Precommissioning tests of transformers ensure proper functioning and safety before energizing.
Visual inspection of transformer and its components
Measurement of insulation resistance
Measurement of winding resistance
Verification of transformer ratio and polarity
Verification of oil level and quality
Testing of protective devices
Verification of grounding
Functional testing of cooling system
Verification of nameplate data
11kv & 33kv overhead power line distribution
11kv and 33kv are common voltage levels for overhead power lines
Overhead power lines are used to distribute electricity from power stations to consumers
The voltage level determines the distance the power can be transmitted and the size of the conductors needed
Proper insulation and grounding is important for safety
Maintenance and inspection of the lines is necessary to ensure
posted on 20 Jul 2017
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
posted on 16 Feb 2025
I appeared for an interview before Feb 2024.
posted on 29 May 2024
I applied via Company Website and was interviewed before May 2023. There was 1 interview round.
Initial setting time is the time taken for the cement to harden to a certain degree, while final setting time is the time taken for the cement to completely harden.
Initial setting time is typically around 30 minutes to 1 hour after adding water to the cement.
Final setting time is usually around 2 to 4 hours after adding water to the cement.
Setting time can vary based on the type of cement and environmental conditions.
S
Bleeding is the process of air escaping from fresh concrete mix and rising to the surface.
Bleeding occurs when water in the concrete mix rises to the surface due to settlement of solid particles.
It can lead to surface defects if not properly managed.
Bleeding can be reduced by using proper mix design and techniques like vibration or adding admixtures.
Excessive bleeding can weaken the surface of the concrete.
Examples: Wa...
posted on 15 Jun 2024
posted on 29 Dec 2023
I applied via Company Website and was interviewed before Dec 2022. There were 3 interview rounds.
Cement test, bitumen test, road density, ravite, autocad
Concrete properties grade
I appeared for an interview in Oct 2022.
based on 1 interview
Interview experience
Senior Engineer
129
salaries
| ₹6.2 L/yr - ₹22.5 L/yr |
Process Engineer
127
salaries
| ₹3.8 L/yr - ₹14 L/yr |
Senior Principal Engineer
113
salaries
| ₹15 L/yr - ₹35 L/yr |
Piping Designer
105
salaries
| ₹3.7 L/yr - ₹12.8 L/yr |
Deputy Manager
95
salaries
| ₹7 L/yr - ₹23 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM