Upload Button Icon Add office photos

Samsung E&A

Compare button icon Compare button icon Compare

Filter interviews by

Samsung E&A Site Engineer Interview Questions and Answers

Updated 21 Apr 2022

Samsung E&A Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 21 Apr 2022

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Salary discussion and skills realted question.
  • Q2. 24/7 and rotate any across in india
  • Q3. Finally provided offer latter.

Interview Preparation Tips

Interview preparation tips for other job seekers - Site integration and fault management

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Precommissioning test of transformers
  • Ans. 

    Precommissioning tests of transformers ensure proper functioning and safety before energizing.

    • Visual inspection of transformer and its components

    • Measurement of insulation resistance

    • Measurement of winding resistance

    • Verification of transformer ratio and polarity

    • Verification of oil level and quality

    • Testing of protective devices

    • Verification of grounding

    • Functional testing of cooling system

    • Verification of nameplate data

  • Answered by AI
  • Q2. 11kv & 33kv overhead power line distribution
  • Ans. 

    11kv & 33kv overhead power line distribution

    • 11kv and 33kv are common voltage levels for overhead power lines

    • Overhead power lines are used to distribute electricity from power stations to consumers

    • The voltage level determines the distance the power can be transmitted and the size of the conductors needed

    • Proper insulation and grounding is important for safety

    • Maintenance and inspection of the lines is necessary to ensure

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - this interview was based on electrical basic concepts for practical site works.

I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Steel and SHUTTERING, project management
  • Q2. Hook lenght, deduction of steel in bends

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive always , face with your knowledge and attitude
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About last company works
  • Q2. About steel and concrete
  • Q3. Handling labours and supervisors
Round 3 - HR 

(2 Questions)

  • Q1. About last paid salary
  • Q2. 1)Marital status 2) accomodation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Please send me a date and time a interview one-on-one round
  • Q2. All questions are site engineer types
  • Q3. Piping and equipment erection and planning

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Behavioral 

(2 Questions)

  • Q1. Technical interview all questions about civil engineering
  • Q2. 1.) Slump test procedure 2) Tbm 3) how to calculate the wt of steel 4) about site supervision Dpr Dwr And BBS of structure 5) how to calculate concrete quantity of container wall 6) about pipe line
  • Ans. 

    Questions related to site engineering including slump test, TBM, steel weight calculation, site supervision, BBS, concrete quantity calculation, and pipeline.

    • Slump test measures the consistency of concrete. Procedure involves filling a slump cone with concrete and measuring the slump after removing the cone.

    • TBM stands for Tunnel Boring Machine, used for excavating tunnels in soil or rock.

    • Weight of steel can be calculat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Present urself confidently and give ur 100 percent to the interviewer
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Apr 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Building Constitution
  • Q2. Building Construction questions
Round 3 - One-on-one 

(1 Question)

  • Q1. Construction line se

Interview Preparation Tips

Interview preparation tips for other job seekers - Site Engineer
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I appeared for an interview in Oct 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Ask about only my experience regarding road work or fly over
  • Q2. Expected salary ..!?

Interview Preparation Tips

Interview preparation tips for other job seekers - Please keep remember about experience point like site work , maintenance work , efficiency work etc.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Design mix concrete and nominal mix difference
  • Ans. 

    Design mix concrete is a mix of concrete prepared by a designer as per the required strength and durability, while nominal mix concrete is a mix of concrete prepared based on standard ratios without specific design requirements.

    • Design mix concrete is prepared by a designer based on specific requirements for strength and durability.

    • Nominal mix concrete is prepared based on standard ratios like 1:2:4 without specific des...

  • Answered by AI
  • Q2. What is knee bracing
  • Ans. 

    Knee bracing is a structural support used in construction to prevent lateral movement of beams or columns.

    • Knee bracing is a diagonal member used to connect a vertical member to a horizontal member in a structure.

    • It helps to resist lateral forces and prevent buckling or swaying of the structure.

    • Knee bracing is commonly used in steel frame construction to provide stability and support.

    • Examples include diagonal braces con

  • Answered by AI
  • Q3. Portal frame questions

Interview Preparation Tips

Interview preparation tips for other job seekers - keep calm cool

Samsung E&A Interview FAQs

How many rounds are there in Samsung E&A Site Engineer interview?
Samsung E&A interview process usually has 2 rounds. The most common rounds in the Samsung E&A interview process are Resume Shortlist and HR.
What are the top questions asked in Samsung E&A Site Engineer interview?

Some of the top questions asked at the Samsung E&A Site Engineer interview -

  1. 24/7 and rotate any across in in...read more
  2. Finally provided offer latt...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 760 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 119 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
AtkinsRealis Interview Questions
3.9
 • 89 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
View all
Samsung E&A Site Engineer Salary
based on 6 salaries
₹3.9 L/yr - ₹15.3 L/yr
149% more than the average Site Engineer Salary in India
View more details

Samsung E&A Site Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Senior Engineer
151 salaries
unlock blur

₹10.9 L/yr - ₹32 L/yr

Process Engineer
51 salaries
unlock blur

₹6 L/yr - ₹14.5 L/yr

Piping Designer
48 salaries
unlock blur

₹4.4 L/yr - ₹16 L/yr

Piping Engineer
47 salaries
unlock blur

₹6 L/yr - ₹20 L/yr

Instrument Engineer
38 salaries
unlock blur

₹6.8 L/yr - ₹26.8 L/yr

Explore more salaries
Compare Samsung E&A with

L&T Construction

4.0
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare

AtkinsRealis

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview