Load density refers to the amount of power consumed per unit area or volume.
Load density is typically measured in watts per square meter or watts per cubic meter.
It is used in electrical design to determine the distribution of power consumption in a given space.
Higher load density may require more robust electrical systems to handle the increased power demand.
For example, data centers have high load density due to the ...
Short circuit current from 1000kVA TF (5% Z) on a panel and determine its CB Fault current rating using IEC Standard.
Calculate the short circuit current using the formula: Short circuit current = 1000kVA / (1.732 * 5%)
Determine the CB Fault current rating based on the calculated short circuit current
Refer to IEC Standard for guidelines on short circuit current calculations and CB ratings
The cable size and circuit breaker rating for a 50KW motor at 30m distance from the panel depend on factors like voltage, current, and installation conditions.
Calculate the full load current (FLC) of the motor using the formula: FLC = (Power (kW) * 1000) / (sqrt(3) * Voltage)
Select a cable size based on the FLC, voltage drop considerations, and installation conditions
Choose a circuit breaker rating based on the FLC and...
CRI stands for Color Rendering Index, a measure of how accurately a light source illuminates colors compared to natural light.
CRI is a scale from 0 to 100, with higher values indicating better color rendering.
It is important in lighting design to ensure colors appear true and vibrant.
LED lights typically have high CRI values, making them popular for applications where color accuracy is crucial.
UGR stands for Unified Glare Rating, a measure of the discomfort glare perceived by an observer.
UGR is used in lighting design to evaluate the visual comfort of lighting installations.
It takes into account factors such as the luminance of the light source, the position of the observer, and the reflectance of the surrounding surfaces.
Lower UGR values indicate less glare and better visual comfort for the occupants.
For ex...
Uniformity factor is a measure of how evenly distributed light is in a given space.
Uniformity factor is calculated by dividing the minimum illuminance level by the average illuminance level in a space.
A higher uniformity factor indicates more even lighting distribution.
Uniformity factor is important in lighting design to ensure consistent lighting levels throughout a space.
For example, in an office setting, a uniformit
Maintenance factor is a multiplier used in lighting design to account for the decrease in light output over time due to dirt, aging, and other factors.
Maintenance factor is typically a value between 0 and 1, with 1 indicating no decrease in light output over time.
It is used to adjust the initial illuminance level calculated for a space to account for the decrease in light output over the life of the lighting system.
Fac...
Reflection index in rooms refers to the amount of sound reflected off surfaces within a room.
Reflection index is important in determining the acoustics of a room.
High reflection index can lead to echoes and reverberation.
Materials like concrete and glass have high reflection index, while soft materials like carpets and curtains have low reflection index.
Exit sign lighting in corridors or pathways is designed to provide clear and visible guidance to occupants in case of emergency.
Ensure exit signs are placed at all exits and change in direction
Use photoluminescent materials for backup in case of power failure
Provide adequate lighting levels to ensure visibility in all conditions
Consider using LED lights for energy efficiency and long lifespan
Earthing design involves creating a low-resistance path for fault currents to safely dissipate into the ground.
Determine the type of earthing system needed based on the specific requirements of the electrical installation.
Calculate the required size of the earthing conductors based on the fault current levels and soil resistivity.
Ensure proper bonding of all metallic structures and equipment to the earthing system to p...
Earth loop impedance is the total impedance of the earth fault current path in an electrical circuit.
Earth loop impedance is important for ensuring the safety of electrical installations.
It is measured in ohms and is used to calculate the maximum fault current that could flow in the event of a fault.
Low earth loop impedance is desirable as it helps to quickly trip circuit breakers in case of a fault.
It is influenced by...
Designing a transformer room involves considering safety, space requirements, ventilation, and electrical codes.
Ensure proper ventilation to prevent overheating of transformers
Follow electrical codes and regulations for clearances and access
Provide adequate space for maintenance and operation of transformers
Consider safety measures such as fire protection and emergency shutdown systems
Cable tray sizing involves considering the current carrying capacity, voltage drop, and environmental factors.
Calculate the total current carrying capacity required for the cables in the tray.
Consider the voltage drop limitations based on the distance and load.
Take into account the environmental factors such as temperature, humidity, and corrosive elements.
Select the appropriate size and material of the cable tray base...
Spacing between smoke detectors depends on the type of detector and the manufacturer's recommendations.
Spacing between smoke detectors is typically around 30 feet in residential areas.
For high ceilings, detectors may need to be spaced closer together.
Consult the manufacturer's guidelines for specific spacing requirements.
Clearance between cable tray and wet service pipe is maintained by using appropriate support systems and ensuring proper spacing.
Use support systems such as clamps, hangers, and brackets to secure the cable tray and wet service pipe at appropriate distances.
Ensure proper spacing between the cable tray and wet service pipe to prevent any contact or interference.
Follow industry standards and regulations for minimum clear...
Designing a CCTV system involves selecting appropriate cameras, DVR/NVR, and cables based on requirements.
