I was interviewed in Dec 2022.
Turbine and Boiler light up procedure
Check all valves and switches are in the correct position
Check fuel and water levels
Start the boiler and wait for steam pressure to build up
Open the turbine inlet valve and gradually increase load
Monitor all parameters and adjust as necessary