I applied via Approached by Company and was interviewed in Nov 2023. There were 2 interview rounds.
I can help with Lidar and modeling by utilizing my knowledge and skills in data analysis, software tools, and 3D modeling techniques.
I have experience working with Lidar data and can assist in processing and analyzing the data to extract meaningful information.
I am proficient in using software tools like AutoCAD, SolidWorks, or Blender to create accurate and detailed 3D models based on Lidar data.
I can collaborate with...
Yes, alignment can be inserted with 3km stations and the triangles can be limited for the surface.
To insert alignment with 3km stations, you can use alignment design software or CAD tools.
For limiting triangles on the surface, you can use surface modeling techniques or software.
By specifying the desired triangle size or density, you can control the number of triangles on the surface.
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
Designing a floating head assembly involves considering various factors such as material selection, sealing mechanisms, and thermal expansion.
Select appropriate materials for the floating head assembly based on the application requirements.
Design effective sealing mechanisms to prevent leakage and ensure proper functioning.
Consider thermal expansion and contraction to accommodate temperature variations.
Ensure proper al...
H2S service for pressure vessel refers to the use of hydrogen sulfide in a pressure vessel.
H2S service involves the handling and containment of hydrogen sulfide gas in a pressure vessel.
Pressure vessels used in H2S service must be designed and constructed to withstand the corrosive effects of hydrogen sulfide.
Special materials and coatings may be required to prevent hydrogen sulfide from corroding the pressure vessel.
R...
Gaskets are mechanical seals used to prevent leakage between two surfaces. There are various types of gaskets available.
Sheet gaskets
Spiral wound gaskets
Ring gaskets
Metallic gaskets
Rubber gaskets
Cork gaskets
Non-asbestos gaskets
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
HRG stands for Human Resource Group while LRG stands for Large Retail Group.
HRG focuses on managing human resources within an organization
LRG focuses on managing a large retail business
HRG deals with employee relations, recruitment, training, and development
LRG deals with sales, inventory management, customer service, and marketing
Transformer sizing involves calculating the appropriate size of a transformer based on load requirements.
Determine the total load requirements in kVA
Consider the load factor and diversity factor
Calculate the transformer size based on the total load requirements
Ensure the transformer is rated for the appropriate voltage and frequency
Consult with a professional engineer if needed
I appeared for an interview in Sep 2024.
I left previous companies to pursue growth opportunities, align with my career goals, and seek better work-life balance.
I left Company A after 3 years to seek a role that offered more leadership opportunities, as I wanted to develop my management skills.
At Company B, I transitioned to a new position that aligned better with my long-term career goals in project management.
I departed from Company C to find a work environ...
posted on 10 Jan 2025
I applied via Naukri.com and was interviewed before Jan 2024. There was 1 interview round.
Developing an erection plan involves creating a detailed strategy for the construction process.
Identify project requirements and objectives
Create a timeline for completion
Allocate resources and manpower
Coordinate with subcontractors and suppliers
Ensure compliance with building codes and regulations
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
I applied via Job Portal
Maintenance schedule is a plan for regular upkeep of equipment or facilities to ensure their optimal performance.
Maintenance schedule includes regular inspections, cleaning, lubrication, and replacement of parts as needed.
It helps prevent breakdowns, prolongs equipment life, and reduces repair costs.
Examples of maintenance schedules include daily, weekly, monthly, and annual checklists.
Maintenance schedules should be t...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Advanced Associate
161
salaries
| ₹3.7 L/yr - ₹8.5 L/yr |
Design Engineer
75
salaries
| ₹4 L/yr - ₹16 L/yr |
Senior Associate
52
salaries
| ₹4.7 L/yr - ₹9.5 L/yr |
Assistant Engineer
51
salaries
| ₹5.5 L/yr - ₹10 L/yr |
Senior Engineer
50
salaries
| ₹6.5 L/yr - ₹25.5 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM