Filter interviews by
ISI Code
I applied via Approached by Company and was interviewed before Jun 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Nov 2022. There were 4 interview rounds.
Discussion about experiance and previous job , achievement of that job, product technical knowledge, current role
I applied via Approached by Company and was interviewed in May 2024. There were 2 interview rounds.
Warehousing focuses on storing physical goods, while ecommerce involves buying and selling goods online.
Warehousing involves storing physical goods in a physical location, while ecommerce involves buying and selling goods online.
In warehousing, goods are typically stored in a warehouse or distribution center, while in ecommerce, goods are sold through online platforms.
Warehousing requires physical space and logistics f...
Implementing efficient supply chain management, setting clear performance metrics, utilizing technology, and fostering strong communication with suppliers are key methods to improve delivery performance.
Implementing efficient supply chain management practices such as just-in-time inventory management
Setting clear performance metrics to track and measure delivery performance
Utilizing technology such as GPS tracking and ...
I appeared for an interview before Feb 2024.
I am a dedicated professional with a strong background in management, coming from a supportive family. I am interested in joining your team to further develop my skills and contribute to the company's success.
Experienced in management roles
Supportive family background
Desire to further develop skills and contribute to company success
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
Power plant cycle is a series of processes that convert fuel into electricity.
Fuel is burned to produce heat
Heat is used to boil water and create steam
Steam turns a turbine which generates electricity
Excess heat is released into the environment
Water is cooled and recycled in the system
Casting methods are processes used to create metal objects by pouring molten metal into a mold.
Sand casting: uses sand molds to create the shape of the object
Investment casting: uses wax patterns that are melted away to create the mold
Die casting: uses metal molds to create complex shapes with high accuracy
Permanent mold casting: uses reusable molds made of metal
Centrifugal casting: rotates the mold to distribute the m
Batch production is a manufacturing process where products are made in groups or batches, rather than individually.
Products are produced in specified quantities at a time
Each batch goes through the whole production process together
Common in industries like food processing, pharmaceuticals, and automotive manufacturing
Supercritical stage of steam refers to a state where it exhibits properties of both liquid and gas.
Occurs at temperatures and pressures above the critical point
Density and viscosity are similar to liquids, while diffusivity and compressibility are similar to gases
No distinct boundary between liquid and gas phases
Used in power plants for more efficient energy generation
Normality test in Six Sigma is used to check if data follows a normal distribution, which is important for statistical analysis.
Normality tests help ensure that the data meets the assumptions of the statistical tests being used in Six Sigma.
Common normality tests include Shapiro-Wilk test, Kolmogorov-Smirnov test, and Anderson-Darling test.
If data is not normally distributed, transformations or non-parametric tests may
Hypothesis testing is a statistical method used to make inferences about a population based on sample data.
Hypothesis testing involves formulating a null hypothesis and an alternative hypothesis.
The null hypothesis is assumed to be true until there is enough evidence to reject it.
A significance level is chosen to determine the threshold for rejecting the null hypothesis.
Common hypothesis tests include t-tests, chi-squa...
General aptitude test
based on 8 reviews
Rating in categories
Site Engineer
128
salaries
| ₹3.8 L/yr - ₹8 L/yr |
Project Management Consultant
54
salaries
| ₹4.1 L/yr - ₹6.8 L/yr |
Manager
52
salaries
| ₹10 L/yr - ₹22 L/yr |
Senior Manager
46
salaries
| ₹12.3 L/yr - ₹31.9 L/yr |
Deputy Manager
45
salaries
| ₹6 L/yr - ₹15 L/yr |
Tata Power
Adani Power
NTPC
BHEL