Determine the coverage area and required resolution for each camera
Select suitable cameras (e.g. dome, bullet, PTZ) based on the environment
Choose a DVR/NVR with enough storage capacity and network connectivity
Use high-quality coaxial cables (e.g. RG59) for analog cameras or Ethernet cables for IP cameras
Consider u...
Harmonics in transformers are non-linear currents or voltages that can cause overheating, increased losses, and interference in electrical systems.
Harmonics are multiples of the fundamental frequency in the power system, typically caused by non-linear loads like variable frequency drives or rectifiers.
Impacts of harmonics include increased heating in transformers, higher losses, reduced power quality, and interference ...
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
Patch load on towers refers to the additional weight or load that is applied to a tower structure to strengthen or modify its capacity.
Patch load can be applied to towers to increase their capacity to withstand wind, seismic, or other loads.
Patch load can also be used to redistribute loads on a tower to prevent structural failures.
Examples of patch loads include adding steel plates or braces to a tower structure to inc...
Codes on towers refer to the specific design and construction standards that must be followed for safety and structural integrity.
Codes on towers are regulations set by organizations like ANSI/TIA and ASCE that dictate the design, construction, and maintenance of towers.
These codes cover aspects such as materials used, structural design, wind loading, and safety factors.
For example, ANSI/TIA-222-G specifies the require...
Ramboll interview questions for popular designations
I applied via Approached by Company and was interviewed in Mar 2024. There were 2 interview rounds.
Adopting security controls is crucial for protecting sensitive information and preventing cyber attacks.
Implementing strong password policies
Regularly updating software and systems
Enforcing access controls based on least privilege
Conducting regular security audits and assessments
Training employees on security best practices
Get interview-ready with Top Ramboll Interview Questions
I applied via Approached by Company and was interviewed in Nov 2023. There were 2 interview rounds.
I can help with Lidar and modeling by utilizing my knowledge and skills in data analysis, software tools, and 3D modeling techniques.
I have experience working with Lidar data and can assist in processing and analyzing the data to extract meaningful information.
I am proficient in using software tools like AutoCAD, SolidWorks, or Blender to create accurate and detailed 3D models based on Lidar data.
I can collaborate with...
Yes, alignment can be inserted with 3km stations and the triangles can be limited for the surface.
To insert alignment with 3km stations, you can use alignment design software or CAD tools.
For limiting triangles on the surface, you can use surface modeling techniques or software.
By specifying the desired triangle size or density, you can control the number of triangles on the surface.
The policy process can be made accessible to non-IT users through clear communication, training, and user-friendly documentation.
Use plain language and avoid technical jargon when explaining policies to non-IT users.
Provide training sessions or workshops to educate non-IT users about the policy process and its importance.
Create user-friendly documentation, such as policy summaries or infographics, that clearly outline ...
The CIS Controls are a set of best practices for cybersecurity defense.
The CIS Controls are a prioritized set of actions that organizations can take to improve their cybersecurity posture.
There are 20 CIS Controls, which are organized into three implementation groups: Basic, Foundational, and Organizational.
Examples of CIS Controls include implementing strong passwords, regularly patching software, and monitoring netwo...
I applied via LinkedIn and was interviewed in Oct 2023. There was 1 interview round.
Earthquake loads are calculated using seismic design codes and formulas based on the seismic hazard of the region.
Determine the seismic hazard of the region using historical data and seismic maps
Select a seismic design code such as ASCE 7 or Eurocode 8
Calculate the seismic base shear using the formula V = CsW
Distribute the seismic base shear to the structure using the appropriate load combinations
Consider the effects o...
I applied via Referral and was interviewed in Mar 2023. There were 2 interview rounds.
I am a quality engineer with experience in ensuring product quality and process improvement.
Experienced in implementing quality control measures
Proficient in statistical analysis and problem-solving
Skilled in conducting audits and inspections
Strong communication and interpersonal skills
Continuous learner and adaptable to change
I am currently working as a Quality Engineer at XYZ Company.
Responsible for ensuring product quality meets customer requirements and industry standards
Develop and implement quality control procedures and processes
Conduct audits and inspections to identify areas for improvement
Collaborate with cross-functional teams to resolve quality issues
Provide training and support to employees on quality-related topics
Bolt grade refers to the strength and hardness of a bolt. It is indicated by a number stamped on the head of the bolt.
Bolt grade is determined by the material and manufacturing process of the bolt.
Higher grade bolts are stronger and can withstand more stress.
Bolt grade is indicated by a number stamped on the head of the bolt, such as 8.8 or 10.9.
The first number indicates the ultimate tensile strength in MPa, while the...
Top trending discussions
Some of the top questions asked at the Ramboll interview -
The duration of Ramboll interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 32 interviews
Interview experience
based on 516 reviews
Rating in categories
Advanced Associate
139
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
71
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Associate
54
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
WSP
ARCADIS