Load density refers to the amount of power consumed per unit area or volume.
Load density is typically measured in watts per square meter or watts per cubic meter.
It is used in electrical design to determine the distribution of power consumption in a given space.
Higher load density may require more robust electrical systems to handle the increased power demand.
For example, data centers have high load density due to the ...
Short circuit current from 1000kVA TF (5% Z) on a panel and determine its CB Fault current rating using IEC Standard.
Calculate the short circuit current using the formula: Short circuit current = 1000kVA / (1.732 * 5%)
Determine the CB Fault current rating based on the calculated short circuit current
Refer to IEC Standard for guidelines on short circuit current calculations and CB ratings
The cable size and circuit breaker rating for a 50KW motor at 30m distance from the panel depend on factors like voltage, current, and installation conditions.
Calculate the full load current (FLC) of the motor using the formula: FLC = (Power (kW) * 1000) / (sqrt(3) * Voltage)
Select a cable size based on the FLC, voltage drop considerations, and installation conditions
Choose a circuit breaker rating based on the FLC and...
CRI stands for Color Rendering Index, a measure of how accurately a light source illuminates colors compared to natural light.
CRI is a scale from 0 to 100, with higher values indicating better color rendering.
It is important in lighting design to ensure colors appear true and vibrant.
LED lights typically have high CRI values, making them popular for applications where color accuracy is crucial.
UGR stands for Unified Glare Rating, a measure of the discomfort glare perceived by an observer.
UGR is used in lighting design to evaluate the visual comfort of lighting installations.
It takes into account factors such as the luminance of the light source, the position of the observer, and the reflectance of the surrounding surfaces.
Lower UGR values indicate less glare and better visual comfort for the occupants.
For ex...
Uniformity factor is a measure of how evenly distributed light is in a given space.
Uniformity factor is calculated by dividing the minimum illuminance level by the average illuminance level in a space.
A higher uniformity factor indicates more even lighting distribution.
Uniformity factor is important in lighting design to ensure consistent lighting levels throughout a space.
For example, in an office setting, a uniformit
Maintenance factor is a multiplier used in lighting design to account for the decrease in light output over time due to dirt, aging, and other factors.
Maintenance factor is typically a value between 0 and 1, with 1 indicating no decrease in light output over time.
It is used to adjust the initial illuminance level calculated for a space to account for the decrease in light output over the life of the lighting system.
Fac...
Reflection index in rooms refers to the amount of sound reflected off surfaces within a room.
Reflection index is important in determining the acoustics of a room.
High reflection index can lead to echoes and reverberation.
Materials like concrete and glass have high reflection index, while soft materials like carpets and curtains have low reflection index.
Exit sign lighting in corridors or pathways is designed to provide clear and visible guidance to occupants in case of emergency.
Ensure exit signs are placed at all exits and change in direction
Use photoluminescent materials for backup in case of power failure
Provide adequate lighting levels to ensure visibility in all conditions
Consider using LED lights for energy efficiency and long lifespan
Earthing design involves creating a low-resistance path for fault currents to safely dissipate into the ground.
Determine the type of earthing system needed based on the specific requirements of the electrical installation.
Calculate the required size of the earthing conductors based on the fault current levels and soil resistivity.
Ensure proper bonding of all metallic structures and equipment to the earthing system to p...
Earth loop impedance is the total impedance of the earth fault current path in an electrical circuit.
Earth loop impedance is important for ensuring the safety of electrical installations.
It is measured in ohms and is used to calculate the maximum fault current that could flow in the event of a fault.
Low earth loop impedance is desirable as it helps to quickly trip circuit breakers in case of a fault.
It is influenced by...
Designing a transformer room involves considering safety, space requirements, ventilation, and electrical codes.
Ensure proper ventilation to prevent overheating of transformers
Follow electrical codes and regulations for clearances and access
Provide adequate space for maintenance and operation of transformers
Consider safety measures such as fire protection and emergency shutdown systems
Cable tray sizing involves considering the current carrying capacity, voltage drop, and environmental factors.
Calculate the total current carrying capacity required for the cables in the tray.
Consider the voltage drop limitations based on the distance and load.
Take into account the environmental factors such as temperature, humidity, and corrosive elements.
Select the appropriate size and material of the cable tray base...
