Filter interviews by
Clear (1)
I applied via Approached by Company and was interviewed in Mar 2024. There were 2 interview rounds.
Adopting security controls is crucial for protecting sensitive information and preventing cyber attacks.
Implementing strong password policies
Regularly updating software and systems
Enforcing access controls based on least privilege
Conducting regular security audits and assessments
Training employees on security best practices
Top trending discussions
I was interviewed in Apr 2023.
I applied via LinkedIn and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Campus Placement
This was the first round and there were questions from my core subjects along with aptitude test and English language test.
I am a passionate architect with 10 years of experience in designing sustainable and innovative buildings.
10 years of experience in architecture
Specialize in sustainable design
Innovative approach to building design
Strong passion for architecture
My portfolio showcases a diverse range of architectural projects, highlighting my design skills and creativity.
Include a variety of projects such as residential, commercial, and public spaces
Highlight any awards or recognition received for projects
Showcase before and after photos to demonstrate transformation of spaces
I applied via Other and was interviewed in Oct 2020. There were 3 interview rounds.
Power transmission & operation of batching plant in transit mixer is crucial for efficient concrete mixing.
Power transmission in transit mixer is done through a hydraulic motor which is connected to the mixer drum.
The batching plant is responsible for mixing the ingredients in the right proportion and delivering it to the transit mixer.
The operation of the batching plant involves loading the ingredients into the hopper...
Technical assessment of knowledge and capacity of candidates
I applied via Walk-in and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Mar 2022. There were 2 interview rounds.
Design of pier involves considering various factors such as load capacity, soil conditions, water level, and environmental impact.
Determine the load capacity and type of pier required
Analyze soil conditions and water level to determine foundation type
Consider environmental impact and regulations
Design for durability and maintenance
Ensure safety measures are in place
Rigid pile caps are designed to transfer the load from the superstructure to the piles. The design should consider the pile arrangement, load distribution, and soil properties.
The pile cap should be designed to distribute the load evenly to the piles.
The pile arrangement should be considered to ensure that the pile cap is not overloaded.
The soil properties should be analyzed to determine the bearing capacity of the pil...
Prestressing losses occur during the transfer of prestress from the jacks to the concrete. These losses can be divided into two stages.
The first stage is immediate losses, which occur due to friction between the strands and the ducts, anchorage slip, and elastic shortening of the concrete.
The second stage is time-dependent losses, which occur due to creep and shrinkage of the concrete, relaxation of the steel, and temp...
Design of steel members and connections involves determining the appropriate size and shape of steel components and how they are connected.
Consider the loads and stresses that the steel members will be subjected to
Select appropriate steel sections based on their strength and stiffness
Design connections that can transfer loads between members without failure
Ensure that the design complies with relevant codes and standar...
Pre-tension is applied before concrete is poured, while post-tension is applied after concrete has hardened.
Pre-tension involves stretching steel cables or bars before pouring concrete to create tension in the concrete as it sets.
Post-tension involves inserting steel cables or bars into hardened concrete and then tensioning them to create compression in the concrete.
Pre-tension is typically used in precast concrete ele...
Analysis and design of piles involves determining the load capacity and selecting the appropriate type of pile for a given soil condition.
Pile load capacity is determined through various methods such as static load tests, dynamic load tests, and pile integrity tests.
Factors such as soil type, groundwater level, and seismic activity must be considered when selecting the type of pile.
Common types of piles include driven ...
I applied via Referral and was interviewed before Feb 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Advanced Associate
144
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
74
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Associate
56
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
WSP
ARCADIS