The SOP (Standard Operating Procedure) of all works is a set of documented instructions that outline the steps to be followed for completing tasks.
SOPs provide consistency and ensure that tasks are performed correctly and efficiently.
They help in training new employees and serve as a reference guide for existing employees.
SOPs can cover various aspects such as safety procedures, quality control, maintenance, and troubl...
DLR stands for Detailed Project Report and DPR stands for Detailed Design Report. They are both important documents in engineering projects.
DLR is prepared before the start of a project and includes detailed information about the project scope, objectives, feasibility, and cost estimates.
DPR is prepared during the design phase of a project and provides detailed information about the design specifications, calculations,...
The quantity achieved is dependent on the manpower available.
The more manpower available, the higher the quantity that can be achieved.
Efficient utilization of manpower can lead to higher productivity.
Manpower shortage can result in lower quantity achieved.
Automation and technology can help in achieving higher quantity with less manpower.
Proper planning and coordination are essential to optimize manpower and achieve de
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The unit weight of steel refers to the weight of a specific volume of steel.
The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.
The specific unit weight of steel can vary depending on the type and grade of steel.
For example, the unit weight of mild steel is approximately 490 pounds per cubic foot or 7850 kilograms per cubic meter.
On the other hand, the unit weight of sta...
Shapoorji Pallonji Group interview questions for designations
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
Top trending discussions
After the shortlisting of CVs, list was sent for those who were eligible for the OT. The online test included aptitude + technical. There were pretty easy to moderate questions but time was less.
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
I applied via Referral and was interviewed in Jan 2024. There was 1 interview round.
The capacity of Tata Steel's lime plant is yet to be determined.
The capacity of the lime plant is currently unknown and is still to be decided by Tata Steel.
Tata Steel is likely in the process of determining the optimal capacity for their lime plant.
The capacity of the lime plant will depend on various factors such as production requirements, market demand, and technological capabilities.
based on 2 interviews
3 Interview rounds
based on 47 reviews
Rating in categories
Deputy Manager
614
salaries
| ₹6 L/yr - ₹16.6 L/yr |
Senior Engineer
428
salaries
| ₹4 L/yr - ₹12 L/yr |
Construction Engineer
301
salaries
| ₹3 L/yr - ₹9 L/yr |
Civil Site Engineer
228
salaries
| ₹1.5 L/yr - ₹9 L/yr |
Civil Supervisor
223
salaries
| ₹1.5 L/yr - ₹5.6 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra