I applied via LinkedIn and was interviewed in Oct 2020. There was 1 interview round.
Reinforcement detailing of PSC Box Girder
Reinforcement detailing is crucial for the strength and durability of PSC box girders
The detailing should be done as per the design specifications and codes
The reinforcement should be placed in such a way that it can resist the bending and shear forces
Proper spacing and cover should be maintained for the reinforcement
The detailing should also consider the construction process an
Top trending discussions
I applied via Campus Placement and was interviewed before Nov 2017. There were 5 interview rounds.
I applied via Referral and was interviewed in Mar 2022. There were 2 interview rounds.
Design of pier involves considering various factors such as load capacity, soil conditions, water level, and environmental impact.
Determine the load capacity and type of pier required
Analyze soil conditions and water level to determine foundation type
Consider environmental impact and regulations
Design for durability and maintenance
Ensure safety measures are in place
Rigid pile caps are designed to transfer the load from the superstructure to the piles. The design should consider the pile arrangement, load distribution, and soil properties.
The pile cap should be designed to distribute the load evenly to the piles.
The pile arrangement should be considered to ensure that the pile cap is not overloaded.
The soil properties should be analyzed to determine the bearing capacity of the pil...
Prestressing losses occur during the transfer of prestress from the jacks to the concrete. These losses can be divided into two stages.
The first stage is immediate losses, which occur due to friction between the strands and the ducts, anchorage slip, and elastic shortening of the concrete.
The second stage is time-dependent losses, which occur due to creep and shrinkage of the concrete, relaxation of the steel, and temp...
Design of steel members and connections involves determining the appropriate size and shape of steel components and how they are connected.
Consider the loads and stresses that the steel members will be subjected to
Select appropriate steel sections based on their strength and stiffness
Design connections that can transfer loads between members without failure
Ensure that the design complies with relevant codes and standar...
Pre-tension is applied before concrete is poured, while post-tension is applied after concrete has hardened.
Pre-tension involves stretching steel cables or bars before pouring concrete to create tension in the concrete as it sets.
Post-tension involves inserting steel cables or bars into hardened concrete and then tensioning them to create compression in the concrete.
Pre-tension is typically used in precast concrete ele...
Analysis and design of piles involves determining the load capacity and selecting the appropriate type of pile for a given soil condition.
Pile load capacity is determined through various methods such as static load tests, dynamic load tests, and pile integrity tests.
Factors such as soil type, groundwater level, and seismic activity must be considered when selecting the type of pile.
Common types of piles include driven ...
I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.
Bracing should be added in the weak axis direction to provide stability and prevent buckling.
Bracing should be added in the weak axis direction to prevent buckling.
Bracing helps to stabilize the structure and distribute loads more efficiently.
Examples of bracing in steel structures include diagonal bracing, cross bracing, and portal bracing.
Different checks in footing include bearing capacity check, settlement check, sliding check, and overturning check.
Bearing capacity check ensures the soil can support the load without failure.
Settlement check ensures the footing settles within acceptable limits.
Sliding check ensures the footing does not slide on the soil.
Overturning check ensures the footing does not overturn due to lateral forces.
One way shear occurs in footings when load is applied in one direction, while two way shear occurs when load is applied in two directions.
One way shear typically occurs in rectangular footings where the load is applied in one direction.
Two way shear occurs in square footings or when the load is applied in two directions.
One way shear is calculated using the formula Vc = 0.5 * f'c * b * d, while two way shear is calcula
I have worked on various types of structures including commercial buildings, residential homes, bridges, and industrial facilities.
Commercial buildings
Residential homes
Bridges
Industrial facilities
LOD stages in BIM refer to the Level of Development which defines the amount of detail and accuracy of a model at different stages of a project.
LOD 100: Conceptual design with basic massing and spatial relationships
LOD 200: Generalized elements with approximate quantities, size, shape, location, and orientation
LOD 300: Specific elements with accurate quantities, size, shape, location, and orientation
LOD 400: Detailed e...
posted on 17 Sep 2021
I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.
I applied via Company Website and was interviewed in Feb 2022. There was 1 interview round.
I applied via Walk-in and was interviewed in Mar 2022. There was 1 interview round.
Sir casting yard area, bed alignment of survey department properly center shuttering palet panchang,and line perfect condition,
Precast segment- properly casting yard area bed alignment and survey department cordinate with checking proper center line, segment shuttering perfect ag pr drowning dimension, jig properly arrengement of bed area
The boom length of a tower crane varies depending on the model and manufacturer.
Tower crane boom length can range from 30 meters to over 100 meters.
The boom length determines the maximum height and reach of the crane.
Factors such as weight capacity and wind speed also affect the boom length.
Some popular tower crane models and their boom lengths include: Potain MDT 98 (55 meters), Liebherr 630 EC-H 40 (40 meters), and T
based on 1 review
Rating in categories
Advanced Associate
139
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
71
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Associate
54
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
WSP
ARCADIS