Spacing between smoke detectors depends on the type of detector and the manufacturer's recommendations.
Spacing between smoke detectors is typically around 30 feet in residential areas.
For high ceilings, detectors may need to be spaced closer together.
Consult the manufacturer's guidelines for specific spacing requirements.
Clearance between cable tray and wet service pipe is maintained by using appropriate support systems and ensuring proper spacing.
Use support systems such as clamps, hangers, and brackets to secure the cable tray and wet service pipe at appropriate distances.
Ensure proper spacing between the cable tray and wet service pipe to prevent any contact or interference.
Follow industry standards and regulations for minimum clear...
Designing a CCTV system involves selecting appropriate cameras, DVR/NVR, and cables based on requirements.
Determine the coverage area and required resolution for each camera
Select suitable cameras (e.g. dome, bullet, PTZ) based on the environment
Choose a DVR/NVR with enough storage capacity and network connectivity
Use high-quality coaxial cables (e.g. RG59) for analog cameras or Ethernet cables for IP cameras
Consider u...
Harmonics in transformers are non-linear currents or voltages that can cause overheating, increased losses, and interference in electrical systems.
Harmonics are multiples of the fundamental frequency in the power system, typically caused by non-linear loads like variable frequency drives or rectifiers.
Impacts of harmonics include increased heating in transformers, higher losses, reduced power quality, and interference ...
Top trending discussions
I applied via Campus Placement and was interviewed before Nov 2017. There were 5 interview rounds.
I applied via Referral and was interviewed in Mar 2022. There were 2 interview rounds.
Design of pier involves considering various factors such as load capacity, soil conditions, water level, and environmental impact.
Determine the load capacity and type of pier required
Analyze soil conditions and water level to determine foundation type
Consider environmental impact and regulations
Design for durability and maintenance
Ensure safety measures are in place
Rigid pile caps are designed to transfer the load from the superstructure to the piles. The design should consider the pile arrangement, load distribution, and soil properties.
The pile cap should be designed to distribute the load evenly to the piles.
The pile arrangement should be considered to ensure that the pile cap is not overloaded.
The soil properties should be analyzed to determine the bearing capacity of the pil...
Prestressing losses occur during the transfer of prestress from the jacks to the concrete. These losses can be divided into two stages.
The first stage is immediate losses, which occur due to friction between the strands and the ducts, anchorage slip, and elastic shortening of the concrete.
The second stage is time-dependent losses, which occur due to creep and shrinkage of the concrete, relaxation of the steel, and temp...
Design of steel members and connections involves determining the appropriate size and shape of steel components and how they are connected.
Consider the loads and stresses that the steel members will be subjected to
Select appropriate steel sections based on their strength and stiffness
Design connections that can transfer loads between members without failure
Ensure that the design complies with relevant codes and standar...
Pre-tension is applied before concrete is poured, while post-tension is applied after concrete has hardened.
Pre-tension involves stretching steel cables or bars before pouring concrete to create tension in the concrete as it sets.
Post-tension involves inserting steel cables or bars into hardened concrete and then tensioning them to create compression in the concrete.
Pre-tension is typically used in precast concrete ele...
Analysis and design of piles involves determining the load capacity and selecting the appropriate type of pile for a given soil condition.
Pile load capacity is determined through various methods such as static load tests, dynamic load tests, and pile integrity tests.
Factors such as soil type, groundwater level, and seismic activity must be considered when selecting the type of pile.
Common types of piles include driven ...
Good test. You need to do a good preparation to crack that.
I applied via LinkedIn and was interviewed in Aug 2023. There were 3 interview rounds.
I was interviewed in Oct 2022.
The duration of the notice period is typically specified in the employment contract.
The notice period can vary depending on the company and the position.
It is usually between 2 weeks to 3 months.
Some companies may require a longer notice period for senior positions.
The notice period can be negotiated during the hiring process.
It is important to adhere to the notice period to maintain a good professional relationship wi
I applied via Campus Placement and was interviewed in Aug 2024. There was 1 interview round.
Question where asked from trains,permutation and some grammer
posted on 17 Sep 2021
I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.
Some of the top questions asked at the Ramboll Electrical Design Engineer interview -
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Advanced Associate
139
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
71
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Associate
54
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
WSP
ARCADIS