Initial setting time is the time taken for the cement to harden to a certain degree, while final setting time is the time taken for the cement to completely harden.
Initial setting time is typically around 30 minutes to 1 hour after adding water to the cement.
Final setting time is usually around 2 to 4 hours after adding water to the cement.
Setting time can vary based on the type of cement and environmental conditions.
S
Bleeding is the process of air escaping from fresh concrete mix and rising to the surface.
Bleeding occurs when water in the concrete mix rises to the surface due to settlement of solid particles.
It can lead to surface defects if not properly managed.
Bleeding can be reduced by using proper mix design and techniques like vibration or adding admixtures.
Excessive bleeding can weaken the surface of the concrete.
Examples: Wa...
I applied via Company Website and was interviewed before Dec 2022. There were 3 interview rounds.
Cement test, bitumen test, road density, ravite, autocad
Concrete properties grade
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
Shapoorji Pallonji Group interview questions for designations
Top trending discussions
I applied via Job Fair and was interviewed in Oct 2024. There were 3 interview rounds.
One way slab is supported on two opposite sides, while two way slab is supported on all four sides.
One way slab is designed to carry loads predominantly in one direction.
Two way slab is designed to carry loads in both directions.
One way slab is more economical for smaller spans, while two way slab is more suitable for larger spans.
Examples: One way slab - balcony, corridor. Two way slab - office building, parking garag
Designing beams and columns involves determining the size, material, and layout to support the required loads.
Consider the type of structure and the loads it will bear
Calculate the required dimensions and reinforcement based on structural analysis
Select appropriate materials such as steel or concrete
Ensure proper connections and detailing for stability and safety
Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.
Limit state of serviceability ensures that a structure remains usable and safe for occupants.
It involves checking factors like deflection, vibration, cracking, and durability.
For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
I applied via Company Website and was interviewed in Feb 2024. There were 2 interview rounds.
based on 76 reviews
Rating in categories
Deputy Manager
614
salaries
| ₹6 L/yr - ₹16 L/yr |
Senior Engineer
428
salaries
| ₹4 L/yr - ₹12.2 L/yr |
Construction Engineer
303
salaries
| ₹2.4 L/yr - ₹9 L/yr |
Civil Site Engineer
233
salaries
| ₹1.5 L/yr - ₹9.2 L/yr |
Safety Officer
228
salaries
| ₹1.5 L/yr - ₹7.5 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra