company and project that you apply for
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Easy questions. Take preperation for better performance

Round 3 - Technical 

(3 Questions)

  • Q1. Concept on structure and foundations. Basic question were asked
  • Q2. How did you design a pump foundation?
  • Ans. 

    Designing a pump foundation involves considering factors like soil conditions, load requirements, and structural stability.

    • Evaluate soil conditions to determine bearing capacity

    • Calculate loads from the pump and surrounding equipment

    • Design foundation to distribute loads evenly and prevent settlement

    • Consider factors like seismic activity and environmental conditions

    • Use appropriate materials and construction techniques fo...

  • Answered by AI
  • Q3. Steps to design a pipe racks
  • Ans. 

    Designing pipe racks involves several steps to ensure structural integrity and functionality.

    • Determine the layout and location of the pipe rack based on piping requirements and site constraints

    • Calculate the loads and stresses on the pipe rack to ensure it can support the weight of the pipes and withstand external forces

    • Select appropriate materials and structural components for the pipe rack based on the design requirem...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared tricky question in interview
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Procedure of laying tile and granite
  • Ans. 

    The procedure of laying tile and granite involves preparing the surface, applying adhesive, laying the tiles/granite, grouting, and sealing.

    • Prepare the surface by ensuring it is clean, level, and dry.

    • Apply adhesive to the surface using a trowel, ensuring even coverage.

    • Lay the tiles/granite starting from the center and working outwards in a pattern.

    • Grout the tiles/granite by filling the gaps between them with grout and ...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Regarding Underground Metro Station
  • Q2. Construction process of Underground Metro Station

Interview Preparation Tips

Interview preparation tips for other job seekers - If getting a chance to join Nesma, don't miss

I applied via Walk-in and was interviewed in Jun 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How to make unit setup
  • Ans. 

    To make a unit setup as a Draughtsman Civil, you need to follow these steps:

    • Determine the purpose and requirements of the unit setup

    • Create a detailed plan or layout of the unit setup

    • Consider factors such as dimensions, materials, and safety regulations

    • Use appropriate software or tools to design the unit setup

    • Collaborate with architects, engineers, and other professionals if necessary

    • Review and revise the design as need...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Saudi Binladin Group Draughtsman Civil interview:
  • AutoCAD Drawing
Interview preparation tips for other job seekers - Be straight forward msg all about the discussion at the time.

Interview Questionnaire 

6 Questions

  • Q1. They were asked about previous work experience in detail.
  • Q2. Previous Project details.
  • Q3. Previous projects shuttering area and type of formwork
  • Ans. 

    The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.

    • Used traditional timber formwork for a residential building project

    • Implemented modular steel formwork for a commercial complex

    • Utilized aluminum formwork for a high-rise construction

    • Employed tunnel formwork for an underground structure

  • Answered by AI
  • Q4. Build-up area
  • Q5. About subcontractors billing.
  • Q6. Formwork,steel and masonry work daily productive

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about your work.

Archirodon Interview FAQs

How many rounds are there in Archirodon Quality Control and Civil Supervisor interview?
Archirodon interview process usually has 2 rounds. The most common rounds in the Archirodon interview process are One-on-one Round and Technical.
What are the top questions asked in Archirodon Quality Control and Civil Supervisor interview?

Some of the top questions asked at the Archirodon Quality Control and Civil Supervisor interview -

  1. I Mohammed tajuddin have Diploma Civil engineer with Second Class in May 1997 a...read more
  2. Technical departm...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 414 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
View all
Mechanical Engineer
10 salaries
unlock blur

₹10 L/yr - ₹20 L/yr

HSE Officer
9 salaries
unlock blur

₹8.3 L/yr - ₹15.5 L/yr

Civil Site Engineer
7 salaries
unlock blur

₹8.4 L/yr - ₹20 L/yr

Land Surveyor
7 salaries
unlock blur

₹5.4 L/yr - ₹12.5 L/yr

Electrical Engineer
5 salaries
unlock blur

₹12.5 L/yr - ₹20 L/yr

Explore more salaries
Compare Archirodon with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Afcons Infrastructure

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview