An Electrical Design Engineer was asked
Q. What is the maintenance factor in lighting design?
Ans. 

Maintenance factor is a multiplier used in lighting design to account for the decrease in light output over time due to dirt, aging, and other factors.

  • Maintenance factor is typically a value between 0 and 1, with 1 indicating no decrease in light output over time.

  • It is used to adjust the initial illuminance level calculated for a space to account for the decrease in light output over the life of the lighting syste...

An Electrical Design Engineer was asked
Q. How do you size a cable tray?
Ans. 

Cable tray sizing involves considering the current carrying capacity, voltage drop, and environmental factors.

  • Calculate the total current carrying capacity required for the cables in the tray.

  • Consider the voltage drop limitations based on the distance and load.

  • Take into account the environmental factors such as temperature, humidity, and corrosive elements.

  • Select the appropriate size and material of the cable tray...

Electrical Design Engineer Interview Questions Asked at Other Companies

Q1. 8.How do we calculate Cabel sizing? Formula for Voltage drop? How ... read more
Q2. What kind of input is required for a single-line diagram?
Q3. 6.What is Percentage Impedance? Importance in short circuit curre ... read more
Q4. 13.Lighting calculation? What is light loss factor ? What is util ... read more
Q5. What are non-linear loads? What is the difference between non-lin ... read more
An Electrical Design Engineer was asked
Q. How do you design a transformer room?
Ans. 

Designing a transformer room involves considering safety, space requirements, ventilation, and electrical codes.

  • Ensure proper ventilation to prevent overheating of transformers

  • Follow electrical codes and regulations for clearances and access

  • Provide adequate space for maintenance and operation of transformers

  • Consider safety measures such as fire protection and emergency shutdown systems

An Electrical Design Engineer was asked
Q. How do you design exit sign lighting in corridors or pathways?
Ans. 

Exit sign lighting in corridors or pathways is designed to provide clear and visible guidance to occupants in case of emergency.

  • Ensure exit signs are placed at all exits and change in direction

  • Use photoluminescent materials for backup in case of power failure

  • Provide adequate lighting levels to ensure visibility in all conditions

  • Consider using LED lights for energy efficiency and long lifespan

An Electrical Design Engineer was asked
Q. What is earth loop impedance?
Ans. 

Earth loop impedance is the total impedance of the earth fault current path in an electrical circuit.

  • Earth loop impedance is important for ensuring the safety of electrical installations.

  • It is measured in ohms and is used to calculate the maximum fault current that could flow in the event of a fault.

  • Low earth loop impedance is desirable as it helps to quickly trip circuit breakers in case of a fault.

  • It is influenc...

An Electrical Design Engineer was asked
Q. What is the reflection index in rooms?
Ans. 

Reflection index in rooms refers to the amount of sound reflected off surfaces within a room.

  • Reflection index is important in determining the acoustics of a room.

  • High reflection index can lead to echoes and reverberation.

  • Materials like concrete and glass have high reflection index, while soft materials like carpets and curtains have low reflection index.

An Electrical Design Engineer was asked
Q. What is UGR in lighting design?
Ans. 

UGR stands for Unified Glare Rating, a measure of the discomfort glare perceived by an observer.

  • UGR is used in lighting design to evaluate the visual comfort of lighting installations.

  • It takes into account factors such as the luminance of the light source, the position of the observer, and the reflectance of the surrounding surfaces.

  • Lower UGR values indicate less glare and better visual comfort for the occupants.

  • F...

Are these interview questions helpful?
An Electrical Design Engineer was asked
Q. How is clearance maintained between cable trays and wet service pipes?
Ans. 

Clearance between cable tray and wet service pipe is maintained by using appropriate support systems and ensuring proper spacing.

  • Use support systems such as clamps, hangers, and brackets to secure the cable tray and wet service pipe at appropriate distances.

  • Ensure proper spacing between the cable tray and wet service pipe to prevent any contact or interference.

  • Follow industry standards and regulations for minimum ...

An Electrical Design Engineer was asked
Q. How do you design an earthing system?
Ans. 

Earthing design involves creating a low-resistance path for fault currents to safely dissipate into the ground.

  • Determine the type of earthing system needed based on the specific requirements of the electrical installation.

  • Calculate the required size of the earthing conductors based on the fault current levels and soil resistivity.

  • Ensure proper bonding of all metallic structures and equipment to the earthing system...

An Electrical Design Engineer was asked
Q. What is load density?
Ans. 

