A civil line refers to the underground network of pipes and cables that provide essential services to a community.
It includes water supply lines, sewage pipes, gas lines, and electrical cables.
Civil lines are usually located beneath roads and sidewalks.
Maintenance and repair of civil lines are crucial to ensure uninterrupted services to the community.
Civil supervisors are responsible for overseeing the installation and...
Top trending discussions
posted on 11 Oct 2024
I applied via Company Website and was interviewed in Sep 2024. There were 2 interview rounds.
posted on 20 Oct 2024
I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
The goal of an aptitude test is to predict the ability to learn new skills
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Maintain regular communication and interaction with all staff members.
Regularly check in with staff to ensure they have the resources and support they need
Hold regular team meetings to discuss project progress and address any concerns
Encourage open communication and feedback from all team members
Provide opportunities for team building and collaboration
Lead by example by being accessible and approachable to all staff me
I applied via Walk-in and was interviewed in Jun 2024. There were 4 interview rounds.
I applied via Approached by Company
Lap length and development length for hoop, grade of concrete, and HDPE pipe are specified in code.
Lap length for hoop reinforcement is specified in IS 456:2000 and varies based on the diameter of the bar and the grade of concrete.
Development length is the length of the bar required to transfer the stress from the bar to the surrounding concrete and is also specified in IS 456:2000.
The grade of concrete determines the ...
I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.
Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.
Hydration process starts as soon as water is added to cement.
The reaction produces heat and causes the mixture to harden and gain strength.
The process continues for weeks and even months, resulting in a stronger and more durable concrete.
The amount of water used in the mixture affects the hydration process and...
Concrete strength depends on various factors.
Water-cement ratio
Type and quality of cement
Aggregate size and shape
Curing conditions
Mix design
Age of concrete
Temperature and humidity
Presence of admixtures
Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.
Water is added to hydrate the cement and activate the chemical reaction that causes it to harden
The amount of water added affects the strength and durability of the concrete
Too much water can weaken the concrete and cause cracking
The water should be added gradually and mixed thoroughly to ensure even distribution
Ot...
I applied via LinkedIn and was interviewed in Jan 2022. There were 3 interview rounds.
Deputy Manager
610
salaries
| ₹6 L/yr - ₹16 L/yr |
Senior Engineer
429
salaries
| ₹4 L/yr - ₹12 L/yr |
Construction Engineer
306
salaries
| ₹3 L/yr - ₹8.5 L/yr |
Civil Site Engineer
231
salaries
| ₹1.8 L/yr - ₹9 L/yr |
Civil Supervisor
224
salaries
| ₹1.5 L/yr - ₹5.6 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra