I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
What people are saying about AECOM
I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.
Core is the central part of a structure or object that provides strength and stability.
Core is commonly used in construction and engineering.
It is the central part of a building or structure that provides support and stability.
In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.
Examples of core materials include concrete, steel, and wood.
A strong core is important for maintain
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
Building Information Modeling (BIM) is a digital representation of a building's physical and functional characteristics.
BIM allows for collaboration and communication between architects, engineers, and contractors.
It can be used for design, construction, and maintenance of buildings.
BIM includes information on materials, equipment, and systems used in the building.
Examples of BIM software include Autodesk Revit, ArchiC...
I applied via Job Fair and was interviewed in Oct 2024. There were 3 interview rounds.
One way slab is supported on two opposite sides, while two way slab is supported on all four sides.
One way slab is designed to carry loads predominantly in one direction.
Two way slab is designed to carry loads in both directions.
One way slab is more economical for smaller spans, while two way slab is more suitable for larger spans.
Examples: One way slab - balcony, corridor. Two way slab - office building, parking garag
posted on 31 Jan 2024
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
Curing is the process of maintaining moisture and temperature conditions in concrete for a specific period to ensure proper hydration and strength development.
Curing helps in preventing moisture loss from the concrete, which is essential for proper hydration.
It helps in maintaining the desired temperature for the chemical reactions to occur.
Curing enhances the strength, durability, and overall performance of the concre...
I applied via Job Fair and was interviewed before Jan 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.
The type of pipe line and its standards depend on the specific project requirements and industry standards.
The type of pipe line can vary based on the material being transported, such as water, gas, oil, etc.
Common types of pipe lines include water supply lines, sewer lines, natural gas lines, oil pipelines, etc.
The standards followed for pipe lines depend on the country, industry, and specific project requirements.
Som...
Different standards exist for related materials in construction.
Standards ensure quality and safety of materials used in construction.
Examples of standards include ASTM, ISO, and EN.
Standards may vary by country or region.
It is important for site engineers to be familiar with relevant standards and ensure compliance.
Production refers to the process of creating goods or services using resources and labor.
Production involves transforming raw materials into finished products or providing services to customers.
It includes activities such as manufacturing, assembly, packaging, and distribution.
Examples of production include car manufacturing, food processing, and software development.
Efficient production is essential for businesses to
I applied via Campus Placement and was interviewed in Sep 2023. There were 3 interview rounds.
The duration of the aptitude test was 120 minutes (2 hrs), for 130 questions (including 100 Logical Reasoning, Verbal ability, Quantitative Ability and other 30 questions from TECHNICAL DOMAIN), Mine was Civil Background. Technical Questions were quite moderate to tough. Whereas, first 100 questions of LR, VA, Quant was quite easy and short.
based on 2 interviews
Interview experience
based on 17 reviews
Rating in categories
Project Engineer
224
salaries
| ₹5.5 L/yr - ₹20 L/yr |
Senior Engineer
194
salaries
| ₹7.7 L/yr - ₹28 L/yr |
L2 Engineer
143
salaries
| ₹3.4 L/yr - ₹10.5 L/yr |
Associate Director
131
salaries
| ₹25 L/yr - ₹49 L/yr |
Architect
130
salaries
| ₹4.1 L/yr - ₹14.9 L/yr |
Jacobs Engineering Group
Fluor Corporation
Bechtel
Worley