Load density refers to the amount of power consumed per unit area or volume.

  • Load density is typically measured in watts per square meter or watts per cubic meter.

  • It is used in electrical design to determine the distribution of power consumption in a given space.

  • Higher load density may require more robust electrical systems to handle the increased power demand.

  • For example, data centers have high load density due to...

Ramboll Electrical Design Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(17 Questions)

  • Q1. What is load density?
  • Ans. 

    Load density refers to the amount of power consumed per unit area or volume.

    • Load density is typically measured in watts per square meter or watts per cubic meter.

    • It is used in electrical design to determine the distribution of power consumption in a given space.

    • Higher load density may require more robust electrical systems to handle the increased power demand.

    • For example, data centers have high load density due to the ...

  • Answered by AI
  • Q2. What will be short circuit current form 1000kVA TF (5% Z) on a panel and determine it’s CB Fault current rating? Which IEC Standard is used?
  • Ans. 

    Short circuit current from 1000kVA TF (5% Z) on a panel and determine its CB Fault current rating using IEC Standard.

    • Calculate the short circuit current using the formula: Short circuit current = 1000kVA / (1.732 * 5%)

    • Determine the CB Fault current rating based on the calculated short circuit current

    • Refer to IEC Standard for guidelines on short circuit current calculations and CB ratings

  • Answered by AI
  • Q3. What will be cable size & CB rating for 50KW motor at 30m distance from panel?
  • Ans. 

    The cable size and circuit breaker rating for a 50KW motor at 30m distance from the panel depend on factors like voltage, current, and installation conditions.

    • Calculate the full load current (FLC) of the motor using the formula: FLC = (Power (kW) * 1000) / (sqrt(3) * Voltage)

    • Select a cable size based on the FLC, voltage drop considerations, and installation conditions

    • Choose a circuit breaker rating based on the FLC and...

  • Answered by AI
  • Q4. What is CRI? (Lighting design)
  • Ans. 

    CRI stands for Color Rendering Index, a measure of how accurately a light source illuminates colors compared to natural light.

    • CRI is a scale from 0 to 100, with higher values indicating better color rendering.

    • It is important in lighting design to ensure colors appear true and vibrant.

    • LED lights typically have high CRI values, making them popular for applications where color accuracy is crucial.

  • Answered by AI
  • Q5. What is UGR? (Lighting design)
  • Ans. 

    UGR stands for Unified Glare Rating, a measure of the discomfort glare perceived by an observer.

    • UGR is used in lighting design to evaluate the visual comfort of lighting installations.

    • It takes into account factors such as the luminance of the light source, the position of the observer, and the reflectance of the surrounding surfaces.

    • Lower UGR values indicate less glare and better visual comfort for the occupants.

    • For ex...

  • Answered by AI
  • Q6. What is Uniformity factor? (Lighting design)
  • Ans. 

    Uniformity factor is a measure of how evenly distributed light is in a given space.

    • Uniformity factor is calculated by dividing the minimum illuminance level by the average illuminance level in a space.

    • A higher uniformity factor indicates more even lighting distribution.

    • Uniformity factor is important in lighting design to ensure consistent lighting levels throughout a space.

    • For example, in an office setting, a uniformit...

  • Answered by AI
  • Q7. What is maintenance factor? (Lighting design)
  • Ans. 

    Maintenance factor is a multiplier used in lighting design to account for the decrease in light output over time due to dirt, aging, and other factors.

    • Maintenance factor is typically a value between 0 and 1, with 1 indicating no decrease in light output over time.

    • It is used to adjust the initial illuminance level calculated for a space to account for the decrease in light output over the life of the lighting system.

    • Fac...

  • Answered by AI
  • Q8. What are reflection index in rooms?
  • Ans. 

    Reflection index in rooms refers to the amount of sound reflected off surfaces within a room.

    • Reflection index is important in determining the acoustics of a room.

    • High reflection index can lead to echoes and reverberation.

    • Materials like concrete and glass have high reflection index, while soft materials like carpets and curtains have low reflection index.

  • Answered by AI
  • Q9. How to design exit sign lighting in corridor or pathways? (Lighting design)
  • Ans. 

    Exit sign lighting in corridors or pathways is designed to provide clear and visible guidance to occupants in case of emergency.

    • Ensure exit signs are placed at all exits and change in direction

    • Use photoluminescent materials for backup in case of power failure

    • Provide adequate lighting levels to ensure visibility in all conditions

    • Consider using LED lights for energy efficiency and long lifespan

  • Answered by AI
  • Q10. How to design earthing?
  • Ans. 

    Earthing design involves creating a low-resistance path for fault currents to safely dissipate into the ground.

    • Determine the type of earthing system needed based on the specific requirements of the electrical installation.

    • Calculate the required size of the earthing conductors based on the fault current levels and soil resistivity.

    • Ensure proper bonding of all metallic structures and equipment to the earthing system to p...

  • Answered by AI
  • Q11. What earth loop impedance?
  • Ans. 

    Earth loop impedance is the total impedance of the earth fault current path in an electrical circuit.

    • Earth loop impedance is important for ensuring the safety of electrical installations.

    • It is measured in ohms and is used to calculate the maximum fault current that could flow in the event of a fault.

    • Low earth loop impedance is desirable as it helps to quickly trip circuit breakers in case of a fault.

    • It is influenced by...

  • Answered by AI
  • Q12. How to design transformer room?
  • Ans. 

    Designing a transformer room involves considering safety, space requirements, ventilation, and electrical codes.

    • Ensure proper ventilation to prevent overheating of transformers

    • Follow electrical codes and regulations for clearances and access

    • Provide adequate space for maintenance and operation of transformers

    • Consider safety measures such as fire protection and emergency shutdown systems

  • Answered by AI
  • Q13. How to size cable tray?
  • Ans. 

    Cable tray sizing involves considering the current carrying capacity, voltage drop, and environmental factors.

    • Calculate the total current carrying capacity required for the cables in the tray.

    • Consider the voltage drop limitations based on the distance and load.

    • Take into account the environmental factors such as temperature, humidity, and corrosive elements.

    • Select the appropriate size and material of the cable tray base...

  • Answered by AI
  • Q14. How much spacing required between smoke detectors?
  • Ans. 

    Spacing between smoke detectors depends on the type of detector and the manufacturer's recommendations.

    • Spacing between smoke detectors is typically around 30 feet in residential areas.

    • For high ceilings, detectors may need to be spaced closer together.

    • Consult the manufacturer's guidelines for specific spacing requirements.

  • Answered by AI
  • Q15. How clearance maintained with cable tray and wet service pipe ?
  • Ans. 

    Clearance between cable tray and wet service pipe is maintained by using appropriate support systems and ensuring proper spacing.

    • Use support systems such as clamps, hangers, and brackets to secure the cable tray and wet service pipe at appropriate distances.

    • Ensure proper spacing between the cable tray and wet service pipe to prevent any contact or interference.

    • Follow industry standards and regulations for minimum clear...

  • Answered by AI
  • Q16. How to design CCTV system ? which cable used for CCTV?
  • Ans. 

    Designing a CCTV system involves selecting appropriate cameras, DVR/NVR, and cables based on requirements.

    • Determine the coverage area and required resolution for each camera

    • Select suitable cameras (e.g. dome, bullet, PTZ) based on the environment

    • Choose a DVR/NVR with enough storage capacity and network connectivity

    • Use high-quality coaxial cables (e.g. RG59) for analog cameras or Ethernet cables for IP cameras

    • Consider u...

  • Answered by AI
  • Q17. What is Harmonics in transformer? What are it’s impacts on system and how to reduce it?
  • Ans. 

    Harmonics in transformers are non-linear currents or voltages that can cause overheating, increased losses, and interference in electrical systems.

    • Harmonics are multiples of the fundamental frequency in the power system, typically caused by non-linear loads like variable frequency drives or rectifiers.

    • Impacts of harmonics include increased heating in transformers, higher losses, reduced power quality, and interference ...

  • Answered by AI
Round 2 - ToolTest 

(2 Questions)

  • Q1. Revit tool test: -Link Arch file. -Copy monitor all levels. -Create central file. -Create filter for power, lighting & cable tray. -Create workset for power, lighting. -Create view template. -Place panels ...
  • Q2. Post tool test questions. 1. What is Type & instance parameter? 2. What is view template & revit template? 3. Template file format? 4. How to do electrical distribution. 5. What is difference between navi...

Skills evaluated in this interview

Top trending discussions

View All
Interview Tips & Stories
4d (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Ramboll?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Referral and was interviewed before Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Purely Technical

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not give answer in hurry. Be calm. Always be specific.

Electrical Design Engineer Interview Questions Asked at Other Companies

Q1. 8.How do we calculate Cabel sizing? Formula for Voltage drop? How ... read more
Q2. What kind of input is required for a single-line diagram?
Q3. 6.What is Percentage Impedance? Importance in short circuit curre ... read more
Q4. 13.Lighting calculation? What is light loss factor ? What is util ... read more
Q5. What are non-linear loads? What is the difference between non-lin ... read more

Interview Questionnaire 

1 Question

  • Q1. Related to highway design

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare the IRC codes well.

I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Tell me about you work experience.
  • Ans. I have explained them about my projects I have worked with key points and highlight.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - All questions were about my work experience. confidence and clarity about the work you have done matters a lot.
They have also asked which softwares and codes I have worked on. Their main requirement was US codes.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Good test. You need to do a good preparation to crack that.

Round 3 - Technical 

(2 Questions)

  • Q1. Technical round was a deatiled round. power system was the core.
  • Q2. Basic or Power System

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company to work. Good working environment. Friendly culture.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Process description of treatment plant
  • Ans. 

    A treatment plant is a facility where wastewater is treated to remove contaminants before being discharged back into the environment.

    • Treatment plants use a combination of physical, chemical, and biological processes to remove pollutants from wastewater.

    • Common processes in treatment plants include screening, sedimentation, filtration, and disinfection.

    • Examples of treatment plants include sewage treatment plants, water t...

  • Answered by AI
  • Q2. About different concepts of pid
Round 2 - HR 

(2 Questions)

  • Q1. Salary discussion and negotiation
  • Q2. French language proficiency
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Technical questions
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Are these interview questions helpful?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Oct 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Duration of noticed period
Round 3 - Technical 

(1 Question)

  • Q1. Software and std. .. Knowledge ofvoil and gas

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge about microstation and e3d. More than 10yr exp. Preferred
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Cable sizing calculation
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical related to engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - Good positive session
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Aptitude Test 

Question where asked from trains,permutation and some grammer

Interview Preparation Tips

Topics to prepare for Wood Group Design Engineer interview:
  • Transformers
  • basic aptitude
Interview preparation tips for other job seekers - stay consistent

Ramboll Interview FAQs

How many rounds are there in Ramboll Electrical Design Engineer interview?
Ramboll interview process usually has 2 rounds. The most common rounds in the Ramboll interview process are Technical.
How to prepare for Ramboll Electrical Design Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Ramboll. The most common topics and skills that interviewers at Ramboll expect are Electrical Design, Electrical Engineering, Electricals, Earthing and AutoCAD.
What are the top questions asked in Ramboll Electrical Design Engineer interview?

Some of the top questions asked at the Ramboll Electrical Design Engineer interview -

  1. What will be cable size & CB rating for 50KW motor at 30m distance from pan...read more
  2. What will be short circuit current form 1000kVA TF (5% Z) on a panel and determ...read more
  3. How clearance maintained with cable tray and wet service pip...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 827 Interviews
Saint-Gobain Interview Questions
4.0
 • 184 Interviews
AECOM Interview Questions
4.2
 • 128 Interviews
Worley Interview Questions
4.1
 • 121 Interviews
AtkinsRealis Interview Questions
3.9
 • 92 Interviews
Bechtel Interview Questions
3.9
 • 70 Interviews
Wood Group Interview Questions
3.8
 • 63 Interviews
View all
Ramboll Electrical Design Engineer Salary
based on 10 salaries
₹7.5 L/yr - ₹12.5 L/yr
58% more than the average Electrical Design Engineer Salary in India
View more details

Ramboll Electrical Design Engineer Reviews and Ratings

based on 6 reviews

4.3/5

Rating in categories

3.3

Skill development

4.6

Work-life balance

4.0

Salary

4.0

Job security

4.1

Company culture

3.7

Promotions

3.5

Work satisfaction

Explore 6 Reviews and Ratings
Advanced Associate
99 salaries
unlock blur

₹4 L/yr - ₹7.8 L/yr

Quality Engineer
74 salaries
unlock blur

₹2.8 L/yr - ₹6.4 L/yr

Senior Associate
64 salaries
unlock blur

₹5 L/yr - ₹9.8 L/yr

Design Engineer
54 salaries
unlock blur

₹3.5 L/yr - ₹14.5 L/yr

Assistant Engineer
50 salaries
unlock blur

₹5.7 L/yr - ₹10 L/yr

Explore more salaries
Compare Ramboll with

L&T Construction

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare
write
Share an Interview